单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().Aboom angleBboom strengthCload radiusDcable strength

单选题
On a ship crane,the load chart relates the allowable load to the combination of boom length and().
A

boom angle

B

boom strength

C

load radius

D

cable strength


参考解析

解析: 暂无解析

相关考题:

The stevedores are going to load your ship in ________ daysA.fewB.a fewC.littleD.a little

The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

The Master or person in charge of a ship shall ensure the crane record book shows the ______.A.Date and description of each failureB.Average load in pounds for each usageC.Total number of lifts for each usageD.All of the above

What does “evel-luffing” accomplish during crane operations ________.A.It prevents the load from swinging when the boom level is adjustedB.Less power is needed when topping the boom with a load on the hookC.It maintains the height of the load above the deckD.All of the above

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.A.LCGB.longitudinal momentC.righting momentD.inclining moment

The ()(浮吊) can float on water used to load and unload the cargo.A、floating craneB、jumbo boomC、union purchaseD、crane

单选题When ship is fouled, increasing the fuel injection for keeping the normal speed will cause the main engine ()Ato work as overload characteristicBoverspeedCover mechanical load onlyDover thermal load only

单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().Awinch speedBboom strengthCload radiusDcable strength

单选题In cargo crane, () for lifting the load.Aa hoisting motorBa luffing motorCa mooring motorDa slewing motor

单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ALCGBtransverse momentCrighting momentDinclining moment

单选题Which statement(s) is/are TRUE concerning crane cargo operations? ()ADo not exceed rated load capacity of crane and container spreader or slingsBDuring any cargo handling operation,the safety of personnel is paramountCCargo handlers must be outfitted with adequate protection from personal injuryDAll the above

单选题The center of gravity of a freely swinging load suspended from a pedestal crane acts as if it were located at the().AcounterweightBpedestalClongitudinal centerlineDpoint of suspension

单选题Stanchions prevent the entire deck load on a ship from being carried by the().AbulkheadsBstringersCframes and beam bracketsDdeck longitudinals

单选题A load line is assigned to a ship to insure adequate stability and().Amooring tensionBriser tensionClifesaving equipmentDstructural strength

单选题The Master or person in charge of a ship shall ensure the crane record book shows the().ADate and description of each failureBAverage load in pounds for each usageCTotal number of lifts for each usageDAll of the above

单选题Please()that my ship is ready in every respect to load her cargo.AadvisedBto be advisedCbe advisedDare advised

单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().Awinch speedBboom strengthCload radiusDcable strength

单选题The load chart of a crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题How should you signal the crane operator to raise the boom and lower the load?().AExtend arm with the palm down and and hold this position rigidlyBPlace both fists in front of the body with the thumbs pointing outward each otherCClasp hands in front of you bodyDExtend arm with the thumb pointing up, and flex the finger s in and out for as long as the load movement is desired

单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题()is not a static load.AActual weight of the ship's structure,outfitting,equipment and machineryBBallast load(weight)CCargo loadDSlamming and sloshing load

单选题If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will(),as he is not bound to look out for the ship.Abe responsibleBnot be responsibleCpay the Shipowner for the expenses incurredDnot claim the Shipowner for the expenses incurred

单选题In a general cargo crane, () is fitted to lift the cargo load.Athe slewing motorBthe luffing motorCthe hoisting motorDnone of the above

单选题What does “evel-luffing” accomplish during crane operations().AIt prevents the load from swinging when the boom level is adjustedBLess power is needed when topping the boom with a load on the hookCIt maintains the height of the load above the deckDAll of the above

单选题A disk with a horizontal line through its center,equivalent to the summer load line,is called the().Adeadrise markBmaximum allowable draft markCplimsoll markDtonnage mark