单选题
() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
A

Process

B

Milestone

C

Work

D

Deliverables


参考解析

解析: 该题的关键词为"from one phase. reviewed. the next phase",其语句结构为" ()fromone phase(主语)are usually reviewed(谓语)for completeness and accuracy and approved before work starts on the next phase",含义为"在开始下阶段之前,需要评审前阶段什么的完整性和准确性",结合选项分析,容易排除A和B,选项C过于笼统,因而选择选项D。

相关考题:

Make or buy decisions are usually made during the _____ phase of a project.A.ConceptualB.Development.C.ImplementationD.ExecutionE.Close-out

62 Make or buy decisions are usually made during the _____ phase of a project.A. ConceptualB. Development.C. ImplementationD. ExecutionE. Close-out

● Make or buy decisions are usually made during the _____ phase of a project.A ConceptualB Development.C ImplementationD ExecutionE Close-out

● Software maintenance is to do necessary modification,supplenemt,and completeness during software life circle.Among the following vary kinds of maintenance,which one has the maximum workload in a general way? (73) .(73) A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance

● (66) from one phase are usually reviewed for completeness and accuracyand approved before work starts on the next phase.A.ProcessB.MilestoneC.Work D.Deliverables

Development is a structured design methodology that proceeds in a sequence from one phase to the next.A.WaterfallB.PhasedC.PrototypingD.Parallel

● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs

He usually () from headache.A. endureB. suffersC. receive

He usually __________from headache. A.enduresB.suffersC.receives

Viruses usually have two phases to their execution, the infection phase and the(75)phase. The later phase is optional, since stone viruses simply reproduce.A.reproduceB.proliferationC.defendD.attack

Software maintenance is to do necessary modification, supplenemt, and completeness during software life circle. Among the following vary kinds of maintenance, which one has the maximum workload in a general way?(73).A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance

We learn from Paragraph 1 that ( ).A. the government is usually the first to name a placeB. many places tend to have more than one nameC. a ceremony will be held when a place is namedD. people prefer the place names given by the government

● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.(75)A. WaterfallB. PhasedC. PrototypingD. Parallel

The life cycle ofa project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,itis_( )A.devclopmentB.conceptC.system analysisD.implementation

The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).A.developmentB.conceptC.system analysisD.implementation

The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is( ). A.development B.concept C.system analysis D.implementation

The House Speaker and the temporary President of the Senate are usually()Aelected by the majority partyBchosen from the majority and minority partiesCmembers of the majority partyDchosen freely from the Congressmen and Senators

What does the command show | compare rollback 1 display?()A、the difference between the current candidate configuration and the candidate configuration from one commit agoB、the difference etween the current active configuration and the active configuration from the one commit agoC、the difference between the current active configuration and the active configuration from one commit agoD、the difference between the current candidate configuration and the archived configuration from one commit ago

以下()有关事件监听器的语句是正确的。A、Multiple listeners can be attached to one componentB、Only one listener can be attached to one componentC、One listener can receive and process the events from multiple componentsD、One listener can receive and process the events from only one component

Which benefit can be obtained by using the CHANGE management service component in the operate phase? Select exactly 1 answer(s) from the following:()。A、reduced operating costs, due to a consistent framework for making necessary changes in an efficient and accountable mannerB、greater accuracy, completeness, and timeliness of network configuration informationC、notification provided to interested parties regarding problems that have been identified, and a system that scales with customer requirementsD、improved system service quality and fewer disruptions

单选题With a purely resistance load the voltage and current are in phase, giving a power factor of ().AoneBless than oneCmore than oneDnegative one

单选题In the production of freshwater from seawater through a process of heating and cooling, the cooling phase of production is usually called ().AevaporationBdistillationCdehydrationDcondensation

单选题One of the methods NOT usually allowed in cleaning up oil spills in the United States is ().AskimmersBstrawCdispersantsDsawdust

单选题With a purely () load the voltage and current are in phase, giving a power factor of one.AinductiveBresistanceCcombinedDcapacitate

单选题What is one key objective of the operations readiness assessment performed in the plan phase?Select exactly 1 answer(s) from the following:()。Aalign business requirements with technical requirementsBcreate a plan to recycle used equipmentCevaluate the readiness of a customers current operations and network management infrastructure to support a new technologyDinstall and test system components in a non-production environment

单选题For IKE phase 1 negotiations, when is aggressive mode typically used?()Awhen one of the tunnel peers has a dynamic IP addressBwhen one of the tunnel peers wants to force main mode to be usedCwhen fragmentation of the IKE packet is required between the two peersDwhen one of the tunnel peers wants to specify a different phase 1 proposal

问答题At what age do people usually retire from work?