单选题A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()AVLANBzoningCtrunkingDLUN masking

单选题
A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()
A

VLAN

B

zoning

C

trunking

D

LUN masking


参考解析

解析: 暂无解析

相关考题:

A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A.VLANB.zoningC.trunkingD.LUN masking

A Fibre Channel fabric (or Fibre Channel switched fabric, FC-SW) is a switched fabric of FibreChannel devices enabled by a Fibre Channel switch. Fabrics are normally subdivided by Fibre Channel zoning. Each fabric has a name server and provides other services. Higher redundancy over FC-AL,P2P.Which path selection protocol is used by Fibre Channel fabrics?()A、 OSPFB、 RIPC、 FSPFD、 VSANs

A Fibre Channel fabric (or Fibre Channel switched fabric, FC-SW) is a switched fabric of Fibre Channel devices enabled by a Fibre Channel switch. Fabrics are normally subdivided by Fibre Channel zoning.Each fabric has a name server and provides other services. Higher redundancy over FC-AL, P2P.Which path selection protocol is used by Fibre Channel fabrics?()A、OSPFB、RIPC、FSPFD、VSANs

A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A、VLANB、zoningC、trunkingD、LUN masking

A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()A、4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server B、Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module C、Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module D、Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server

A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark).  They like the idea of being able to do SAN maintenance while not incurring downtime.  If all LPARs are production related and similar, which question is most appropriate for the pSeries technical specialist to ask?()A、Would 10/100 Ethernets work as well?B、Should there be eight fibre channel adapters?C、Should there be an async adapter for heartbeat?D、Will all LPARs need access to a common fibre channel tape drive?

A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()A、Suggest a cloud networkB、Direct the customer to redbooks and white papers on FC technologiesC、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transferD、Switch project to iSCSI

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()A、add an expansion frame with additionalFibre Channel portsB、increase the amount of storage by 20 TBC、conduct a Disk Magic study to identify the source of the performance issueD、add additionalFibre Channel ports to the existing DS8700

A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

A customer is ready to order a pSeries solution.  However, the pSeries technical specialist is unsure whether the customer preferred the fibre channel or the external SCSI disk attachment option.  What is the most appropriate action for the specialist to take next?()A、Ask the customer to confirm which option is best for their environment.B、Order the fibre channel option and purchase a converter later if necessary.C、Order both SCSI and fibre channel adapters to cover both potential options.D、Inform the customer that fibre channel was selected for performance reasons.

A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter

An administrator wants to have the flexibility to dynamically move a fibre channel PCI card between given LPARs. For each given LPAR how should they add the PCI card to the LPAR profile?()A、Add the fibre channel card as hared?Add the fibre channel card as ?hared?B、Add the fibre channel card as irtual?Add the fibre channel card as ?irtual?C、Add the fibre channel card as esired?Add the fibre channel card as ?esired?D、Add the fibre channel card as equired?Add the fibre channel card as ?equired?

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD、The NPIV switch will count against the number of domains in a fabric

A prospective customer has selected Fiber Channel (FC) for performance reasons. The prospect does not appear to understand the terminology and options of the fiber channel but is very interested in learning before investing money in this technology. What steps should be taken to make sure the customer is satisfied with the solution?()A、Send customer links to documentation for the FC components included in the solutionB、Direct the customer to Red Books and White Papers on FC technologiesC、Work with business partner to include Lab Services engagement to setup FC environment and perform knowledge transferD、Switch toiSCSI

A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()A、32U B、25U C、22U D、21U

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D、The blade servers do not work with the Optical Pass-Thru Module.

Which interconnect topology is supported for pSeries cluster solutions with Cluster Systems Manager?()A、ATMB、EthernetC、SP Switch2D、Fibre Channel

A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter

单选题A Fibre Channel fabric (or Fibre Channel switched fabric, FC-SW) is a switched fabric of FibreChannel devices enabled by a Fibre Channel switch. Fabrics are normally subdivided by Fibre Channel zoning. Each fabric has a name server and provides other services. Higher redundancy over FC-AL,P2P.Which path selection protocol is used by Fibre Channel fabrics?()A OSPFB RIPC FSPFD VSANs

单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()A4B3C2D8

单选题An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN.  What should the System x Sales Specialist recommend? ()ADS3300 iSCSI-based solutionBOne MegaRAID 8480 card with four EXP3000 unitsCDS4000 Fibre Channel solution with EXP810 expansion unitsDDS3400 Fibre Channel solutionWArialZ

单选题A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated.  The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage.  Each system has the following: ? 2 integrated network ports ?   2 fibre channel adapter cards   ? 1 power supply and redundant cooling   ? HACMP v5.1   In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()AOne fibre channel switchBTwo fibre channel switchesCTwo Ethernet cardsDNothing

单选题A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()A4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server BCisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module CFibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module DCisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server

单选题Which statement describes multihop FCoE function when an FCoE switch receives an FCoE frame from the directly connected FCoE host?()A The switch receives the FCoE frame and forwards it to another switch over its VE port.B The switch receives the FCoE frame, deapsulates it, and sends the Fibre Channel frame to the fabric over its Fibre Channel uplink port.C The switch receives the FCoE frame, deapsulates it, and sends the Fibre Channel frame to the Fibre Channel target over its Fibre Channel port.D The switch receives the FCoE frame and forwards it to another FCoE device over its VN port.

单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A32UB21UC25UD22U

单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()AYoucan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchBUsing blade servers with the NPIV switch will require morefibre ports on the external fibre switchCStorage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.DThe NPIV switch will count against the number of domains in a fabric