单选题The()is the intermediate deck between upper deck and the inside bottom of the vessel.AforcastleBtweendeckChatchesDpeak tanks

单选题
The()is the intermediate deck between upper deck and the inside bottom of the vessel.
A

forcastle

B

tweendeck

C

hatches

D

peak tanks


参考解析

解析: 暂无解析

相关考题:

Regulations define the bulkhead deck as ______.(subdivision and stability regulations)A.any deck extending from stem to sternB.the uppermost deck to which transverse watertight bulkheads extendC.the lowermost deck to which transverse watertight bulkheads extendD.the uppermost complete deck

Strongbacks unshipped in an intermediate deck shall be secured so that they cannot be ______ into a lower compartment.A.movedB.tipped or draggedC.removedD.put

Strongbacks unshipped in an intermediate deck shall not be placed closer than 15.24 cm from ______.A.the coamingB.hatch wayC.fore bulkheadD.aft bulkhead

Which statement about the deck line is TRUE ________.A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships pointB.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shellC.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trimD.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line

______:the vertical distance measured on the vessel’s side amidships from the load water line to the upper side of the freeboard deck or a point corresponding to it.A.BuoyancyB.FreeboardC.DraftD.Displacement

Between the side frames on a vessel, suppot for the deck beam is provided by ______.A.bracketsB.web framesC.deck stringersD.stanchions

Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing

空运的集运商要会填()。A、HAWBB、MAWBC、Main DeckD、Upper Deck

主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.

The deck from bow to stern is called the ()(主甲板).A、main deckB、tweendeckC、upper deckD、lower deck

从船艏贯穿至船艉的甲板叫主甲板。()A、The deck from bow to stern is called the main deck.B、The deck from stern to bow is called the tweendeck.C、The deck from bow to stern is called the upper deck.D、The deck from stern to bow is called the lower deck.

甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.

单选题The()is the intermediate deck between upper deck and the inside bottom of the vessel.AforcastleBtweendeckChatchesDpeak tanks

单选题()is the depth of the vessel at ship’s side from the upper deck to the lowest point of the keel.AExtreme draftBMolded draftCExtreme depthDMolded depth

单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().AgirdersBstanchionsCframesDbeams

单选题A deck above the main deck at the bow is the ()(首楼) deck.AbowBforecastleCsternDpoop

单选题()is from baseline to top of the upper deck breadth at the ship’s side amidships.AExtreme draftBMolded draftCExtreme depthDMolded depth

单选题You must shift a weight from the upper tween deck to the lower hold. This shift will().Amake the vessel more tenderBmake the vessel stifferCincrease the rolling periodDdecrease the metacentric height

单选题By definition,a spar deck is the().Alower most continuous deck not broken by water tight bulkheadsBafter most weather deck above the main strength deckCupper or weather deck above the main strength deckDdeck of light construction below the main or strength deck

单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.

单选题Between the side frames on a vessel,support for the deck beams is provided by().AstanchionsBbracketsCweb framesDdeck stringers

单选题The foremost part of the upper deck is called the().AforecastleBtweendeckChatchesDpeak tanks

单选题You are loading a cargo that includes cylinders of acetylene aboard your break bulk vessel. Which statement is true? ()AThe cylinders must be stowed at least 10 horizontal feet from corrosive materials in the same spaceBStowage in the upper deck-deck is considered to be the equivalent of on deck stowage for this cargoCThe cylinders must have a red label for flammability and a green label for compressed gasDThe cylinders may be protected from the radiant heat of the Sun by laying a tarp on them

单选题What is a spill pipe?()AA drainage pipe that carries rain or spray from an upper deck to a lower deckBA pipe under the anchor windlass leading to the chain lockerCA chute,usually over the stern,to lead dumped garbage clear of the hullDAn opening in the deck leading outside the hull

单选题Cribbing is().Awooden blocks or dunnage placed between a deck load and the deckBthe chains and shackles used to secure a deck cargoCa crate in which a deck cargo is packagedDcardboard separation pieces placed between deck loads to prevent chafing

单选题主甲板以下是二层甲板。()AThe deck below the lower deck is known as ‘tween deck.BThe deck below the main deck is known as ‘tween deck.CThe deck above the main deck is known as ‘tween deck.DThe deck below the lower deck is known as main deck.

单选题从船艏贯穿至船艉的甲板叫主甲板。()AThe deck from bow to stern is called the main deck.BThe deck from stern to bow is called the tweendeck.CThe deck from bow to stern is called the upper deck.DThe deck from stern to bow is called the lower deck.

单选题Right at the top is()It is 300 mm long and 25 mm wide with its upper edgs in line with the uppermost continuous watertight deck.Athe deck lineBPlimsoll discCPlimsoll lineDsunmmer load line