单选题The ()is pumped onto the ship at the loading port by shore pumps.AoilBgasCwater and fuelDtimber
单选题
The ()is pumped onto the ship at the loading port by shore pumps.
A
oil
B
gas
C
water and fuel
D
timber
参考解析
解析:
暂无解析
相关考题:
Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION
My ship is ______ No.5 Berth for loading.A.onto the wharfB.moved asternC.into the dockD.moored alongside
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses ______.A.applyB.complyC.supplyD.reply
Oil slick caused by spillage of oil from tanker ship is ______.A.a drop of oilB.the emulsion of oil at sea surfaceC.the weathered oilD.the oil floating on the surface of the sea water
The international shore connection required on a ship is designed to ______.A.Permit discharge of waste oilB.Allow hook up of fire fighting water from a dock or another vesselC.Satisfy pollution prevention requirementsD.Allow emergency use of the fire main for deballasting
The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber
翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes
At the ()port, tankers pump the oil ashore using her own pumps.A、dischargingB、loadC、loadingD、charging
单选题A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().Aholding its slops onboard until they can be pumped into the city sewer systemBcirculating them through the lube oil purifier to remove water and debrisCholding its slops onboard until they can be discharged to a shore side reception facilityDpumping them into a settling tank for separation before pumping the oily water residue overboard
单选题The port State control officer may ensure that()are exhibited in conspicuous places throughout the ship.Asurvey planning documentBmuster listsCbulk carrier bookletDbulk carrier loading triangle
单选题When the ship security alert system is activated, it shall not()Ainitiate a ship-to-shore security alertBtransmit a ship-to-shore security alertCinitiate an alert identifying the ship, its locationDraise a security alarm on-board the ship indicating that the ship is under threat
单选题Sea water temporarily pumped into tanks to simulate the increased vertical loading of environmental forces is termed().ApreloadBliquid variable loadCfixed loadDbasic load
单选题A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship?().ABill of GoodsBBill of LadingCCargo ManifestDCargo Receipt
单选题If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().AapplyBcomplyCsupplyDreply
单选题The oil is usually pumped into ship at the loading port by().Aship’s own pumpsBshore pumpsClarge pipesDlarge tubes
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.Ain the loading placeBin the port or dockCin the loading spotDin the discharging spot
问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
单选题The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().Athe port of destinationBthe next port of callCthe port of arrivalDthe last port of call
单选题The loading of the ship must be done in accordance with().Athe ship’s instructionsBthe terminal’s instructionsCthe port captain’s instructionsDthe charterer’s instructions
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().AINTERNATIONAL LOAD LINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION
单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.AbeforeBwhenCafterDduring
单选题If there are a number of survivors in the water after abandoning ship,they should().Atie themselves to the unit so they won't drift with the currentBform a small circular group to create a warmer pocket of water in the center of the circleCsend the strongest swimmer to shore for assistanceDform a raft by lashing their life preservers together
单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().Athe port of destinationBthe next port of callCthe port of arrivalDthe last port of call
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ().AINTERNATIONAL LOADLINE CERTIFICATEBPASSENGER SHIP SAFETY CERTIFICATECCARGO SHIP SAFETY CONSTRUCTION CERTIFICATEDGENERAL DECLARATION