单选题The load chart of a crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().
A

maximum counter weight required

B

minimum horsepower required

C

hoist rope strength

D

allowable load


参考解析

解析: 暂无解析

相关考题:

How should you signal the crane operator to lower the boom and raise the load ________.A.Extend arm and point finger in the direction to move the boomB.Extend arm with thumb pointing downward and flex fingers in and outC.With forearm vertical and forefinger pointing up,move hand in small horizontal circlesD.With arm extended downwards and forefinger pointing down,move hand in small horizontal circles

How should you signal the crane operator to move slowly ________.A.Use one hand to give any motion signal,and place the other hand motionless in front of the hand giving the motion signaB.Extend arm with the thumb pointing up,and flex the fingers in and out for as long as the load movement is desiredC.First tap your elbow with one hand and then proceed to use regular signalsD.First tap the top of your head with your fist and then proceed to use regular signals

The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

What does “evel-luffing” accomplish during crane operations ________.A.It prevents the load from swinging when the boom level is adjustedB.Less power is needed when topping the boom with a load on the hookC.It maintains the height of the load above the deckD.All of the above

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

Which statement comparing a shipboard crane to conventional gear is TRUE ________.A.Cranes are more difficult to secure for seaB.The spotting area of the conventional gear is largerC.A crane operator requires more training than the winch operator of a yard and stay rigD.The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes

Which of the following statements is TRUE regarding crane operations ________.A.Radio communications allow the crane operator to disregard the use of hand signalsB.The crane operators and signalman must be familiar with the correct hand signalsC.The forward cranes can be operated from the bridgeD.The aft cranes can be operated from the aft steering station

During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet

During which condition should be operator of a pedestal crane shutdown operations?A.BunkeringB.High windsC.Potable water spill on deckD.More than 3°list

It is the responsibility of the crane operator to, at all times, be aware of the location of the __.A.loadB.hookC.boomD.All of the above

The ()(浮吊) can float on water used to load and unload the cargo.A、floating craneB、jumbo boomC、union purchaseD、crane

单选题Which statement comparing a shipboard crane to conventional gear is TRUE().ACranes are more difficult to secure for seaBThe spotting area of the conventional gear is largerCA crane operator requires more training than the winch operator of a yard and stay rigDThe yard and stay rig is more flexible in its ability to handle a wider variety of cargoes

单选题During which condition should the operator of a pedestal crane shutdown operations?()ALightning in the vicinityBAn approaching squall lineCA fire on the pierDAll of the above

单选题A diesel engine is supercharged in order to()Alower the no-load RPMsBprovide more air for combine with the fuelCincrease the no-load RPMsDprovide more fuel combine with the air

单选题Which of the following statements is TRUE regarding crane operations().ARadio communications allow the crane operator to disregard the use of hand signalsBThe crane operators and signalman must be familiar with the correct hand signalsCThe forward cranes can be operated from the bridgeDThe aft cranes can be operated from the aft steering station

单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().Awinch speedBboom strengthCload radiusDcable strength

单选题In cargo crane, () for lifting the load.Aa hoisting motorBa luffing motorCa mooring motorDa slewing motor

单选题The crane is usually mounted on a pedestal to offer adequate () to the operator.AtimeBspaceClengthDvisibility

单选题During which condition should the operator of a pedestal crane shutdown operations?()ABunkeringBHigh windsCPotable water spill on deck

单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()ALet go of both control levers and return to neutral positionBPress the emergency stopCNotify the mate on watchDAll of the above

单选题How should you signal the crane operator to move slowly().AUse one hand to give any motion signal,and place the other hand motionless in front of the hand giving the motion signaBExtend arm with the thumb pointing up,and flex the fingers in and out for as long as the load movement is desiredCFirst tap your elbow with one hand and then proceed to use regular signalsDFirst tap the top of your head with your fist and then proceed to use regular signals

单选题How should you signal the crane operator to lower the boom and raise the load().AExtend arm and point finger in the direction to move the boomBExtend arm with thumb pointing downward and flex fingers in and outCWith forearm vertical and forefinger pointing up,move hand in small horizontal circlesDWith arm extended downwards and forefinger pointing down,move hand in small horizontal circles

单选题Annual inspection of vessel cranes shall be conducted by().AHASBthe person in chargeCa qualified inspectorDthe crane operator

单选题How should you signal the crane operator to raise the boom and lower the load?().AExtend arm with the palm down and and hold this position rigidlyBPlace both fists in front of the body with the thumbs pointing outward each otherCClasp hands in front of you bodyDExtend arm with the thumb pointing up, and flex the finger s in and out for as long as the load movement is desired

单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题What does “evel-luffing” accomplish during crane operations().AIt prevents the load from swinging when the boom level is adjustedBLess power is needed when topping the boom with a load on the hookCIt maintains the height of the load above the deckDAll of the above

单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().Aboom angleBboom strengthCload radiusDcable strength