单选题Which is the summer load waterline on the load waterline mark?().AThe first line at the bottomBThe second line from the bottomCThe third line from the bottomDThe fourth line from the bottom

单选题
Which is the summer load waterline on the load waterline mark?().
A

The first line at the bottom

B

The second line from the bottom

C

The third line from the bottom

D

The fourth line from the bottom


参考解析

解析: 暂无解析

相关考题:

The difference in tones between the displacement in salt water at summer load waterline and the light weight of the vessel is______.A.gross tonnageB.net tonnageC.DisplacementD.deadweight

Which command is used to load the rescue configuration?() A. load override rescueB. rollback rescueC. load replace rescue-configurationD. rollback 49

Which command is used to restore a Junos device to its default state?() A. load factory-defaultB. load override factory-defaultC. load replace defaultD. load set default

Deadweight is ________ .A.the tonnes of the displacement of a vessel in water of a specific gravity of 1.025 at summer load water lineB.the difference in tonnes between the displacement in salt water at summer load waterline and the light weight of the vesselC.the cargoes in tonnes that can be loaded in a vessel at summer load water lineD.the bale capacity in cubic meters of a vessel

Which statement about damage control is TRUE ________.A.A hole in the hull at the waterline is more dangerous than a hole below the inner bottomB.The amount of water entering a ship through a hole varies inversely to the area of the holeC.Water flowing into a lower compartment on a ship is more dangerous than water on deck or flowing into an upper compartmentD.Water flowing over the forecastle bulwark is more dangerous than a hole in the hull at the waterline

Which command is used to load the rescue configuration?()A、load override rescueB、rollback rescueC、load replace rescue-configurationD、rollback 49

The holds are divided by ().A、bulkheadB、bulwarkC、bitumenD、waterline

waterline()A、甲板线B、水线C、吃水D、干线

舷墙()A、bitumenB、bulkheadC、bulwarkD、waterline

The function of ()is to prevent sailors from overboarding.A、bulwarkB、bulkheadC、bitumenD、waterline

Definition of Length:()A、The length shall be taken as 96% of the total lengthB、The length shall be taken as 96% of the LbpC、The length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelD、The length from the fore side of the stem to the axis of the rudder stock on that waterline

Which of the following is the FINAL step in the backup process?()A、 Load differential tapeB、 Verify backupC、 Load new tapesD、 Perform a full backup

Which element, defined as a child of a  element in the web application deployment descriptor, guarantees a servlet will be initialized at the time the application is deployed?() A、 load-on-startup/ B、 load-on-startup1/load-on-startup C、 load-on-startup-1/load-on-startup D、 load-on-startuptrue/load-on-startup

Which command is used to restore a Junos device to its default state?()A、load factory-defaultB、load override factory-defaultC、load replace defaultD、load set default

单选题Reserve buoyancy is().Aalso called GMBthe void portion of the ship below the waterline which is enclosed and watertightCaffected by the number of transverse watertight bulkheadsDthe watertight portion of a vessel above the waterline

单选题What is reserve buoyancy?().AThe amount of buoyancy measured in foot/tonsBThe vertical distance above the waterline inside the hullCThe volune of space that is filled with waterDThe volume of intact space above the waterline

单选题Which element, defined as a child of a  element in the web application deployment descriptor, guarantees a servlet will be initialized at the time the application is deployed?()A load-on-startup/ B load-on-startup1/load-on-startup C load-on-startup-1/load-on-startup D load-on-startuptrue/load-on-startup

单选题The force acting on a single cargo runner which is vertically lifting or lowering a load is greatest when().Adecelerating when lowering the loadBdecelerating when raising the loadClowering the load at constant speedDraising the load at constant speed

单选题The minimum length of a boat painter for a lifeboat in ocean service is().A60 fathomsBthe distance from the main deck to the light waterlineCtwice the distance from the main deck to the light waterline or 50 feet whichever is greaterDtwo times the distance from the boat deck to the light waterline or 50 feet whichever is greater

单选题The distance between the bottom of the hull and the waterline is called ().AtonnageBreserve buoyancyCdraftDfreeboard

单选题Which of the following is the FINAL step in the backup process?()A Load differential tapeB Verify backupC Load new tapesD Perform a full backup

单选题The agency which assigns load lines and issues Load Line Certificates is the ().Athe Bureau of ShippingBSecretary of CommerceCthe CustomsDMSA or Coast Guard

单选题A vessel is equipped with cross-connected deep tanks. In which situation should the cross-connection valve be closed? ()AThe tanks lie above the waterline and are filledBThe tanks are partially filled with dry cargoCThe tanks are partially filled with liquid cargoDThe tanks are filled and lie below the waterline

单选题From the waterline to the ship’s()(底部) is called draft.AtopBbridgeCbottomDmiddle

单选题Which is the winter load waterline on the load waterline mark?().AThe line over the summer load waterlineBThe line above the tropical load waterlineCThe line below the tropical load waterlineDThe line between the summer and the winter north Atlantic load waterline

单选题A vessel is equipped with cross-connected deep tanks.In which situation should the crossconnection valve be closed?().AThe tank lie above the waterline and are filledBThe tank are partically filled with dry cargoCThe tanks are partially filled with liquid cargoDThe tanks are filled and lie below the waterline

单选题What does MBDD mean on the load waterline mark?().ATimber tropical load waterlineBTimber summer load waterlineCTimber winter load waterlineDTimber winter north Atlantic load waterline