单选题The deck loads on a ship are distributed through the deck beams to the().AframesBhullCstringersDplates
单选题
The deck loads on a ship are distributed through the deck beams to the().
A
frames
B
hull
C
stringers
D
plates
参考解析
解析:
暂无解析
相关考题:
甲板部由大副负责。A.The captain is the head of a ship.B.The master is the head of a ship.C.The deck department is under the command of the chief officer.D.The pilot is the head of a ship.
Deck beams perform ______ of the following functions in the hull structure of a vessel.① They transfer deck loads to the frames;② They help to maintain the shape of the hull.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②
A deck beam does NOT ______.A.act as a beam to support vertical deck loadsB.lessen the longitudinal stiffness of the vesselC.act as a tie to keep the sides of the ship in placeD.act as a web to prevent plate wrinkling due to twisting action on the vessel
Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing
Freeing ports on a vessel with solid bulwarks ______.A.prevent stress concentration in the bulwarkB.permit easy jettison of deck cargo in an emergencyC.provide openings through the bulwarks for mooring linesD.allow water shipped on deck to flow off rapidly
甲板部由大副负责。()A、The captain is the head of a ship.B、The master is the head of a ship.C、The deck department is under the command of the chief officer.D、The pilot is the head of a ship.
主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.
艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.
Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck
The station lists are posted ()on board a ship.A、in the engine roomB、on the gangwayC、in public placesD、on the deck
甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.
单选题A deck beam does NOT().Aact as a beam to support vertical deck loadsBlessen the longitudinal stiffness of the vesselCact as a tie to keep the sides of the ship in placeDact as a web to prevent plate wrinkling due to twisting action on the vessel
单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().AgirdersBstanchionsCframesDbeams
单选题船上的船员属于三个部门:甲板部、轮机部和事务部。()ASeamen on board the ship are in two departments: Deck Department, Engine Department.BSeaman on board the ship are in two department: Deck Department, Engine Department and Service Department.CThe Deck Department and the Engine Department are the two departments.DSeamen on board the ship are in three departments: the Deck Department, the Engine Department and the Service Department.
单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.
单选题Stanchions prevent the entire deck load on a ship from being carried by the().AbulkheadsBstringersCframes and beam bracketsDdeck longitudinals
单选题Freeing ports on a vessel with soild bulwards().Aprevent stress concentration in the bulwarkBpermit easy jettison of deck cargo in an emergencyCprovide opening through the bulwarks for mooring linesDallow water shipped on deck to flow off rapidly
单选题The deck loads on a ship are distributed through the deck beams to the().AframesBhullCstringersDplates
单选题For occasional heavy loads, two cranes can be arranged to work together. The operating () for deck crane motors may be hydraulic electric.AprincipleBmediumCinstructionDvoltage
单选题The heavier outboard strake of deck plating on a ship is called the deck().AstiffenerBbeamCstringerDdoubler
单选题A chock().Ais a deck fitting used to shackle gear to the deckBpermits easy jettisoning of deck cargo in an emergencyCprevents stress concentration in the bulwarkDprovides openings through the bulwark for mooring lines
单选题Cribbing is().Awooden blocks or dunnage placed between a deck load and the deckBthe chains and shackles used to secure a deck cargoCa crate in which a deck cargo is packagedDcardboard separation pieces placed between deck loads to prevent chafing
单选题The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge
单选题主甲板以下是二层甲板。()AThe deck below the lower deck is known as ‘tween deck.BThe deck below the main deck is known as ‘tween deck.CThe deck above the main deck is known as ‘tween deck.DThe deck below the lower deck is known as main deck.