IBM(000-152) 题目列表
单选题A server has been having a memory problem. What feature can be used to determine the failing memory module?()AReboot the serverBRSA IICLightPath DiagnosticsDServerGuide
单选题A client is configuring an x3650 M3. Once the system is in production, they need to able to remotely view and make changes to the UEFI interface. Which of the following is the correct way to configure this?()AConfigure the RSA with an IP addressBConfigure the BMC with an IP addressCConfigure the AMM with an IP addressDConfigure the IMM with an IP address
单选题A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()AAdd External Storage via EXP3000BReplace current storage with more dense drivesCAdd External Storage via SANDAdd storage expansion blade
单选题An installed manufacturing customer has a mission-critical application that requires a rack mount server that will protect them against downtime in the event memory DIMM failure occurs. They also need load balancing, fault tolerant NICS and redundant power supplies and fans. Which of the following servers meets these requirements.()Ax3200 M3Bx3250 M3Cx3200 M3 and x3250 M3Dx3650 M3
单选题A customer plans to implement a network of x3690 X5 servers. The customer has very limited funds. Which of the following tools would allow installation of firmware updates?()AToolsCenterBVMware vSphere 4CTivoli Provisioning Manager (TPM)DTivoli Storage Manager (TSM)
单选题An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()ATurn over current design to Techline to create configurationsBPerform knowledge transfer of design requirements to Business partner then disengageCWork with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)DWork with business partner to engage Techline to create configurations
单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()AContact the IBM FTSS to replace the driveBContact the IBM CSR or SSR to replace the driveCOrder a replacement driveDContact IBM Service
单选题A customer purchases a virtual media key on a x3650 M3. They ask where to install the key. Which of the following provides the correct answer?()AProblem Determination and Service GuideBxRefCServerGuide Hardware ReferenceDCOG
单选题A customer wants a Blade to run a very memory intensive application. They require 48 GB with later expansion to 160 GB using 4 GB DIMMs. Which of the following products supports this requirement?()AHS22BHS22VCLS42DHX5
单选题Which IBM System Director task will give you the ability to update firmware and device drivers on System x servers?()A Remote Supervisor Adapter (RSA II)B Integrated Management Module (IMM)C Update ManagerD Tivoli Provisioning Manager for OSDeployment (TPMfOSD)
单选题A toy manufacturing customer wants to run Microsoft SQL Server. Which category is applicable for such a solution?()AE-mailBDatabaseCNetwork InfrastructureDSystems Management
单选题A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()ARedundant power supplies on the serversBRedundant PDUs in the rackCedundant power supplies in the servers and redundant PDUs in the rackDRedundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager
单选题After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()A A TDA are recommended only for high end hardware and very large or complex business opportunitiesB A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirementsC A TDA will guarantee that the hardware will work in customer’s environment at the volumes projectedD A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software
单选题Which of the following is used in an IBM Blade Center to provide cooling?()AFans for each bladeBChilled WaterCBlowersDFreon