单选题安全负荷量()Athe loadBsafe working loadCsafe workingDsafe loading work
单选题
安全负荷量()
A
the load
B
safe working load
C
safe working
D
safe loading work
参考解析
解析:
暂无解析
相关考题:
In terms of vessel manning,a watch is the ______.A.direct performance of deck or engine operations in a scheduled and fixed rotationB.performance of maintenance work necessary for the vessel's safe operation,on a daily basisC.performance of lookout dutiesD.direct performance of cargo loading and discharge operations only
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨
英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t
What are two uRPF working modes?()A、express modeB、safe modeC、loose modeD、strict modeE、tight mode
Safe Mode is an essential Startup tool for troubleshooting Windows 98. Which two methods cause the system to start up in Safe Mode?()A、start the system in DOS Mode and run the WIN /S commandB、press the key while restarting system - select Safe ModeC、start the system in DOS Mode and run the safe.EXE fileD、hold key while restarting the system; select Safe Mode
故障安全控制系统FSC的英文全称是()。A、Fail safe control systemB、Fail system controlC、Fail safe computerD、Fail safe control
Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading
单选题Before welding is permitted on a fuel tank, it must be certified or declared ()Asafe for becoming roundedBsafe for hot workCnot safe for personnelDnot safe for hot work
单选题The safety management objectives of the ISM Code are ().Ato provide for safe practices in ship operation and a safe working environmentBto establish safeguards against all identified risksCto continuously improve safety management skills of personnel, including preparing for emergenciesDall the above
单选题Sailors should know the ()(安全工作负荷量)of derricks.Asafe working loadBsafety work loadCsafe work loadDsafe working loading
单选题In determining a safe speed()shall not be among those taken into account.Athe characteristics,efficiency and limitation of the radar equipmentBany constraints imposed by the radar range scale in useCthe effect on radar detection of the sea state,weather and other sources of interferenceDthe safe working load of the cranes both on board and ashore
单选题A continuous sounding of a fog-signal apparatus indicates().Athe vessel is in distressBthe vessel has completed loading dangerous cargoCit is safe to passDthe vessel is anchored
单选题In terms of vessel manning,a watch is the().Adirect performance of deck or engine operations in a scheduled and fixed rotationBperformance of maintenance work necessary for the vessel's safe operation,on a daily basisCperformance of lookout dutiesDdirect performance of cargo loading and discharge operations only
单选题The safe working load of the derrick is 5 tons.()A吊杆的安全工作负荷量是5吨B龙门吊的安全工作负荷量是5吨C起货机的安全工作负荷量是5吨D重吊杆的安全工作负荷量是5吨
单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().AyearBtwo yearsCfour yearsDfive years
单选题安全负荷量()Athe loadBsafe working loadCsafe workingDsafe loading work