单选题_____AaccuracyBprecisionCexactnessDdetail
单选题
_____
A
accuracy
B
precision
C
exactness
D
detail
参考解析
解析:
固定搭配。in detail详细地;清楚地。accuracy精确性。precision精确;精度。exactness正确。
固定搭配。in detail详细地;清楚地。accuracy精确性。precision精确;精度。exactness正确。
相关考题:
Going from Level to Level in the work breakdown structure will result inA.Less estimating accuracyB.Better control of the projectC.Lower status reporting costsD.A greater likelihood that something will fall through the cracksE.None of the above
51 Going from Level 2 to Level 4 in the work breakdown structure will result inA. Less estimating accuracyB. Better control of the projectC. Lower status reporting costsD. A greater likelihood that something will fall through the cracksE. None of the above
● Going from Level 2 to Level 4 in the work breakdown structure will result inA Less estimating accuracyB Better control of the projectC Lower status reporting costsD A greater likelihood that something will fall through the cracksE None of the above
You should take care that you have not ________ any detail in the design.A:disappearedB:thrownC:deliveredD:neglected
Estimating schedule activity costs involves developing an (74) of the cost of the resources needed to complete each schedule activity.A.accuracyB.approximationC.specificationD.summary
Which of the following belongs to the communicative approach?A.Focus on accuracyB.Focus on fluencyC.Focus on strategiesD.Focus on comprehension
it is suggested that teachers should not interrupt students for error correction when theactivity aims at__________.A.accuracyB.fluencyC.complexityD.cohesion
霍尼韦尔TPS系统调用102号操作组显示画面的按键顺序为()。A、[GROUP]+102+[ENTER]B、[DETAIL]+102+[ENTER]C、[GROUP]+102+[ACK]D、[DETAIL]+102+[ACK]
单选题You want to implement a master-detail relation between data blocks based on object tables. How would you do this? ()ACreate the relation manually and coordinate the blocks using triggers. BBase the relation on a REF pointer using the Data Block Wizard. CBase the relation on a foreign key using the Data Block Wizard. DThis task is not possible because master-detail relations can be implemented only for blocks based on relation tables.
单选题This programme will examine the writer's books in detail, ____ an introduction to her life.AfollowingBhaving followedCbeing followedDto be followed
单选题A:Do you have any suggestions about it? B:()ANo, I have no ideaBLet me give you a handCAfter I read it in detail, will tell you my opinion
单选题At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().Aat the discretion of the inspector,but in no greater detail than required for original certificationBat the discretion of the inspector,but in no lesser detail than required for original certificationCgenerally similar in scope to the inspection required for certification,but in less detailDequivalent to the inspection required for certification
单选题()amplify charted detail and contain information needed for safe navigation.AAdmiralty Sailing DirectionsBAdmiralty List of LightsCAdmiralty List of SignalsDAdmiralty Notices to Mariners
单选题They went _____ the schedule for the conference again and again until they felt satisfied with every detail of it.AoutBupCoverDby
单选题For visitors whose time is limited and are unable to learn the history and examine the building in detail on the spot, it is suggested that the following plan of a journey be followed.AwhoseBand are unableConDbe followed
单选题()describes, in detail, the project’s deliverables and the work required to create those deliverables.AProduct scope descriptionBProject objectivesCStakeholder AnalysisDThe project scope statement
单选题() is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototypeAmilestoneBdeliverableCetcDBAC
单选题The()describes, in detail, the project's deliverables and the work required to create those deliverables.Aproject scope statementBproject requirementCproject charterDproduct specification
单选题CDR是什么的缩写?()ACall Detail RecordBCall Data RecordCCell Data RecordDCell Delete Record