单选题A customer reports the optical drive is no longer responding. Which of the following questionsshould be asked FIRST?()A“Did you log in with an administrator account?”B“Have you been to any inappropriate websites?”C“What have you changed since the optical drive worked properly?”D“What has changed since the optical drive worked properly?”

单选题
A customer reports the optical drive is no longer responding. Which of the following questionsshould be asked FIRST?()
A

“Did you log in with an administrator account?”

B

“Have you been to any inappropriate websites?”

C

“What have you changed since the optical drive worked properly?”

D

“What has changed since the optical drive worked properly?”


参考解析

解析: 暂无解析

相关考题:

●The project manager must maintain an effective communication link with the customer's satisfaction with the progress of the project. The project manager maintains this link through (71).(71)A.periodic project reports, periodic visits to the customer, and telephonic exchangesB.subordinates, project team members, and the project sponsorC.one-time reports, weekly reports, and monthly reportsD.the telephone, facsimile, and data transmission

After installing a new optical drive into a workstation, which of the following will ask for anacknowledgement?() A. IRQ ManagerB. BIOSC. Device ManagerD. Hardware Compatibility List

When servicing a laptop, which of the following components usually requires the keyboard to beremoved before the component can be replaced?() A. ProcessorB. Hard driveC. BatteryD. Optical drive

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A. 8 drive sets of 300 GB drivesB. 4 drive sets of 300 GB drivesC. 14 drive sets of 146 GB drivesD. 18 drive sets of 146 GB drives

The project manager must maintain an effective communication link with the customer’s satisfaction with the progress of the project. The project manager maintains this link through()A.Periodic project reports, periodic visits to the customer, and telephonic exchangesB.Subordinates, project team members, and the project sponsorC.One-time reports, weekly reports, and monthly reportsD.The telephone, facsimile, and data transmission

When servicing a laptop, which of the following components usually requires the keyboard to beremoved before the component can be replaced?()A、ProcessorB、Hard driveC、BatteryD、Optical drive

A technician has lost a necessary jumper for a new hard drive that must be installed immediately.Which of the following is the BEST solution?()A、Use a jumper from the motherboard where the new drive is going to be installed.B、Use a jumper from a hard drive that is no longer functioning.C、Contact the manufacturer of the new hard drive and have a replacement jumper shipped immediately.D、The new hard drive must be replaced

When configuring a POS system, which of the following peripheral devices would MOST likelyneed to be installed?()A、Optical mouseB、Handheld digitizerC、Barcode readerD、TouchscreenE、Document scannerF、KeyboardG、External USB drive

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A、8 drive sets of 300 GB drivesB、4 drive sets of 300 GB drivesC、14 drive sets of 146 GB drivesD、18 drive sets of 146 GB drives

A user installed a Blu-Ray drive in their PC. The user reports that the new drive and their existing DVD-RW drive are not operating. Which of the following needs to be replaced?()A、Power supplyB、DVD-RWC、Blu-Ray driveD、Motherboard

A user reports that after configuring the BIOS to boot to the hard drive first, the system still tries to boot from the optical drive. Which of the following is the MOST likely cause?()A、Optical driveB、Power supplyC、CMOS batteryD、CD-ROM disk

A customer reports the optical drive is no longer responding. Which of the following questionsshould be asked FIRST?()A、“Did you log in with an administrator account?”B、“Have you been to any inappropriate websites?”C、“What have you changed since the optical drive worked properly?”D、“What has changed since the optical drive worked properly?”

A user has recently added a second IDE CD-RW drive to a machine in addition to the primary DVD-ROM drive. The drive opens and closes; however, they do not see it show up in Windows. Which of the following is the MOST likely cause?()A、The drive jumper settings are incorrect.B、The drive is not receiving power from PSU.C、Windows only supports one optical drive.D、The user connected the drive with a SATA cable.

