单选题You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take? ()ACut in another IG fan to increase gas flowBOpen the pressure control valve until the pressure increasesCOpen the tank isolation valve to the fully open positionDReduce the pumping rate
单选题
You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take? ()
A
Cut in another IG fan to increase gas flow
B
Open the pressure control valve until the pressure increases
C
Open the tank isolation valve to the fully open position
D
Reduce the pumping rate
参考解析
解析:
暂无解析
相关考题:
How does an inert gas system on a tanker function to prevent explosions in cargo tanks?A.De-energizes the "charged mist" effectB.Maintains a positive pressure on the vent header to cool the flammable vaporsC.Inert gas filters out the flammable vapors from the cargo tank spacesD.Inert gas dilutes the flammable vapor and air concentrations to keep them below the lower explosive limit
Which method is used to supply inert gas from a flue gas system to the cargo tanks?A.Exhaust gas pressure from the stackB.High capacity fanC.Inert gas compressorD.Natural aspiration
You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take?A.Cut in another IG fan to increase gas flowB.Open the pressure control valve until the pressure increasesC.Open the tank isolation valve to the fully open positionD.Reduce the pumping rate
______ shall be provided in every cargo tank and slop tank in accordance with the appropriate Resolutions.A.A load on top systemB.Direct line systemC.Circle line systemD.An inert gas system
Inerting means ______.A.The introduction of inert gas into a tank with the object of reducing the oxygen content to below 8% by volumeB.The introduction of inert gas into a gas free tank for the purpose of reducing the oxygen content to below 8% by volumeC.The introduction of inert gas into a cargo tank during cargo discharge to replace the volume of discharged cargoD.All of the above
The blowers of an inert gas generation system aboard a tanker,will be automatically secured if ______.A.Normal water supply at the water seal is lostB.The temperature of the inert gas being delivered to the cargo tanks is more than 150℉C.The cooling water supply to the scrubbers is lostD.All of the above
The deck water seal of the inert gas system ______.A.Cools the inert gas and prevents soot from entering the cargo tanksB.Acts as an emergency shutdown when inlet pressures exceed the safe working pressureC.Prevents the backflow of hydrocarbon gasses into nonhazardous areasD.Relieves sudden large overpressures in the system
Upon arrival at the discharging port,the inert gas system is ______.A.Turned onB.Turning onC.Turn onD.To turn on
Which statement about inert gas pressures in a cargo tank is TRUE ________.A.The pressures of the inert gas in the tank may create excessive pressure at the pump while dischargingB.Gas pressures should be maintained at the highest permissible level throughout the discharging processC.High gas pressures may cause pyrophoric oxidation in the tankD.High gas pressures may cause loss of suction when stripping
The venting system shall be provided with devices to prevent the passage of ______ into the cargo tanks.A.flameB.inert gasC.airD.oil gas
An inert gas system is designed to reduce the possibility of tank explosions by ______.A.eliminating sparks and fire in the vicinity of cargo tanksB.removing all hydrocarbon gases from the cargo tanksC.blanketing cargo tanks with inert foamD.reducing the oxygen concentration below levels necessary for combustion
单选题How does an inert gas system on a tanker function to prevent explosions in cargo tanks? ()ADe-energizes the charged mist effectBMaintains a positive pressure on the vent header to cool the flammable vaporsCInert gas filters out the flammable vapors from the cargo tank spacesDInert gas dilutes the flammable vapor and air concentrations to keep them below the lower explosive limit
单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A150 millimeters of water pressureB125 millimeters of water pressureC100 millimeters of water pressureD75 millimeters of water pressure
单选题The deck water seal of the inert gas system().Acools the inert gas and prevents soot from entering the cargo tanksBacts as an emergency system shutdown when the inlet pressures exceed the safe working pressure in the hazardous zoneCprevents the backflow of hydrocarbon gasses into nonhazardous areasDrelieves sudden large overpressures in the system
单选题Upon arrival at the discharging port, the inert gas system is().Aturned onBturning onCturn onDto turn on
单选题An inert gas system is designed to reduce the possibility of tank explosions by().Aeliminating sparks and fire in the vicinity of cargo tanksBremoving all hydrocarbon gases from the cargo tanksCblanketing cargo tanks with inert foamDreducing the oxygen concentration below levels necessary for combustion
单选题You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take? ()ACut in another IG fan to increase gas flowBOpen the pressure control valve until the pressure increasesCOpen the tank isolation valve to the fully open positionDReduce the pumping rate
单选题An inert gas system installed on a tanker is designed to().Aaid in the stripping and cleaning of cargo tanksBincrease the rate of discharge of cargoCforce toxic and explosive fumes from a cargo tank to vent to the outside atmosphereDlower the oxygen levels inside cargo tanks,making explosion nearly impossible
单选题Inerting means().Athe introduction of inert gas into a tank with the object of reducing the oxygen content to below 8% by volumeBthe introduction of inert gas into a gas free tank for the purpose of reducing the oxygen content to below 8% by volumeCthe introduction of inert gas into a cargo tank during cargo discharge to replace the volume of discharged cargoDAll of the above
单选题Which method is used to supply inert gas from a flue gas system to the cargo tanks?()AExhaust gas pressure from the stackBHigh capacity fanCInert gas compressorDNatural aspiration
单选题The purpose of the deck seal in an inert gas system is to prevent().Aflammable vapors from entering machinery spaceBflue gas escaping to atmosphereCinert gas escaping to atmosphereDair entering inert gas system
单选题The combined fan discharge rate in an inert gas system is related to the().Ashoreside loading rateBmaximum cargo pump discharge rateCboiler forced draft fan rateDsize of the largest cargo tank
单选题An inert gas system on a tanker should be used to().Aprevent the generation of flammable or combustible gas in tanksBblow out cargo lines to prevent the build up of gas concentrationsCdilute tank atmospheres to keep gas concentrations below the lower explosive limitDprevent fires in the pumproom by continually displacing flammable vapors
单选题An inert gas system on a tanker should be used to().Aprevent the generation of flammable or combustible gas in tanksBblow out cargo lines to prevent gas concentrationsCdilute tank atmospheres to keep gas concentrations below the lower explosive limitDprevent fires in the pumproom by continually displacing flammable vapors
单选题Each inert gas system must be designed to supply the cargo tanks with a gas,or mixture of gasses,that has an oxygen content by volume of().A5% or lessB10% or lessC15% or lessD20% or less
单选题The blowers of an inert gas generation system aboard a tanker,will be automatically secured if().Anormal water supply at the water seal is lostBthe temperature of the inert gas being delivered to the cargo tanks is more than 150°FCthe cooling water supply to the scrubbers is lostDall of the above
单选题()shall be provided in every cargo tank and slop tank in accordance with the appropriate Resolutions.AA load on top systemBDirect line systemCCircle line systemDAn inert gas system
单选题The deck water seal of the inert gas system().Acools the inert gas and prevents soot from entering the cargo tanksBacts as an emergency shutdown when inlet pressures exceed the safe working pressureCprevents the backflow of hydrocarbon gasses into nonhazardous areasDrelieves sudden large overpressures in the system