多选题A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()AYou must set each end of the trunk line to IEEE 802.1e encapsulation.BYou must set the same VTP management domain name on both switches.CYou must set all ports on the two switches as access ports.DYou must configure one of the switches as a VTP server.EYou must use a rollover cable to connect the two switches.

多选题
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()
A

You must set each end of the trunk line to IEEE 802.1e encapsulation.

B

You must set the same VTP management domain name on both switches.

C

You must set all ports on the two switches as access ports.

D

You must configure one of the switches as a VTP server.

E

You must use a rollover cable to connect the two switches.


参考解析

解析: 暂无解析

相关考题:

Don't worry, your watch () and you can have it in no time. A、is repairedB、has been repairedC、is being repaired

,you need to give all you have and try your best. A Being a winner B To be a winner C Be a winner D Having been a winner

— Have you moved into the new house?— No yet, the rooms _____. A are being paintedB are paintingC are paintedD are being painting

A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).A.You must set each end of the trunk line to IEEE 802.1e encapsulation.B.You must set the same VTP management domain name on both switches.C.You must set all ports on the two switches as access ports.D.You must configure one of the switches as a VTP server.E.You must use a rollover cable to connect the two switches.

The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

After connecting a PC to an available port on a switch, you find that the PC can not access any of the resources on the LAN. No other PC's connected to the switch appear to be having any issues. What is the most likely cause for this problem?A.The router lacks a routing table entry for the new hostB.The host switch port is assigned to the incorrect VLANC.The host MAC address is incorrectly configuredD.A STP instance for the new host has not been initializedE.The switch does not have the MAC address hard coded in the CAM table.

One of our railway station attendants ___ glad to assist you with your luggage.A. have been B. is being C. would be D. are being

--Have you moved into the new house? --Not yet.The room__.A.is being paintedB.are paintingC.are paintedD.are being painted

Have you installed the new software?()AInstalled.BUninstalled.CNo, not yet.DYes, not yet.

Have you installed the new software?()A、Installed.B、Uninstalled.C、No, not yet.D、Yes, not yet.

Don't worry, your watch()and you can have it in no time.A、is repairedB、has been repairedC、was repairedD、is being repaired

You are troubleshooting an issue which is causing full-sized packets entering the MPLS cloud be dropped. You have discovered that one of the switches in the MPLS core is not a Cisco switch, but otherwise the MPLS MTU size is set to 1508 bytes on the routers. Based on this information, which of these may be the reason the packets are being dropped?()A、The switch on you MPLS core that was not produced by Cisco does not support oversized packetsB、No switches support oversized packetsC、By definition, the maximum MTU is 1500 bytesD、As MPLS VPN labeling increases the size of the packet by 8 bytes, the IP MTU should have been changed to 1508

In which of the following scenarios would the "show cdp neighbors detail"command be an appropriate troubleshooting tool?()A、Two switches are connected via a trunk. Both switches have been assigned an IP address, subnet mask, and default gateway. A ping is successful between the two switches. However, VLAN information is not passed from one switch to the other switch.B、A router and a switch have been assigned an IP address, a subnet mask, and a default gateway. They are directly connected, but a ping between the two devices fails.C、A router connects to another router through a serial interface. Both routers have been assigned an IP address, subnet mask, and default gateway. The routers are running RIP and the networks directly connected to the first router do not pass to the second router. However, a ping from one router to the serial interface of the directly connected neighboring router is successful.D、A router connects to another router via a switch. Both routers and the switch have been assigned an IP address, subnet mask, and default gateway. Neither the routers nor the switch are able to ping one of the hosts that is directly to the switch.

You have been assigned to manage a set of databases. The previous DBA did not leave you notes regarding the structure of each of the databases. While analyzing an instance, you notice that the system identifier (SID) for the instance is set to ’+ASM’. What is the purpose of this instance?()A、 This instance is being used to manage the operating system files.B、 This instance is being used to manage the files of other databases.C、 This instance is being used to manage the instances of other databases.D、 This instance is being used to manage the background processes of other instances.

You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()A、 SVI interfaceB、 Access portC、 EtherChannel port channelD、 Loopback interfaceE、 Routed portF、 BVI interface

You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()A、Verify that trunked links are configured to allow the VLAN traffic.B、Verify that the switch is configured to allow for trunking on the switch ports.C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.D、Verify that different native VLANs exist between two switches for security purposes.

A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()A、You must set each end of the trunk line to IEEE 802.1e encapsulation.B、You must set the same VTP management domain name on both switches.C、You must set all ports on the two switches as access ports.D、You must configure one of the switches as a VTP server.E、You must use a rollover cable to connect the two switches.

单选题You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()Ageneric router and switch configuration parametersBend-to-end test plan after all components have been installed and  configuredCadministrator assignmentsDrollback plan

单选题You are designing a group management strategy for users in the finance department. You need to  identify the appropriate changes that need to be made to the current group management strategy. You want to accomplish this goal by using the minimum number of groups.  What should you do?()A Add the finance users to the financeData group to which the necessary permissions have been assigned.B Add the finance users to the financeGG group to which the necessary permissions have been assigned.C Add the finance users to the financeGG group. Then add the financeGG group to the financeData group to which the necessary permissions have been assigned.D Add the finance users to the financeGG group. Add the financeGG group to the financeUG group to the financeDat group to which the necessary permissions have been assigned.

单选题You have been assigned to manage a set of databases. The previous DBA did not leave you notes regarding the structure of each of the databases. While analyzing an instance, you notice that the system identifier (SID) for the instance is set to ’+ASM’. What is the purpose of this instance?()A This instance is being used to manage the operating system files.B This instance is being used to manage the files of other databases.C This instance is being used to manage the instances of other databases.D This instance is being used to manage the background processes of other instances.

单选题Don't worry, your watch()and you can have it in no time.Ais repairedBhas been repairedCwas repairedDis being repaired

单选题You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()AVerify that different native VLANs exist between two switches for security purposes.BVerify that the switch is configured to allow for trunking on the switch ports.CVerify that each switch port has the proper IP address space assigned to it for the new VLAN. DVerify that the VLAN virtual interface has been correctly created and enabled.

多选题You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()ASVI interfaceBAccess portCEtherChannel port channelDLoopback interfaceERouted portFBVI interface

单选题You ()him so closely; you should have kept your distance.Ashouldn’tfollowBmustn’tfollowCcouldn’t have been followingDshouldn’t have been following

单选题A Catalyst switch has just been installed and configured, and is not working as expected. You have decided to capture multiple show command outputs to study. Which one command could you use that includes the output of many other show commands, such as show version and show running-config?()Ashow configurationBshow memoryCshow stacksDshow tech-support

单选题New ways have been found to prevent the river______.Anot to be pollutedBagainst pollutingCfrom pollutingDfrom being polluted

单选题The demonstrations ______.Awhich once supported Andry Rajoelina have been replaced by the ones against himBare spreading nationwideCare being cracked down by the militaryDshow most people in Madagascar don’t accept the new president