An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A、Verify uninterruptible power supply (UPS) loadB、Verify if server consumes 220VC、Verify CPU loadD、Verify if server consumes 110V

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()

  • A、Verify uninterruptible power supply (UPS) load
  • B、Verify if server consumes 220V
  • C、Verify CPU load
  • D、Verify if server consumes 110V

相关考题:

While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.Which of the following could be done to prevent this problem?()A. Use ESD equipment.B. Verify correct voltages are being supplied.C. Use a system board tester to check for compatibility issues.D. Install compatible PCI cards

Which of the following is the MOST important physical consideration when deploying a new server?() A. Humidity monitors, Biometrics, and fire suppressionB. Cooling, rack space, and power requirementsC. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD. Biometrics, fire suppression, and power requirements

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?() A. Verify uninterruptible power supply (UPS) loadB. Verify if server consumes 220VC. Verify CPU loadD. Verify if server consumes 110V

A VPN connection is not working correctly and the technician is unable to ping the VPN server.Which of the following actions should the technician do FIRST?() A. Call their local ISPB. Verify the IP information of the serverC. Check their local Internet connectionD. Verify the hostname of the server

After a server has been installed into a rack, an administrator must ensure which of the following?() A. Warm air flow is permitted through the front bezelB. The system is labeled so that it can be identifiedC. Verify the change control process can be implementedD. Determine the correct power requirements

An administrator is in charge of several remote servers in Japan. Users call and complain they cannot connect to the company’s resources located on those servers. Which of the following commands would allow the administrator to verify the servers are running?()A、pingB、netstatC、nbtstatD、telnet

Users report that they are unable to connect to a server. An administrator confirms that it is unreachable across the network. Other administrators have been working in the server room throughout the day.  Which of the following is the NEXT step the administrator should take?()A、 Verify the configuration of the connected port on the network switch.B、 Reboot the server.C、 Install a new NIC on the server.D、 Verify that network cables are connected.

A VPN connection is not working correctly and the technician is unable to ping the VPN server. Which of the following actions should the technician do FIRST?()A、Call their local ISPB、Verify the IP information of the serverC、Check their local Internet connectionD、Verify the hostname of the server

An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()A、HBA is compatible with the SAN fiber switch.B、Update the newly installed server with the latest KVM drivers.C、The UPS will continue to perform as expected with the additional load.D、Verify the server NIC is compatible with the NAS.

After a server has been installed into a rack, an administrator must ensure which of the following?()A、Warm air flow is permitted through the front bezelB、The system is labeled so that it can be identifiedC、Verify the change control process can be implementedD、Determine the correct power requirements

Which of the following is the BEST sequence to bare metal restore a server?()A、 Determine backups available, restore backups, and verify data.B、 Restore applications, restore data, and verify data.C、 Restore OS, restore system applications, and restore data.D、 Contact end users of outage, restore backup data, and verify data.

A Windows server has rebooted by itself several times.There are several functioning non-Windows servers in the same rack that are connected to the same uninterruptible power supply(UPS).Which of the following is the MOST likely cause of the reboots?()A、The UPS is malfunctioning.B、The user traffic to the server is too high.C、A BSOD is occurring.D、The non-Windows servers cannot be located on the same UPS as the Windows server.

Which of the following is MOST useful in HVAC planning? ()A、 Uninterruptible Power Supply (UPS) loadB、 HumidityC、 AmperageD、 VoltageE、 Temperature

An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A、 Verify uninterruptible power supply (UPS) loadB、 Verify if server consumes 220VC、 Verify CPU loadD、 Verify if server consumes 110V

A server administrator implements a solution that should fix an issue. Which of the following should the administrator do NEXT in the troubleshooting process?()A、Notify users impacted by the problemB、Verify full system functionalityC、Document the actions and outcomesD、Identify the scope of the problem

Which of the following factors is the MOST important to consider when choosing an uninterruptible power supply (UPS) for a single server? ()A、 UPS form factorB、 Server form factorC、 Server power supplys wattage ratingD、 Desired runtime

Which of the following is the MOST important physical consideration when deploying a new server?()A、 Humidity monitors, Biometrics, and fire suppressionB、 Cooling, rack space, and power requirements冷C、 Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、 Biometrics, fire suppression, and power requirements

Which of the following is the MOST important physical consideration when deploying a new server?()A、Humidity monitors, Biometrics, and fire suppressionB、Cooling, rack space, and power requirementsC、Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、Biometrics, fire suppression, and power requirements

While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.  Which of the following could be done to prevent this problem? ()A、 Use ESD equipment.B、 Verify correct voltages are being supplied.C、 Use a system board tester to check for compatibility issues.D、 Install compatible PCI cards

As part of fallover testing of a corporate database server, client application connectivity must be  verified. Which of the following would best verify the application functionality?()  A、 Perform a ping client verification test.B、 Review the number of active application processes.C、 Perform successful reads and writes to the application.D、 Run netstat -an to verify client connections to the listening ports.

单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A Verify uninterruptible power supply (UPS) loadB Verify if server consumes 220VC Verify CPU loadD Verify if server consumes 110V

单选题Which of the following is the MOST important physical consideration when deploying a new server?()A Humidity monitors, Biometrics, and fire suppressionB Cooling, rack space, and power requirements冷C Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD Biometrics, fire suppression, and power requirements

单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()AVerify uninterruptible power supply (UPS) loadBVerify if server consumes 220VCVerify CPU loadDVerify if server consumes 110V

单选题A Windows server has rebooted by itself several times.There are several functioning non-Windows servers in the same rack that are connected to the same uninterruptible power supply(UPS).Which of the following is the MOST likely cause of the reboots?()AThe UPS is malfunctioning.BThe user traffic to the server is too high.CA BSOD is occurring.DThe non-Windows servers cannot be located on the same UPS as the Windows server.

单选题Users report that they are unable to connect to a server. An administrator confirms that it is unreachable across the network. Other administrators have been working in the server room throughout the day.  Which of the following is the NEXT step the administrator should take?()A Verify the configuration of the connected port on the network switch.B Reboot the server.C Install a new NIC on the server.D Verify that network cables are connected.

单选题An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()AHBA is compatible with the SAN fiber switch.BUpdate the newly installed server with the latest KVM drivers.CThe UPS will continue to perform as expected with the additional load.DVerify the server NIC is compatible with the NAS.

单选题Which of the following factors is the MOST important to consider when choosing an uninterruptible power supply (UPS) for a single server? ()A UPS form factorB Server form factorC Server power supplys wattage ratingD Desired runtime

单选题While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.  Which of the following could be done to prevent this problem? ()A Use ESD equipment.B Verify correct voltages are being supplied.C Use a system board tester to check for compatibility issues.D Install compatible PCI cards