单选题()on cargo lights.ACloseBSwitchCOpenDAll above.

单选题
()on cargo lights.
A

Close

B

Switch

C

Open

D

All above.


参考解析

解析: 暂无解析

相关考题:

Budgetary estimates are the output of the _____ phase(s) of the project.A . conceptualB . developmentC . implementationD . finishE . All of the above.

Satisfaction of the functional requirements of a product is called _____ .A . usabilityB . reliabilityC . maintainabilityD . producibilityE . All of the above.

When all members must unanimously agree before a decision is reachedA all members become committedB decisions are reached slowlyC integrity is developedD future decision making ability is enhancedE All of the above.

In all cultures, women are generally seen _________to nature than men.A. as closeB. closerC. as closelyD. closely

All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo

Connection对象关闭一个已经打开的链接的方法是()。 A.CloseB.ExecuteC.OpenD,BeginTrans

Valves on steam-smothering lines to cargo tanks shall be set with ______.A.The master control valve shut and valves to individual cargo tanks shutB.The master control valve open and valves to individual cargo tanks shutC.The master control valve shut and valves to individual cargo tanks openD.All valves open

It’s going to rain. Don’t forget ()the hatches.A、to closeB、to openC、to close and openD、closing

The bosun is greasing the (). It is well greased.A、ropeB、cargo wireC、ladderD、All above.

()on cargo lights.A、CloseB、SwitchC、OpenD、All above.

Timber can be stowed ().A、only on deckB、only in holdsC、both on deck and in holdsD、All above.

The bulk carrier, general cargo ship, reefer ship and lumber carrier are all ().A、liquid cargo shipsB、multi-purpose shipsC、dry cargo shipsD、container ships

Minor ()to container.A、damageB、damagingC、damagedD、All above.

The temperature in No.2 hold is below ().A、normalB、normC、normallyD、All above.

The partial loss of or damage to the cargo is not recoverable from the insurer resulting from natural calamities under()in PICC Ocean Marine Cargo Clauses.A、All RisksB、FPAC、WAD、All Risks+War Risks

单选题All cargo wires need to be ().AgreasedBoiledCwashedDrepaired

单选题All the cargo holds must be()cleaned out()meet the requirement of the cargo surveyor.Asuch/thatBso/thatCsuch/toDso/as to

单选题It is the job of the ()Department to take care of the cargo.ADeckBEngineCServiceDabove all

单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().APut all the remaining cargo on starboard sideBPut light cargo on starboardside and heavy cargo on port sideCPut light cargo on port side and heavy cargo on starboard sideDA,B,C are all correct

单选题An inert gas system is designed to reduce the possibility of tank explosions by().Aeliminating sparks and fire in the vicinity of cargo tanksBremoving all hydrocarbon gases from the cargo tanksCblanketing cargo tanks with inert foamDreducing the oxygen concentration below levels necessary for combustion

单选题()cargo means to check all cargo loaded into or discharged from a vessel.ATallyingBExaminingCWeighingDHandling

单选题All the cargo wires must be ()well.AwashedBgreasedCcleanedDscraped

单选题The bulk carrier, general cargo ship, reefer ship and lumber carrier are all ().Aliquid cargo shipsBmulti-purpose shipsCdry cargo shipsDcontainer ships

单选题When no WINS server is present, all name registrations and lookups are done by UDP ().A broadcastB multicastC unicastD None of the above.

单选题All of our export dangerous cargo is()examined before shipment.AthoughBthroughCthoroughDthoroughly

单选题All the cargo wires must be greased ().AwellBgoodCniceDperfect

单选题Please arrange()a cleaning gang to sweep out all the ship’s cargo holds to enable her to receive cargo at this port.AtoBwithCbyDfor