单选题The safe working load of each derrick is five ().AtonesBtonnagesCtonsDdunnage
单选题
The safe working load of each derrick is five ().
A
tones
B
tonnages
C
tons
D
dunnage
参考解析
解析:
暂无解析
相关考题:
Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years
The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨
英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t
这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.
Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading
You are working on an existing Web site. You need to secure the Web site by redirecting all users to the logon page, Login.aspx. After logging on, users must be sent back to the page that they originally requested. Which code segment should you use? ()A、 In the Web.config file: authorization deny users=”?”//authorization On each page in the Web site: void Page_Load(Object sender, EventArgs E){ FormsAuthentication.Initialize(); //Rest of the Page_Load code goes here}B、On each page in the Web site: void Page_Load(Object sender, EventArgs E){ FormsAuthentication.RedirectToLoginPage(“login.aspx”); //Rest of the Page_Load code goes here}C、On each page in the Web site: void Page_Load(Object sender, EventArgs E){ Response.Redirect(“login.aspx”);//Rest of the Page_Load code goes here}D、In the Web.config file: authentication mode=”Forms” forms name=”.ASPXUSERDEMO” loginUrl=”login.aspx” protection=”All”timeout=”60” / /authentication
单选题这个吊杆的安全工作负荷是6吨。()AThe SWL of the derrick is five tons.BThe SWL of the heavy derrick is six tons.CThe SWL of the derrick is six tons.DThe SWL of the crane is six tons.
单选题In determining a safe speed()shall not be among those taken into account.Athe characteristics,efficiency and limitation of the radar equipmentBany constraints imposed by the radar range scale in useCthe effect on radar detection of the sea state,weather and other sources of interferenceDthe safe working load of the cranes both on board and ashore
单选题During operation, the ()should check the working condition of the derrick.AforemanBoperatorCopenerDstevedore
单选题Which statement is TRUE about nylon line?()AManila line will usually last longer than nylon lineBNylon line is excellent for use in alongside towingCA normal safe working load will stretch nylon line 50%DNylon stoppers should be used with nylon line
单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().Aone-half the SWL of the main towing hawserBthree-fourths the SWL of the main towing hawserCthat of the main towing hawserDtwice that of the main towing hawser
单选题Thirty-five percent of the breaking strength of an anchor cable is generally accepted as the().Asafe operating loadBnormal operating tensionCemergency working loadDallowable storm load
单选题Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().Aafter torque causes line pull to exceed the rated capacity of the winchBbefore the line pull reaches the rated capacity of the winchCwhen the line pull reaches the breaking strength of the fallDbefore the safe working load of the fall is reached
单选题The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().AdeckBhead of the boomCheel of the boomDmast or king post
单选题The safe working load of the derrick is 5 tons.()A吊杆的安全工作负荷量是5吨B龙门吊的安全工作负荷量是5吨C起货机的安全工作负荷量是5吨D重吊杆的安全工作负荷量是5吨
单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().AyearBtwo yearsCfour yearsDfive years