单选题An administrator is ordering a new Power 550. They will mirror rootvg and are concerned about single points of failure. Which of the following features should be ordered?()ADual I/O planar, dual disk drives, dual SCSI adaptersBDual disk drive enclosures, dual disk drives, extra media bayCDual disk drive enclosures, dual disk drives and dual SCSI adaptersDDual I/O planar, extra media bay, dual disk drives

单选题
An administrator is ordering a new Power 550. They will mirror rootvg and are concerned about single points of failure. Which of the following features should be ordered?()
A

Dual I/O planar, dual disk drives, dual SCSI adapters

B

Dual disk drive enclosures, dual disk drives, extra media bay

C

Dual disk drive enclosures, dual disk drives and dual SCSI adapters

D

Dual I/O planar, extra media bay, dual disk drives


参考解析

解析: 暂无解析

相关考题:

修正的内部收益率(MIRR)

The system administrator did a new install of AIX on a server about a week ago. The system was not rebooted after the installation. CDE is running on this system as is TCPIP. The system administrator has started configuring the system percompany directives. The power cable was inadvertently disconnected from the wall causing the sever to lose power. Upon reboot, the system appears to hang during log in from the console or from Xterminals. Which of the following is the most probable cause?()A、It is a hardware problem caused by the power failure.B、There is a network problem, most probably with name resolution.C、Sine the system was never rebooted, devices are marked defined instead of available and need to be activated.D、Some filesets may be marked as broken and need to be reinstalled.

A technician has just installed a new power supply into a desktop computer and now the computer will not turn on. Which of the following is the MOST likely cause?()A、The voltage selector switch on the power supply is set incorrectly.B、The 3.3v power line is connected to the wrong input on the motherboard.C、The new power supply voltage rating is too high.D、The 12v power cord is installed incorrectly.

After installing a second processor and corresponding heatsink into a server, an administrator notices that the new processor is not showing up during POST.  Which of the following could be the cause of this issue?()A、 The power supply is not sufficient to power the server.B、 The voltage regulator module (VRM) was not installed.C、 The IRQ setting was not set.D、 The DMA setting was not set.

A server will not power on. Which of the following devices should the administrator use FIRST to determine the problem?()A、Loop back plugsB、Power supply testerC、System logsD、TDR

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A、Verify uninterruptible power supply (UPS) loadB、Verify if server consumes 220VC、Verify CPU loadD、Verify if server consumes 110V

A technician has just installed an upgraded graphics card. The computers power turns off before itfinishes booting. Which of the following is the cause of the problem? ()A、The monitor cannot display the increased resolution that is a feature of the new graphics card.B、The power supply does not provide enough wattage to power the new graphics card.C、The new graphics card is incompatible with the existing processor.D、The computer does not have enough RAM to support the new graphics card.

During a review of environmental requirements before ordering an IBM System z9 server and IBM System Storage DS8700, the customer states that the available power is 220 volts AC.  Which feature should be included with the DS8700 order()  A、Low VoltageB、High VoltageC、Remote System z Power ControlD、Battery Assembly

A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

A System x administrator is considering new storage subsystems. Which is a benefit of SAS over Solid State of the following?()A、Higher transfer speedsB、Increased power consumption with Solid StateC、Increased bandwidthD、Cost per MB

An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A、The administrator will need to perform an rg_move operationB、The administrator will need to un-manage and re-manage the resource groupC、The administrator will need to execute the new start script from the command lineD、The new start script will be executed as part of the DARE operation to synchronize the cluster

An administrator is interested in implementing multiple shared processor pools on a new Power 595.  How many user-customizable multiple shared processor pools are available?()A、 63B、 64C、 254D、 255

A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2.  Which of the following virtualization technologies can be used?()A、DLPARB、Micro-PartitioningC、Virtual StorageD、Virtual Ethernet

A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

An administrator is ordering a new Power 550. They will mirror rootvg and are concerned about single points of failure.  Which of the following features should be ordered()A、Dual I/O planar, dual disk drives, dual SCSI adaptersB、Dual disk drive enclosures, dual disk drives, extra media bayC、Dual disk drive enclosures, dual disk drives and dual SCSI adaptersD、Dual I/O planar, extra media bay, dual disk drives

Company.com is ordering a new p5-570 and planning for the option of using Capacity on  Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()A、Use Micro-PartitioningB、Configure a Virtual I/O ServerC、Configure dynamic logical partitionsD、Activate Advanced POWER Virtualization

You need to design a domain model that meets the company business and security requirements for controlling access to the new Web-based ordering application. What should you do?()A、Create a child OU within the existing domainB、Create a child domain of the existing domainC、Create a new domain in a new forest. Configure the new domain to trust the existing domainD、Create a new tree in the existing forest. Configure the new domain to trust the existing domain

单选题The system administrator did a new install of AIX on a server about a week ago. The system was not rebooted after the installation. CDE is running on this system as is TCPIP. The system administrator has started configuring the system percompany directives. The power cable was inadvertently disconnected from the wall causing the sever to lose power. Upon reboot, the system appears to hang during log in from the console or from Xterminals. Which of the following is the most probable cause?()AIt is a hardware problem caused by the power failure.BThere is a network problem, most probably with name resolution.CSine the system was never rebooted, devices are marked defined instead of available and need to be activated.DSome filesets may be marked as broken and need to be reinstalled.

单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()AA desk, as it not rack mountableBEthernet connections to the POWER5 systemsCSerial connections to the POWER5 systemsDUSB connections for the keyboard and mouse

单选题An administrator is interested in implementing multiple shared processor pools on a new Power 595.  How many user-customizable multiple shared processor pools are available?()A 63B 64C 254D 255

单选题An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()AThe administrator will need to perform an rg_move operationBThe administrator will need to un-manage and re-manage the resource groupCThe administrator will need to execute the new start script from the command lineDThe new start script will be executed as part of the DARE operation to synchronize the cluster

单选题An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()AHBA is compatible with the SAN fiber switch.BUpdate the newly installed server with the latest KVM drivers.CThe UPS will continue to perform as expected with the additional load.DVerify the server NIC is compatible with the NAS.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

单选题A system administrator is creating four LPARs on a Power 550. The Power 550 has 64GB of memoryinstalled and 32GB activated. The system administrator sets the minimum dedicated memory to 8GB in the profile for each LPAR. After activating three LPARs, he is not able to activate the fourth LPAR. What is the likely cause of the problem?()AThe Power 550 is licensed for three LPARs only.BThere is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. A faulty memory DIMM is detected in the POWER5 550.CThere is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The HMC reserves some memory toperform logical partition tasks.DThere is not enough memory to meet the minimum dedicated memory requirement for the fourth LPAR. The hypervisor reserves some memory to perform logical partition tasks.

单选题After installing a second processor and corresponding heatsink into a server, an administrator notices that the new processor is not showing up during POST.  Which of the following could be the cause of this issue?()A The power supply is not sufficient to power the server.B The voltage regulator module (VRM) was not installed.C The IRQ setting was not set.D The DMA setting was not set.

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMCBAsynchronous adapters on the new HMCCThe two 570 servers are directly connected to the new HMCDOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A Verify uninterruptible power supply (UPS) loadB Verify if server consumes 220VC Verify CPU loadD Verify if server consumes 110V