At the ()port, tankers pump the oil ashore using her own pumps.A、dischargingB、loadC、loadingD、charging

At the ()port, tankers pump the oil ashore using her own pumps.

  • A、discharging
  • B、load
  • C、loading
  • D、charging

相关考题:

When adding oil to a refrigeration system, precautions must be taken to ensure thatA.the compressor suction pressure is not too highB.all air is purged from the pump and charging fittingsC.the high pressure cutout switch is held open to prevent accidental startingD.the condenser is completely shutdown first

If it becomes necessary for a stand-on vessel to take action to avoid collision,she shall NOT,if possible,().A.Decrease speedB.Increase speedC.Turn to port for a vessel on her own port sideD.Turn to starboard for a vessel on her own port side

In the case of new crude oil tankers,the additional ballast permitted shall be carried in cargo tanks only if such tanks have been ______ before departure from an oil unloading port or terminal.A.inertedB.crude oil washedC.dilutedD.cleaned

In view of ______ bilge water from any vessel,an application shall be made to Harbor Authorities for approval.A.dischargingB.recirclingC.loadingD.taking in

Existing crude oil tankers may,______ being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the specified provision of the Regulation.A.As perB.In the consequence ofC.In accordance withD.In lieu of

For the purpose of ______ tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.A.DischargingB.RecirclingC.LoadingD.Taking in

Which statement is TRUE concerning deep well self-priming pumps ________.A.When loading oil cargo,it is always loaded via the discharge line through to the pump until the tank is topped offB.Stripping systems are generally eliminated for the purposes of cargo handlingC.In recent years deep well pumps have become increasingly unpopular in product tankers and medium size crude shipsD.There is no danger of damaging the pump from overheating

材料:Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using crude oil washing.The Administration shall undertake to ensure that the system fully complies with the requirements of MARPOL within one year after the tanker was first engaged in the trade of carrying crude oil or by the end of the third voyage carrying crude oil suitable for crude oil washing,whichever occurs later.Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall operate the system in accordance with the requirements of that Regulation.Every existing crude oil tanker of 40000 tons deadweight and above shall be provided with segregated ballast tanks.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks,operate with a cargo tank cleaning procedure using crude oil washing unless the crude oil tanker is intended to carry crude oil which is not suitable for crude oil washing.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the provision of Regulation 13A of this Annex for the following period:for crude oil tankers of 70 000 tons deadweight and above,until two years after the date of entry into force of the present Convention;and for crude oil tankers of 40000 tons deadweight and above but below 70 000 tons deadweight,until four years after the date of entry into force of the present Convention.问题:A new crude oil tanker of 30000 tons deadweight shall ________.A.be fitted with crude oil washing systemB.operate dedicated clean ballast tanksC.be fitted with segregated ballast tanksD.be fitted with washing system other than crude oil washing systemExcept________,the existing crude oil tankers may operate with any of the following installations.A.segregated ballast tanksB.cargo tank cleaning procedure using crude oil washingC.operate with dedicated clean ballast tanksD.protection positionThe latest date for an existing crude oil tanker of 60000 tons deadweight to install dedicated clean ballast tanks is ________.A.until two years after the date of entry into force of the present ConventionB.until four years after the date of entry into force of the present ConventionC.within one year after the tanker was first engaged in the trade of carrying crude oilD.by the end of the third voyage carrying crude oilIt is inferred that ________.A.all oil tankers,both the newly built and existing ones,shall be fitted with a cargo tank cleaning system using crude oil washingB.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with segregated ballast tanksC.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with dedicated clean ballast tanksD.a new crude oil tanker of 20 000 tons deadweight and above shall not be fitted with a cargo tank cleaning system using crude oil washing immediately after her entry in the trade of carrying crude oil请帮忙给出每个问题的正确答案和分析,谢谢!

In a crossing situation, the vessel which has the other on her own starboard side shall _____.A.if the circumstances of the case admit, avoid crossing ahead of the otherB.change course to port to keep out of the wayC.reduce her speedD.All of the above

The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber

Oil pumped ashore by ships’()(油泵).A、pineB、hoseC、oil pumpD、crane

At the discharging port, tankers pump the oil ashore using ().A、shore pumpsB、her own pumpsC、large pumpsD、large tubes

The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes

油压千斤顶()A、oil jackB、oil liftC、oil topD、oil pump

单选题Which vessel is the stand-on vessel when two vessels crossing in fog are NOT in sight of one another().AThe vessel which has the other on her own starboard sideBThe vessel which has the other on her own port sideCThe one which hears the other's fog signal firstDNeither vessel is the stand-on vessel

单选题Existing crude oil tankers may,()being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the specified provision of the Regulation.Aas perBin the consequence ofCin accordance withDin lieu of

单选题When adding oil to a refrigeration system, precautions must be taken to ensure that ().Athe compressor suction pressure is not too highBall air is purged from the pump and charging fittingsCthe high pressure cutout switch is held open to prevent accidental startingDthe condenser is completely shutdown first

单选题Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include().Aapproved oil-water separating equipmentBa fixed or portable containment system at the shore connectionCa spare pump in case the main pump is inoperativeDat least one outlet accessible from the weather deck

单选题Oil pumped ashore by ships’()(油泵).ApineBhoseCoil pumpDcrane

单选题The safe rate of bunkering heavy fuel oil is directly related to the ().Atype of fuel transfer pump aboardBtemperature of the fuel oil being receivedCsize of the fuel storage tanks ashoreDdistance from the fuel oil storage tanks ashore

单选题Lube oil in the fresh water cooling system of a diesel engine may result from a ()Acamshaft seizureBlube oil pump failureClube oil cooler failureDlube oil pump overflow

单选题At the discharging port, tankers pump the oil ashore using ().Ashore pumpsBher own pumpsClarge pumpsDlarge tubes

单选题At the ()port, tankers pump the oil ashore using her own pumps.AdischargingBloadCloadingDcharging

单选题In a bypass type lubrication system for a diesel engine, the dirty oil line to the centrifuge should be taken from the ().Alube oil pump suction lineBlube oil pump discharge lineCbottom of the lube oil sumpDoutlet from the lube oil header

单选题Which of the following statements is correct with regards to the operation of a centrifugal cargo pump?()AOil is discharged from the impeller through the outletBGravity causes the oil to flow toward the dischargeCThe self-priming feature of the centrifugal pump enables it to draw its own suction as it startsDThe discharge capacity varies directly with the speed of the impeller

单选题In the case of new crude oil tankers,the additional ballast permitted shall be carried in cargo tanks only if such tanks have been()before departure from an oil unloading port or terminal.AinertedBcrude oil washedCdilutedDcleaned

单选题If it becomes necessary for a stand-on vessel to take action to avoid collision,she shall NOT,if possible,()Adecrease speedBincrease speedCturn to port for a vessel on her own port sideDturn to starboard for a vessel on her own port side