单选题A load line for a ship is assigned by the().AMinerals Management ServiceBDepartment of EnergyCCorps of EngineersDA recognized classification society approved by the Coast Guard

单选题
A load line for a ship is assigned by the().
A

Minerals Management Service

B

Department of Energy

C

Corps of Engineers

D

A recognized classification society approved by the Coast Guard


参考解析

解析: 暂无解析

相关考题:

Compliance with the terms of the load line certificate on a ship is the responsibility of the ______.A.Ballast Control OperatorB.Barge SupervisorC.Master or Offshore Installation ManagerD.operators representative

Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.A.18 monthsB.2 yearsC.3 yearsD.5 years

A load line for a ship is assigned by the ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved by the Coast Guard

When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?A.Once a dayB.At the change of every watchC.Only when in fresh or brackish waterD.Prior to getting underway

The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

A load line of a ship is assigned by ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved

单选题The downflooding angle for a ship is the maximum angle at which().Astability is positiveBneutral equilibrium existsCthe load line is not submergedDintact stability curves are valid

单选题The downflooding angle for a ship is the minimum angle at which().Athe load line becomes submergedBa non-watertight opening is at still water levelCoffset becomes excessiveDreserve buoyancy is a maximum

单选题Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().A18 monthsB2 yearsC3 yearsD5 years

单选题Berthing means bringing a vessel to her berth until().Athe ship is made fastBthe ship‟s first line is sent ashoreCthe ship is dredging anchorDthe ship‟s pilot disembarks

单选题When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().ASBTCWDF

单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ALCGBtransverse momentCrighting momentDinclining moment

单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().AINTERNATIONAL LOAD LINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION

单选题When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().ASBTCWDF

单选题A load line is assigned to a ship to insure adequate stability and().Amooring tensionBriser tensionClifesaving equipmentDstructural strength

单选题Which is the summer load waterline on the load waterline mark?().AThe first line at the bottomBThe second line from the bottomCThe third line from the bottomDThe fourth line from the bottom

单选题Compliance with the terms of the load line certificate on a ship is the responsibility of the().ABallast Control OperatorBBarge SupervisorCMaster or Offshore Installation ManagerDoperators representative

单选题A load line of a ship is assigned by the().Aminerals management serviceBDepartment of energyCcorps of engineersDa recognized classification socitey approved

单选题The International Load Line Certificate is a document indicating () of the various load lines of the vessel.AdecksBcabinsCholdsDpositions

单选题The holding power of an anchor is the().Amaximum sustained vertical load an anchor will resist before draggingBmaximum sustained horizontal load an anchor will resist before draggingCmaximum sustained vertical load an anchor will resist before the mooring line breaksDmaximum sustained horizontal load an anchor will resist before the mooring line breaks

单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题()is not a static load.AActual weight of the ship's structure,outfitting,equipment and machineryBBallast load(weight)CCargo loadDSlamming and sloshing load

单选题The duration of an Internationl Load Line Exemption Certificate issued by an Administration to a ship exempted under paragraph(2) of article 6 shall not exceed。()A2yearB3yearsC4yearsD5years

单选题Your assigned emergency station aboard ship can be found on the ship’s ()Astation billBclearance papersCcertificate of inspectionDpermit to proceed

单选题Which is the winter load waterline on the load waterline mark?().AThe line over the summer load waterlineBThe line above the tropical load waterlineCThe line below the tropical load waterlineDThe line between the summer and the winter north Atlantic load waterline

单选题The document that certifies the correctness of the load line marks on a ship is called the ().ACertificate of InspectionBLoad line certificateCCertificate of DocumentationDSOLAS Certificate

单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().Aboom angleBboom strengthCload radiusDcable strength