Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.A.18 monthsB.2 yearsC.3 yearsD.5 years

Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.

A.18 months

B.2 years

C.3 years

D.5 years


相关考题:

Compliance with the terms of the load line certificate on a ship is the responsibility of the ______.A.Ballast Control OperatorB.Barge SupervisorC.Master or Offshore Installation ManagerD.operators representative

A load line for a ship is assigned by the ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved by the Coast Guard

When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?A.Once a dayB.At the change of every watchC.Only when in fresh or brackish waterD.Prior to getting underway

The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

Which statement about the dangerous cargo manifest,carried on a ship,is TRUE ________.A.The manifest must be made up by the Master or other designated ship's officerB.Shipments of hazardous and non-hazardous cargo may be listed on the manifest if they are destined for the same consigneeC.The manifest must be kept in a designated holder on or near the bridgeD.The type of label(s)required for each cargo must be indicated

A load line of a ship is assigned by ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved

A tug would NOT assist a ship to steer if the tug is made up to the large vessel ______.A.by a tow line ahead of the vesselB.forward on either bow of the vesselC.approximately amidships of the vesselD.on the vessel’s quarter

在集合地点集合。()A、Meet in front of the muster station.B、Get hold of the ladder.C、Drop me a heaving line to lift my bag.D、A ship is made fast to the equipment by mooring lines.

单选题Deck beams on a ship are generally spaced at equal intervals and run().AlongitudinallyBverticallyCtransverselyDintermittently

单选题The downflooding angle for a ship is the minimum angle at which().Athe load line becomes submergedBa non-watertight opening is at still water levelCoffset becomes excessiveDreserve buoyancy is a maximum

单选题Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().A18 monthsB2 yearsC3 yearsD5 years

单选题Berthing means bringing a vessel to her berth until().Athe ship is made fastBthe ship‟s first line is sent ashoreCthe ship is dredging anchorDthe ship‟s pilot disembarks

单选题When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().ASBTCWDF

单选题A tug would NOT assist a ship to steer if the tug is made up to the large vessel().Aby a tow line ahead of the vesselBforward on either bow of the vesselCapproximately amidships of the vesselDon the vessel's quarter

单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().AINTERNATIONAL LOAD LINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION

单选题When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().ASBTCWDF

单选题A load line is assigned to a ship to insure adequate stability and().Amooring tensionBriser tensionClifesaving equipmentDstructural strength

单选题Compliance with the terms of the load line certificate on a ship is the responsibility of the().ABallast Control OperatorBBarge SupervisorCMaster or Offshore Installation ManagerDoperators representative

单选题A load line of a ship is assigned by the().Aminerals management serviceBDepartment of energyCcorps of engineersDa recognized classification socitey approved

单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().Awhen the line pull reaches the rated winch capacityBafter the line pull exceeds the rated winch capacityCafter a short build-up of torqueDimmediately

单选题When must the Master of a vessel log the position of load line marks in relation to the surface of the water in the Official Logbook?()AOnce a dayBAt the change of every watchCOnly when in fresh or brackish waterDPrior to getting underway

单选题The duration of an Internationl Load Line Exemption Certificate issued by an Administration to a ship exempted under paragraph(2) of article 6 shall not exceed。()A2yearB3yearsC4yearsD5years

单选题Which is the winter load waterline on the load waterline mark?().AThe line over the summer load waterlineBThe line above the tropical load waterlineCThe line below the tropical load waterlineDThe line between the summer and the winter north Atlantic load waterline

单选题A branch line valve of a fire extinguishing system on a ship must be marked with the().Amaximum pressure allowed at that branchBname of the space or spaces which it servesCdate of the last maintenance inspectionDpressure needed to maintain an effective stream at that point

单选题The document that certifies the correctness of the load line marks on a ship is called the ().ACertificate of InspectionBLoad line certificateCCertificate of DocumentationDSOLAS Certificate

单选题Where advance freight is agreed upon,payment does not depend on delivery and must be made ()the ship is lost and the cargo never delivered.AUnlessBWhenCBecauseDEven though

单选题When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?()AOnce a dayBAt the change of every watchCOnly when in fresh or brackish waterDPrior to getting underway