IBM(000-106) 题目列表
单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()APower 710BPower 720CPower 730DPower 740
单选题What describes the difference between NPIV and vSCSI in the way fibre-channel attached disk and tape are presented when VIO Server is used?()ANPIV presents Virtual HBA addresses and vendor specific information for disk and tape devices.vSCSI presents generic disk and tape device interfaces.BNPIV presents generic disk and tape device interfaces on virtual HBA addresses.vSCSI presents HBA addresses as SCSI with vendor specific information for disk and tape devices.CNPIV presents HBA addresses and vendor specific device information directly to the client partition.vSCSI presents vendor specific disk information and generic tape device interfaces through VIO server.DNPIV presents virtual HBA addresses with generic device information for SCSI based disk and tape devices.vSCSI presents vendor specific information for disk and tape device devices attached via SCSI hardware interfaces.
单选题When a customer attempts to manage virtual machines, virtual images and system pools with the VMControl Express Edition, all operations fail except for managing virtual machines. What is recommended to resolve this situation?()AUpgrade to VMControl Standard EditionBUpgrade to VMControl Enterprise EditionCUpgrade to latest version of VMControl Express EditionDDownload the latest fixes for VMControl Express Edition
单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()AIdentify, assess, and mitigate technical risks.BVerify pricing and gather components for special bid submission.CVerify the proposed solution will fit within the customer's budget.DReview competitive offerings, system performance and delivery schedules.
单选题Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()AAIXBIBM iCLinuxDVIO Server
单选题A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()APower 710BPower 720CPower 730DPower 740
单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()Ae-ConfigBSystem Planning Tool (SPT)CIBM Workload Estimator (WLE)DIBM Performance Monitor (PM)
单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()APowerHA SystemMirror Basic EditionBPowerHA SystemMirror Express EditionCPowerHA SystemMirror Standard EditionDPowerHA SystemMirror Enterprise Edition
单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()ABuild the logical partition infrastructure based on 6 or more VLANs.BBuild the logical partition infrastructure based on two or more IVEs.CBuild the logical partition infrastructure based on Partition Mobility.DBuild the logical partition infrastructure based on redundant VIO Servers.
单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()APopulate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.BPopulate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.CPopulate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.DPopulate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
单选题Which of the following uses compression/decompression to increase the memory available for client workloads?()APowerVMBVMControlCActive Memory SharingDActive Memory Expansion
单选题Which of the following functions can be performed using the Integrated Virtualization Manager?()AConcurrent firmware updatesBManagement of virtual storageCHot add/remove of I/O drawersDManagement of Capacity on Demand
单选题Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()ARedundant system clocksBRedundant service processorsCeDRAM chips have redundant L3 cacheDMain memory DIMMs contain a redundant DRAM chip
单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()AEnable automatic problem reporting from smitBUse IVM to enable console mirroring to IBM Remote Support.CUse the HMC to enable reporting through Electronic Service Agent.DEnable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
单选题A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()A4B8C16D32