The bosun is greasing the (). It is well greased.A、ropeB、cargo wireC、ladderD、All above.

The bosun is greasing the (). It is well greased.

  • A、rope
  • B、cargo wire
  • C、ladder
  • D、All above.

相关考题:

Budgetary estimates are the output of the _____ phase(s) of the project.A . conceptualB . developmentC . implementationD . finishE . All of the above.

Satisfaction of the functional requirements of a product is called _____ .A . usabilityB . reliabilityC . maintainabilityD . producibilityE . All of the above.

Which of the following is not a cost of non-conformance?A . maintenance and calibrationB . warranty repairsC . scrapD . reworkE . All of the above.

When all members must unanimously agree before a decision is reachedA all members become committedB decisions are reached slowlyC integrity is developedD future decision making ability is enhancedE All of the above.

The Utility Theory _____ .A considers risk propensity of the decision maker.B attempts to formalize management's risk considerations.C works well with decision tree analysis.D is considered highly theoretical.E All of the above.

● A Work Breakdown Structure:A assures all work is identifiedB subdivides the project into manageable segmentsC provides the project sponsor with a time-phase task summaryD both A and BE All of the above.

All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo

All the cargo wires must be adjusted well.()A、所有的货物钢丝绳必须调整好。B、所有的货物钢丝绳必须修理好。C、所有的货物钢丝绳必须上油。D、所有的货物钢丝绳必须清洁好。

The ()(吊货索套) at hatch No.1 is quite worn out.A、cargo lightB、lashing wireC、cargo slingD、wire rope

大副告诉装卸工人不要用钩子装袋装货。()A、The chief officer told the stevedores not to use hooks to load the deck cargo.B、The bosun told the stevedores not to use hooks to load the bagged cargo.C、The chief officer told the stevedores not to use hooks to load the bagged cargo.D、The bosun told the stevedores not to use hooks to load the deck cargo.

()on cargo lights.A、CloseB、SwitchC、OpenD、All above.

()is the strongest and the most elastic of all the synthetic fiber ropes.A、Hemp ropeB、Wire ropeC、Nylon ropeD、wood rope

绑扎钢丝绳()A、cargo wireB、lashing wireC、wire ropeD、wire

Timber can be stowed ().A、only on deckB、only in holdsC、both on deck and in holdsD、All above.

The bulk carrier, general cargo ship, reefer ship and lumber carrier are all ().A、liquid cargo shipsB、multi-purpose shipsC、dry cargo shipsD、container ships

Rig ()on both side of the bow.A、the gangwayB、the paint boardsC、the pilot ladderD、all of the above

Minor ()to container.A、damageB、damagingC、damagedD、All above.

The temperature in No.2 hold is below ().A、normalB、normC、normallyD、All above.

All the cargo wires must be ()well.A、washedB、greasedC、cleanedD、scraped

The partial loss of or damage to the cargo is not recoverable from the insurer resulting from natural calamities under()in PICC Ocean Marine Cargo Clauses.A、All RisksB、FPAC、WAD、All Risks+War Risks

单选题The bosun is greasing the (). It is well greased.AropeBcargo wireCladderDAll above.

单选题All the cargo holds must be()cleaned out()meet the requirement of the cargo surveyor.Asuch/thatBso/thatCsuch/toDso/as to

单选题()on cargo lights.ACloseBSwitchCOpenDAll above.

单选题(),the cargo plan is not well done.AFrank speakedBFrankly to speakCFrankly spokenDFrankly speaking

单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().APut all the remaining cargo on starboard sideBPut light cargo on starboardside and heavy cargo on port sideCPut light cargo on port side and heavy cargo on starboard sideDA,B,C are all correct

单选题()cargo means to check all cargo loaded into or discharged from a vessel.ATallyingBExaminingCWeighingDHandling

单选题大副告诉装卸工人不要用钩子装袋装货。()AThe chief officer told the stevedores not to use hooks to load the deck cargo.BThe bosun told the stevedores not to use hooks to load the bagged cargo.CThe chief officer told the stevedores not to use hooks to load the bagged cargo.DThe bosun told the stevedores not to use hooks to load the deck cargo.