The technician is working on a system and has determined that the hard drive must be reimaged. However, the customer wants to retain all the data. Which of the following would take the LEAST amount of time to implement?()A、Create a new partition on the hard drive, copy all data to the new partition, reimage the drive, and the old data will be on the new partition and accessible.B、Install a new hard drive, slave the old drive, image the new drive, and show the customer how to access their data on the old drive.C、Upload the data to an external FTP server, reimage the drive, and then restore the data to the newly imaged drive.D、Copy data to a USB connected hard drive, reimage the drive, and then restore the data to the newly imaged drive.

An end user reports that their computer is making noise constantly. The technician notes that the hard drive activity light is on frequently. The technician finds plenty of free space on the drive.Which of the following BEST explains why the drive light is continuously active?()A、The system has a fragmented hard drive.B、The drive interface needs to be changed.C、The user has too many documents on the hard drive.D、The system page file has an issue.

A customer reports that their sound is not working. They state that the speakers worked previously. Which of the following should the technician check?()A、Speakers are in regulatory compliance.B、Speakers are on and the mute is off.C、Ensure the speakers are on the Windows HCL.D、Verify the system has enough hard drive space.E、The audio driver is installed correctly.F、Speakers are plugged into the correct jack.

A user reports that the computer’s hard drive is constantly running and the hard drive light is constantly flashing. Which of the following tools would be used to resolve this issue without losing data?()A、chkdskB、fdiskC、defragD、format

After installing a new optical drive into a workstation, which of the following will ask for anacknowledgement?()A、IRQ ManagerB、BIOSC、Device ManagerD、Hardware Compatibility List

A technician is preparing to update the BIOS on a laptop. Which of the following should thetechnician do to prevent problems during the update?()A、Remove all of the memoryB、Plug in the AC adapterC、Remove the hard drive and optical driveD、Clear the partitions on the hard drive

A Windows 2003 Server is no longer able to access its internal SCSI drive. The cables areconnected, the drive has power, and the drive shows up in Device Manager; however, the My Computerwindow does not show the drive that was previously working and formatted with NTFS.  Which of thefollowing would be the FIRST step in regaining access to the drive? ()A、 Reformat the NTFS partition.B、 Recreate the partition that was deleted.C、 Rewrite the MBR.D、 Run a check disk on the drive.

A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A、Configure the PCIe SSD adapter and drive modules as a JBODB、Configure a pair of mirrored PCIe SSD adapters and drive modulesC、Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD、Configure the PCIe SSD adapter and drive modules in a RAID-5 array

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D、The blade servers do not work with the Optical Pass-Thru Module.

单选题A user reports that after configuring the BIOS to boot to the hard drive first, the system still tries to boot from the optical drive. Which of the following is the MOST likely cause?()AOptical driveBPower supplyCCMOS batteryDCD-ROM disk

单选题A user installed a Blu-Ray drive in their PC. The user reports that the new drive and their existing DVD-RW drive are not operating. Which of the following needs to be replaced?()APower supplyBDVD-RWCBlu-Ray driveDMotherboard

单选题A customer reports the optical drive is no longer responding. Which of the following questionsshould be asked FIRST?()A“Did you log in with an administrator account?”B“Have you been to any inappropriate websites?”C“What have you changed since the optical drive worked properly?”D“What has changed since the optical drive worked properly?”

单选题A technician has lost a necessary jumper for a new hard drive that must be installed immediately.Which of the following is the BEST solution?()AUse a jumper from the motherboard where the new drive is going to be installed.BUse a jumper from a hard drive that is no longer functioning.CContact the manufacturer of the new hard drive and have a replacement jumper shipped immediately.DThe new hard drive must be replaced

单选题A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A8 drive sets of 300 GB drivesB4 drive sets of 300 GB drivesC14 drive sets of 146 GB drivesD18 drive sets of 146 GB drives

单选题A second optical drive has been added to the computer and needs to be referenced as the R: drive by the Microsoft Windows operating system. Which of the following places in Microsoft Windows will BEST accomplish this task?()AAdministrative ToolsBDisk ManagementCDevice ManagerDEvent Viewer