()are for radiators and pipes and for the ship’s funnel.A、VarnishesB、Anti-corrosive paintsC、Heat-resistant paintsD、Primer

()are for radiators and pipes and for the ship’s funnel.

  • A、Varnishes
  • B、Anti-corrosive paints
  • C、Heat-resistant paints
  • D、Primer

相关考题:

For what purpose are the diving pipes used?A. To absorb heat from the sun.B. To store heat for future use.C. To turn solar energy into heat energy.D. To carry heat down below the surface.

From the last paragraph we can learn that __A. some pipes have to be re-arranged in winterB. the system can do more than warming up the buildingC. the exchangers will pick up heat from the street surfaceD. less heat may be collected in winter than in summer

RUSH的Pipes中,不需要探查的是() A.主动脉B.股静脉C.腘静脉D.肌间静脉

During the PSC inspection, under the provision of SOLAS74, which one may not be regarded as clear grounds for ships' detainment?A.excess amount of oily-water mixtures in bilgesB.insulation of piping including exhaust pipes in engine room contaminated by oilC.improper operation of bilge pumping arrangementsD.paint peeling off the uptake

()(耐热漆) are for radiators and pipes and for the ship’s funnel.A、VarnishB、Anti-corrosive paintsC、Heat-resistant paintsD、Anti-fouling paint

管道防腐(corrosion preventive of pipes)

You are preparing for a new installation of SQL Server 2005. You need to select the protocols that client computers might use to connect to the server. Which two protocols can you use to achieve this goal?()A、 Named Pipes B、 TCP/IP C、 Shared Memory D、 Virtual Interface Adapter (VIA) E、 Multiprotocol

单选题()(耐热漆) are for radiators and pipes and for the ship’s funnel.AVarnishBAnti-corrosive paintsCHeat-resistant paintsDAnti-fouling paint

名词解释题管道防腐(corrosion preventive of pipes)

单选题The lubricating pipes and dusts should be blown out with ().AatmosphereBthe fresh waterCcompressed airDchemical compounds

单选题()are for radiators and pipes and for the ship’s funnel.AVarnishesBAnti-corrosive paintsCHeat-resistant paintsDPrimer

单选题All items such as steam pipes, exhaust pipes and fittings which, because of their location and operating temperature, present a hazard should be adequately lagged.That means the items should()Anot be put into operation too earlyBbe pay adequate attention toCbe used only when necessaryDbe coated with certain material

单选题Telescopic pipes to the piston of a large slow-speed main propulsion diesel engine are designed to prevent ().Aexcessive crankcase pressureBexcessive lube oil temperatureCcontamination of the lube oil by waterDcontamination of the cooling water by lube oil

单选题One characteristic of a pulse type turbo-charging system is()Ahigh average exhaust manifoldBgreatly fluctuating inlet manifold pressureCconstant exhaust manifold pressureDmultiple exhaust pipes to the turbocharger

单选题Pipes made of plastic are now widely used in building as they are light and do not become ()in water.AripeBinstantCrottenDmature

单选题() provide the water to the pistons.APneumatic pipesBHydraulic pipesCTelescopic pipesDOperating gas pipes

单选题Large pipes or () are fitted between the steam and water drums to ensure good natural circulation of water.Afire-tubesBfurnacesCdown-comersDsoot-blowers

单选题Exhaust pipes for separate diesel engines can be combined only when ()Aspace limitations prevent separately run pipesBthe engines are small auxiliary unitsCthey are arranged to prevent gas backflow to each engineDa waste heat boiler is installed

单选题Emulsion oils and sodium nitrite are both approved additives, but the latter cannot be used if any pipes are () or if any soldered joints exit.AchromedBweldedCgalvanizedDbolted

单选题Emulsion oils and sodium nitrite are both approved additives, but () cannot be used if any pipes are galvanized or if soldered joints exist.Athe latterBlatterCformerDthe former

单选题Main steam and exhaust pipes for winches and similar gear shall not pass through crew accommodation nor, whenever technically possible, through alleyways leading to crew accommodation; where they do pass through such alleyways, they shall be adequately ().Aventilated and taggedBventilated and cooled downCinsulated and encasedDinsulated and warmed up

单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Afailure of the proper operation of the main steering gearBfailure of the proper operation of electrical installationsCleakage of domestic water pumpDinsulation of exhaust pipes in engine room contaminated by oil

单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Aexcess amount of oily-water mixtures in bilgesBinsulation of piping including exhaust pipes in engine room contaminated by oilCimproper operation of bilge pumping arrangementsDthere were an actual emergency

单选题What should you set the Client Configuration to when configuring the ODBC Data Source for the Database Subsystem?()ATCP/IP  BMultiprotocol  CNamed Pipes  DNWLink IPX/SPX

单选题Large pipes or down-comers are fitted between the steam drum and () to ensure good natural circulation of water.Afire-tubesBfurnacesCwater drumsDwater wall tubes

单选题It is usual to identify the fluids in pipes by bands of paint at intervals, and the engineer should familiarize himself with the code in use.According to the above sentence, which of the following statements is true?()APeople can know the types of fluids in pipes by feeling with handsBThere are series of rings painted in the pipes to show various fluidsCEngineers should wear cards standing for ranksDEngineer knows his own code very well

单选题()is not a step for anchoring preparation.ATo take off the covers from the hawse pipes and clear the spurling pipesBTo make sure that the windlass is out of gear and the brakes are onCTo turn the windlass over slowlyDTo inform the engine room to ensure that deck power and water are off