单选题All cargo wires need to be ().AgreasedBoiledCwashedDrepaired
单选题
All cargo wires need to be ().
A
greased
B
oiled
C
washed
D
repaired
参考解析
解析:
暂无解析
相关考题:
Many buildings in the city need repairing, but the one ______first is the library.A.repaired B.being repairedC.repairing D.to be repaired
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the ______.A.date of the testB.load at which a test sample brokeC.name of the vesselD.number of strands and of wires in each strand
All the cargo wires must be adjusted well.()A、所有的货物钢丝绳必须调整好。B、所有的货物钢丝绳必须修理好。C、所有的货物钢丝绳必须上油。D、所有的货物钢丝绳必须清洁好。
我们需要大量的绑扎钢丝。()A、We need plenty of clamps.B、We need plenty of lashing wires.C、We need plenty of cargo wires.D、We need plenty of lashing bars.
这些绑扎工具必须要再次上紧。()A、These lashing tools must be tightened again.B、These lashing wires must be tightened again.C、These lashing bars must be secured again.D、These cargo wires must be loosened again.
The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires
()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire
单选题我们需要大量的绑扎钢丝。()AWe need plenty of clamps.BWe need plenty of lashing wires.CWe need plenty of cargo wires.DWe need plenty of lashing bars.
单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().APut all the remaining cargo on starboard sideBPut light cargo on starboardside and heavy cargo on port sideCPut light cargo on port side and heavy cargo on starboard sideDA,B,C are all correct
单选题All the cargo wires must be adjusted well.()A所有的货物钢丝绳必须调整好。B所有的货物钢丝绳必须修理好。C所有的货物钢丝绳必须上油。D所有的货物钢丝绳必须清洁好。
单选题The cargo gear includes().Aderrick, winches, cargo ropes and wiresBderricks, windlass, capstanChatch covers, derricks, windlassDcranes, hatches, lashing wires
单选题()cargo means to check all cargo loaded into or discharged from a vessel.ATallyingBExaminingCWeighingDHandling
单选题The damaged cargo is not allowed to export without().Arepairing or replacingBto repair or to replaceCbeing repaired or replacedDto be repaired or replaced
单选题()has more than ten percent broken wires. Stop using it at once.AThe cargo runnerBThe cargo blockCThe derrick slingDThe lashing wire
单选题All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().Adate of the testBload at which a test sample brokeCname of the vesselDnumber of strands and of wires in each strand
单选题opes or wires attached to derricks to prevent them from swinging during cargo handling operations are().APreventersBSide ropesCStaysDGuide lines
单选题这些绑扎工具必须要再次上紧。()AThese lashing tools must be tightened again.BThese lashing wires must be tightened again.CThese lashing bars must be secured again.DThese cargo wires must be loosened again.
单选题This cargo wires has more than ten percent () wires.AdamagedBbrokenCmissingDrepaired