单选题首楼甲板涂上两度红丹漆和干舷漆。()AApply two coats of red lead primer and topside paint to the forecastle deck.BApply two coats of red lead primer and boottopping paint to the forecastle deck.CApply two coats of topside paint and red lead primer to the poop deck.DApply two coats of red lead primer and topside paint to the poop deck.

单选题
首楼甲板涂上两度红丹漆和干舷漆。()
A

Apply two coats of red lead primer and topside paint to the forecastle deck.

B

Apply two coats of red lead primer and boottopping paint to the forecastle deck.

C

Apply two coats of topside paint and red lead primer to the poop deck.

D

Apply two coats of red lead primer and topside paint to the poop deck.


参考解析

解析: 暂无解析

相关考题:

单选题---Finished with engine! ---Reply: Finished with engine! ---Report: ().AFinished with engineBEngine finishedC\DWell

单选题开关舱的工作通常是由船员来做。()AThe work of opening and closing hatches is usually done by crew members.BThe work of opening and closing hatch covers is usually done by crew members.CThe work of opening hatch covers is usually done by crew members.DThe work of closing hatch covers is usually done by crew members.

单选题The ()(笨重货) must be handled by jumbo boom or shore crane.Aawkward cargoBdrummed cargoCcased cargoDheavy cargo

单选题Pass the spring round the()(滚筒).AbittsBbollardCdrumDbell

单选题When the anchor()(到底),hoist the anchor ball by day.Ato the bottomBreaches the bottomCget the bottomDbottom

单选题If we have a pilot on board , we should take down () and hoist () .()Aflag H ; flag GBflag G; flag HCflag H ; flag QDflag G; flag Q

单选题Ready for ()the boat.AlowerBloweringCloweredDtopped

单选题Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.AblocksBgoosenecksCtackleDguys