单选题All the cargo wires must be ()well.AwashedBgreasedCcleanedDscraped
单选题
All the cargo wires must be ()well.
A
washed
B
greased
C
cleaned
D
scraped
参考解析
解析:
暂无解析
相关考题:
All the cargo holds must be ______ cleaned out ______ meet the requirement of the cargo surveyor.A.such/thatB.so/thatC.such/toD.so/as to
All the holds which are to take cereals in bags must be so cleaned that they meet the requirements of the ______.A.local agentB.cargo surveyorC.accident investigatorD.general average adjuster
Which statement(s) is/are TRUE concerning crane cargo operations?A.Do not exceed rated load capacity of crane and container spreader or slingsB.During any cargo handling operation,the safety of personnel is paramountC.Cargo handlers must be outfitted with adequate protection from personal injuryD.All the above
Which item must be entered in the official log?______A.All engine ordersB.Drafts upon leaving portC.Names of night mates and engineersD.Number of cargo gangs on board
The master of a ship must ______ all reasonable care of the cargo,both during the ordinary course of the voyage and where some accident has exposed the cargo to danger.A.MakeB.TakeC.GiveD.Have
All deck cargo must be ______ in addition to being shored,blocked,and braced.A.lashedB.carefully prestowedC.nestedD.properly supervised
Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all ______.A.Fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stationsB.Interior fire stationsC.Engine room fire stationsD.All of the above
By regulation,cargo tank atmosphere must be inert before and during which operation ________.A.StrippingB.LoadingC.CleaningD.All of the above
Your tow includes a barge carrying chlorine.Which special requirements must be observed ________.A.The wing voids shall not be opened when underwayB.You must post a deckhand to keep a special watch on this bargeC.A cargo information card for chlorine must be in the pilothouseD.All of the above
To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.A.Slings or saddles placed at 25-foot(8 meter)intervalsB.Enough slack in their bightC.Topping lifts and runners tied off to winchesD.All of the above
Which statement is TRUE concerning cargo hose on tank barges ________.A.Cargo hose must be able to withstand the shut-off head plus the static head of the cargo pumpB.Cargo hose must be able to withstand the static head of the cargo pump but no less than 100 psiC.Cargo hose must be able to withstand the shut-off head less the static head of the cargo pump but no less than 100 psiD.Cargo hose must be able to withstand at least 150 psi
Your tanker is carrying a cargo of styrene.Which of the following is NOT a requirement for carriage of this cargo ________.A.P/V valves with galvanized parts must be replacedB.Authorization to carry styrene must be endorsed on the Certificate of InspectionC.You must have a Certificate of Inhibition provided by the shipperD.The cargo tank heating coils must be blanked off
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the ______.A.date of the testB.load at which a test sample brokeC.name of the vesselD.number of strands and of wires in each strand
All the cargo wires must be adjusted well.()A、所有的货物钢丝绳必须调整好。B、所有的货物钢丝绳必须修理好。C、所有的货物钢丝绳必须上油。D、所有的货物钢丝绳必须清洁好。
这些绑扎工具必须要再次上紧。()A、These lashing tools must be tightened again.B、These lashing wires must be tightened again.C、These lashing bars must be secured again.D、These cargo wires must be loosened again.
湿货要远离干货。()A、Wet cargo must be kept away from dry cargo.B、Heavy cargo must be kept away from dry cargo.C、Light cargo must be kept away from dry cargo.D、Wet cargo must be kept away from light cargo.
()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire
单选题Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all().Afire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stationsBinterior fire stationsCengine room fire stationsDall of the above
单选题All the cargo wires must be adjusted well.()A所有的货物钢丝绳必须调整好。B所有的货物钢丝绳必须修理好。C所有的货物钢丝绳必须上油。D所有的货物钢丝绳必须清洁好。
单选题The cargo gear includes().Aderrick, winches, cargo ropes and wiresBderricks, windlass, capstanChatch covers, derricks, windlassDcranes, hatches, lashing wires
单选题All the cargo holds must be()cleaned out()meet the requirement of the cargo surveyor.Asuch/thatBso/thatCsuch/toDso/as to
单选题()has more than ten percent broken wires. Stop using it at once.AThe cargo runnerBThe cargo blockCThe derrick slingDThe lashing wire
单选题All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().Adate of the testBload at which a test sample brokeCname of the vesselDnumber of strands and of wires in each strand
单选题这些绑扎工具必须要再次上紧。()AThese lashing tools must be tightened again.BThese lashing wires must be tightened again.CThese lashing bars must be secured again.DThese cargo wires must be loosened again.