单选题Pinching of the cargo hose between the vessel and the dock should be prevented by().Aadjusting the hose supportsBlaying out an excess length of hose on deckCtying off the topping lifts and runners to winch headsDAll of the above

单选题
Pinching of the cargo hose between the vessel and the dock should be prevented by().
A

adjusting the hose supports

B

laying out an excess length of hose on deck

C

tying off the topping lifts and runners to winch heads

D

All of the above


参考解析

解析: 暂无解析

相关考题:

Cargo transfer operations on a tank vessel need NOT be stopped when ______.A.a tug comes alongside while the tanker is loading grade D and E cargoesB.a large,fresh oil spill is discovered immediately adjacent to the side of the tankerC.there is an electrical storm in the vicinityD.there is a fire on the dock or on a nearby vessel

A Master should file a marine note of protest if ______.A.cargo was received at ship side which was damaged in land transitB.longshore labor went on strike in the port causing undue vessel delayC.portions of his vessel's cargo were illegally impounded in a foreign portD.the vessel encountered heavy weather which might have caused cargo damage

When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?A.Call the owner,operator,or terminal supervisorB.Unplug the deck scuppersC.Order the dock man to shut downD.Run out the vessel's or terminal's fire hose

To determine which grades of cargo a tank vessel is permitted to carry you should ______.A.refer to the vessel's Certificate of InspectionB.examine the cargo tanks and fittingsC.ask the terminal supervisor or his representativeD.check the loading order

While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel's stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?A.Notify the engineroom of the need for propulsionB.Shut down any cargo transfer that's in progressC.Let go the port anchor and veer to a short scope of chainD.Obtain assistance from the terminal to put new stern lines out

The vessel shall be employed in such lawful trades between safe ports and places within Northern America as the ______ or their agents shall direct.A.CharterersB.Cargo ownersC.OwnersD.The merchants

You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.A.use separation cloths between the deck and cargoB.place the cargo on a layer of spaced dunnageC.hose down the deck before loading the cargoD.use bag-on-bag stowage

Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall

A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo

Which statement is TRUE concerning cargo hose on tank barges ________.A.Cargo hose must be able to withstand the shut-off head plus the static head of the cargo pumpB.Cargo hose must be able to withstand the static head of the cargo pump but no less than 100 psiC.Cargo hose must be able to withstand the shut-off head less the static head of the cargo pump but no less than 100 psiD.Cargo hose must be able to withstand at least 150 psi

A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main

单选题A note of protest is a declaration made by the Master of a vessel before a notary public.Its purpose is to().AProtest acts of violence or misconduct by the vessel's crewBState that damage to cargo or vessel was caused by improper loading or pilferage by others rather than ship's personnelCState that the damage to ship,cargo or both was due to the perils of the seaDState that the perishable cargo was damaged because of negligence by port authorities or other officials

单选题When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()ATrip the pump relief valveBOrder the dock man to shut downCCall the owner,operator,or terminal supervisorDRun out the vessel's or terminal's fire hose

单选题When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?()ACall the owner,operator,or terminal supervisorBUnplug the deck scuppersCOrder the dock man to shut downDRun out the vessel's or terminal's fire hose

单选题To determine which grades of cargo a tank vessel is permitted to carry you should().Arefer to the vessel's Certificate of InspectionBexamine the cargo tanks and fittingsCask the terminal supervisor or his representativeDcheck the loading order

单选题Cargo transfer operations on a tank vessel need NOT be stopped when().Aa tug comes alongside while the tanker is loading gradeBand E cargoes B. a large,fresh oil spill is discovered immediately adjacent to the side of the tankerCthere is an electrical storm in the vicinityDthere is a fire on the dock or on a nearby vessel

单选题Records of tests and inspections of a cargo vessel’s fire extinguishing systems shall be()on board until the vessel’s Certificate of Inspection expires.AconsealedBdetainedCcontainedDkept

单选题The danger of a charged hose left unattended on deck with the nozzle open is().Athe hose could burstBthe nozzle end will whip about causing damage or injuryCwater damage to vessel's cargo or structureDpersonnel might trip over the hose

单选题当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()AWhen a vessel is alongside the wharf, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.BWhen a vessel is alongside the wharf, t’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.CWhen a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.DWhen a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.

单选题The function of the bilge keel is to().Areduce the rolling of the vesselBserve as the vessel's main strength memberCadd strength to the bilgeDprotect the vessel's hull when alongside a dock

单选题Air compressors are NOT permitted in which space(s) on a tank barge carrying grade A cargo?()AA cargo handling roomBA space in which cargo hose is storedCAn enclosed space containing cargo pipingDAll of the above

单选题Bonding cables are used during cargo transfer to().Aprovide safe electrical power connection to barge equipmentBkeep the vessel from surging excessivelyCprevent an accidental discharge of static electricityDsecure the cargo hose to a hatch when loading overall

单选题A ballasted vessel sinks enroute to a dry dock. Under these circumstances,the vessel’s owner can claim().Aactual total lossBconstructive total lossCgeneral averageDparticular average

单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A5 times the maximum working pressure on the hose during cargo transferBone half the designed working pressureC4 times the pressure of the cargo pump used for transferringD5 times the minimum working pressure on the hose during cargo transfer

单选题Battens are fitted in cargo holds across the frames of the vessel from the turn of the bilge upward. The purpose of these cargo battens is().Afor securing a snatch block when snaking cargo into the wings of the holdBto prevent cargo from coming in contact with the vessel's frames or shell platingCtp prevent fittings to which cargo lashing may be securedDto support the dunnage floors which are laid down between tiere of cargo

单选题When a vessel is in dry-dock, the vessel’s engineers should ().Aexamine the condition of the propellerBchip and paint all hull protection zincsCinstall new docking plugs in all cofferdamsDinspect the hull for hogging or sagging

单选题While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel’s stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?()ANotify the engineroom of the need for propulsionBShut down any cargo transfer that's in progressCLet go the port anchor and veer to a short scope of chainDObtain assistance from the terminal to put new stern lines out