单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager
单选题
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
A
The customer used their IBM Customer Number
B
The customer has activated their base warranty
C
The customer purchased Remote Technical Support Servicepac
D
The customer escalated the issue to the Duty Manager
参考解析
解析:
暂无解析
相关考题:
An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution. What IBM System x server would satisfy this criteria?()A、x3250B、x3200C、x3650D、x3400
What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.A、IBM Standalone Solutions Configuration Tool (SSCT)B、IBM Server ProvenC、IBM System x Reference Sheets (xREF)D、IBM Sizing Guides
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A、Design the solution and present it confidently so the customer does not question it.B、Design the solution and ensure the customer understands the unknowns with the new technology.C、Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D、Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
A customer is building a database server, and the server does sequential write most of the time. They are planning to use an IBM x445 and a ServeRAID-6M adapter. Which of the following fault tolerant RAID levels will perform best for sequential write?()A、RAID-5 with cache write backB、RAID-1E with cache write backC、RAID-10 with cache write thruD、RAID-50 with cache write thru
A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()A、Contact the IBM FTSS to replace the driveB、Contact the IBM CSR or SSR to replace the driveC、Order a replacement driveD、Contact IBM Service
A pharmaceutical company has a requirement for 8.5 TB of usable storage for a new data center. The customer has multiple host applications running on Solaris, Windows 2003, HP-U/X, Linux, and IBM System i platforms. Which IBM System Storage DS8000 volume configuration providesthe best performance and highest availability for this customer()A、RAID 3B、RAID 5C、RAID 6D、RAID 10
A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()A、Suggest to the customer to send their administrator to IBM System x training class to learn more about IBM Intel based servers.B、Propose a try and buy option and offer to help the customer in sizing the new Linux server. Engage the system Engineer on this opportunity.C、Introduce the IBM pSeries Unix product specialist to the account because IBM operating system (AIX) offers an open Unix solution.D、Direct the customer to the IBM Web site to help with sizing and System x server models and types. Follow-up with the customer to answer any sizing question.
A customer is looking for a new file and print server and is considering a 2-socket Intel server with redundant power and hard disk that must fit in the current server rack. With 2U available in the rack, the customer is looking for the best price performance ratio. Which IBM server will fit the best for this customer?()A、x3200B、x3455C、x3550D、x3650
A customer has 12 x445s and 20 x365s in their datacenter that are dedicated to production workloads. The customer wants to standardize on IBM Director as their Intel environment systems management platform. Which server platform is supported as a Director server?()A、zSeriesB、pSeriesC、iSeriesD、iSeries with IXA Adapter
A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager. They recently purchased an IBM x346 server for a remote office database project. They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components. Which of the following solutions would accomplish this?()A、Install an RSA II Slimline card on the IBM server and configure to send email alertsB、Enable the IBM management option in Insight ManagerC、Install and configure a Director agent on the IBM serverD、Configure the systems management processor on the IBM server
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()A、purchasing customerB、IBM Installation Readiness TeamC、IBM Customer EngineerD、IBM Business Partner
The customer has agreed that the SAN proposal is the best solution for their budget. Howeverthey are still unsure of using such leading edge technology. Which item below would help themfeel more comfortable?()A、TCO study B、A demonstration at a BPIC C、IBM customer references D、IBM Redbooks
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A、Configure a 2 node x3950 X5 B、Customer needs a System p server to support Oracle applications C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D、Configure a system that meets the minimum requirements
The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()A、IBM DS8700 B、IBM N6040 C、IBM Storwize V7000 D、IBM XIV Storage System
A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack. Which IBM server will best fit this customers requirement? ()A、x3105B、x3200C、x3400D、x3455
A customer is installing a new xSeries server into a Token-Ring environment. Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()A、IBM ServerProven hardware websiteB、IEEE Proven websiteC、IBM PartnerWorld websiteD、3Com Support website
单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()ADesign the solution and present it confidently so the customer does not question it.BDesign the solution and ensure the customer understands the unknowns with the new technology.CExplain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.DExplain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
单选题A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()ASuggest to the customer to send their administrator to IBM System x training class to learn more about IBM Intel based servers.BPropose a try and buy option and offer to help the customer in sizing the new Linux server. Engage the system Engineer on this opportunity.CIntroduce the IBM pSeries Unix product specialist to the account because IBM operating system (AIX) offers an open Unix solution.DDirect the customer to the IBM Web site to help with sizing and System x server models and types. Follow-up with the customer to answer any sizing question.
单选题A customer’s support technician finished installing their new x366 server running Windows 2003 Enterprise Server and the IBM Director agent. The customer applied the latest BIOS and firmware drivers available on the Web for the system. The problem is that the x366 runs for a few minutes and then reboots itself. Which of the following should be checked first?()AConfigure the box with RAID-1 and not RAID-5.BDisable Hyperthreading feature on the machine.CEnsure the Watchdog timers on the RSA-II are disabled.DReplace the Windows NTLDR file on the root partition from another copy of the Windows OS files.
单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()AContact the IBM FTSS to replace the driveBContact the IBM CSR or SSR to replace the driveCOrder a replacement driveDContact IBM Service
单选题A customer has Symantec NetBackup installed and is concerned about restore times for a line ofbusiness server. Which IBM Tivoli Storage Manager feature addresses this customer’s concerns?()AmigrationBcollocationCcompressionDsubfile backup
单选题A customer is searching for a new, small business server. The customer is standardized on AMD and does not want to place the new server in a rack. Which IBM server will best fit this customers requirement? ()Ax3105Bx3200Cx3400Dx3455
单选题An SMB customer requires a tower server with 2TB of internal storage. The customer has requested a low cost solution. What IBM System x server would satisfy this criteria?()Ax3250Bx3200Cx3650Dx3400
单选题A customer has a large HP Intel infrastructure and is actively managing these servers with Insight Manager. They recently purchased an IBM x346 server for a remote office database project. They do not want to run additional systems management software but require to be notified of PFA and hardware alerting on critical hardware components. Which of the following solutions would accomplish this?()AInstall an RSA II Slimline card on the IBM server and configure to send email alertsBEnable the IBM management option in Insight ManagerCInstall and configure a Director agent on the IBM serverDConfigure the systems management processor on the IBM server
单选题A customer has 12 x445s and 20 x365s in their datacenter that are dedicated to production workloads. The customer wants to standardize on IBM Director as their Intel environment systems management platform. Which server platform is supported as a Director server?()AzSeriesBpSeriesCiSeriesDiSeries with IXA Adapter
单选题What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.AIBM Standalone Solutions Configuration Tool (SSCT)BIBM Server ProvenCIBM System x Reference Sheets (xREF)DIBM Sizing Guides