单选题()is not a step for anchoring preparation.ATo take off the covers from the hawse pipes and clear the spurling pipesBTo make sure that the windlass is out of gear and the brakes are onCTo turn the windlass over slowlyDTo inform the engine room to ensure that deck power and water are off
单选题
()is not a step for anchoring preparation.
A
To take off the covers from the hawse pipes and clear the spurling pipes
B
To make sure that the windlass is out of gear and the brakes are on
C
To turn the windlass over slowly
D
To inform the engine room to ensure that deck power and water are off
参考解析
解析:
暂无解析
相关考题:
Still, the youngster cast the trotline far into the water, anchoring it to a stick that he () deep in the sand. A、pitchB、plungeC、infuriateD、dwindle
Many?common accounting mistakes()with proper planning and preparation. A、can avoidB、can be avoidedC、will avoid
The Buck(降压式变换器) is a ( ) converter. A.voltage step-upB.current step-downC.current step-upD.resistance
Generally speaking,the most favorable bottom for anchoring is ______.A.very soft mudB.rockyC.a mixture of mud and clayD.loose sand
以下哪项是PGW的典型功能?() A.接入层安全性B.MOBILITY ANCHORING FOR INTER-3GPP MOBILITYC.MOBILITY ANCHORING FOR NON-3GPP ACCESS SYSTEMD.触发和分发寻呼到ENODEB
Masters are required to notify Port Authorities of anchorage bearings after ______.A.departureB.leavingC.anchoredD.anchoring
In determining the scope of cable to be used when anchoring, what would NOT be considered__________.A.Depth of the waterB.Character of the holding groundC.maintenance cost for the chainD.Type of anchor cable
以下哪项是PGW的典型功能?()A、接入层安全性B、MOBILITY ANCHORING FOR INTER-3GPP MOBILITYC、MOBILITY ANCHORING FOR NON-3GPP ACCESS SYSTEMD、触发和分发寻呼到ENODEB
With everything arranged properly, the project is surely to () smoothly as planned, step by step.A、improveB、increaseC、progressD、occur
列关于接入试探数NUM_STEP描述正确的是()。A、此参数设置每个接入试探序列中允许的接入试探个数,允许的接入试探个数为16。B、本参数设置越大,一个接入探测序列成功接入的概率加大,但有可能相应的增加了反向链路的干扰,因为接入不成功也有可能是因为碰撞造成的。C、通常在PWR_STEP和NUM_STEP两个参数之间存在一个平衡考虑,当PWR_STEP设置得较小,则NUM_STEP应该相应的设置较大一些,反之,PWR_STEP设置较大,则NUM_STEP可以设得小一些。D、通常在PWR_STEP和NUM_STEP两个参数之间存在一个平衡考虑,当PWR_STEP设置得较小,则NUM_STEP也应该相应的设置较小一些,反之,PWR_STEP设置较大,则NUM_STEP可以设得大一些。
单选题If the circumstances of the case admit,any vessel()in a narrow channel.Ashall have the liberty to anchorBshall avoid anchoringCshall moor to a buoy when necessaryDshall keep anchoring
单选题In anchoring orders, “Weigh anchor” means “()”.APay away the chainBTake in the chainCCheck up the chainDDrop the anchor
单选题A “Mediterranean moor” should be used when().Awhen anchoring in the MediterraneanBwhen docking stern to a berthCwhen docking bow to a berthDwhen anchoring in a strong current
单选题以下哪项是PGW的典型功能?()A接入层安全性BMOBILITY ANCHORING FOR INTER-3GPP MOBILITYCMOBILITY ANCHORING FOR NON-3GPP ACCESS SYSTEMD触发和分发寻呼到ENODEB
单选题Vessels are warned()in the area enclosed by pecked lines owing to the existence of numerous telegraph cables.AanchorBto anchorCnot to anchorDnot to anchoring
单选题Vessels should not anchor or trawl in the vicinity of pipelines and are()in the pipeline area shown on the chart.AProhibit to anchorBProhibited to anchorCProhibited from anchorDProhibited from anchoring
单选题In anchoring orders, walk back the chain means().Apay away the chainBtake in the chainCcheck up the chainDtake a strain on the chain
单选题Vessels should not anchor or trawl in the vicinity of pipelines and are().in the pipeline area shown on the chart.Aprohibit to anchorBprohibited to anchorCnot to anchorDprohibited from anchoring