单选题What is a spill pipe?()AA drainage pipe that carries rain or spray from an upper deck to a lower deckBA pipe under the anchor windlass leading to the chain lockerCA chute,usually over the stern,to lead dumped garbage clear of the hullDAn opening in the deck leading outside the hull

单选题
What is a spill pipe?()
A

A drainage pipe that carries rain or spray from an upper deck to a lower deck

B

A pipe under the anchor windlass leading to the chain locker

C

A chute,usually over the stern,to lead dumped garbage clear of the hull

D

An opening in the deck leading outside the hull


参考解析

解析: 暂无解析

相关考题:

The safety stopper that prevents the anchor cable from running free if the cable jumps the wildcat is the ______.A.riding pawlB.devil's clawC.buckler plateD.spill pipe

What is NOT a requirement of cargo piping installed in tank vessels carrying grade D or E cargo ONLY ________.A.The cargo piping system shall be fixedB.Flanged joints shall be used for pipe sizes exceeding 2 inches in diameterC.Piping through bunker spaces may be run through a pipe tunnelD.Connections at bulkheads must be made so that the plating does not form part of a flanged joint

The opening in the deck beneath the anchor windlass that leads to the chain locker is the ______.A.Hawse pipeB.Fall pipeC.Drop-pipeD.Spill pipe

The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe

______ contains procedures for the actions that can be taken if there is a fire or spill of dangerous goods.A.MFAGB.EmSC.IMDGD.BC

As oil pipe line connections were broken, _____ quantity of oil was caused to spill onto the wharf and into the dock water.A.a not knowingB.an unknowingC.an unknownD.a not know

The following tells us how to reuse the used water.Which is the right order of the passage A.to have the used water filteredB.to put chemicals in itC.to pipe it to the usersD.to pipe the used water to be purified to a factory

引入管service pipe

管()A、lineB、hoseC、hawseD、pipe

下管pipe sinking

ALL CREW ASSIST TO CLEAN UP SPILL.的意思是:所有船员协助清理溢油。

干线型肝硬变(pipe stem cirrhosis)

QOS管道模型有下列哪几种?()A、差分模型B、Uniform模型C、Pipe模型D、Short Pipe模型

单选题Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()AOpen the intake valve to an adjacent tankBSet out drip pans and sawdust and begin to mop up the spillCSignal the shore control point to shut downDClose the valve on the tank vent line

单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().AstringBstandCjointDstandpipe

单选题The supplement to the IOPP Certificate contains what type of data? ()AThe grades of cargo that an oil tanker is permitted to carryBA checklist of the equipment installed for controlling the discharge of oilCThe trade routes upon which the vessel may operateDA list of the underwriters who will assume financial responsibility in the event of an oil spill

单选题What will NOT increase friction of a liquid flowing in a pipe and cause a loss of suction head?().ABends in the pipingBSlowing the pumping rateCPipeline valvesDBacking rings for pipe welds

单选题“Before disconnecting the oil pipe, would you flush the oil retained in the pipe?” asked the oil barge owner ()Aby using of fresh waterBwith compressed airCby using of sea waterDwith chemical compound

单选题As oil pipe line connections were broken,()quantity of oil was caused to spill onto the wharf and into the dock water.Aa not knowingBan unknowingCan unknownDa not known

单选题Which of the followings is not an indication of a bad maintenance?()Aa pipe with welded connectionsBa pipe with several clipsCa cement boxDa leaking valve

单选题In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().AswivelBcathead spoolCdrawworksDstand pipe

单选题The outside diameter of the pipe is () the diameter of the bore of the piston rod, the result being that an annular space formed between the piston rod and the pipe.Aless thanBgreater thanCequal toDtwice larger than

单选题During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().Aimmediately flush the spill with large quantities of fresh waterBcover the contaminated surface with soda-ash-soaked lime solutionCadd sodium bisulfate on the contaminated surface and spray it down with waterDmove to a position upwind of the spill and allow the product to boil off

名词解释题引入管service pipe

单选题When possible,what should be the FIRST step in combating a fire on deck resulting from a cargo overflow or a leaking cargo line?()ABlanket the cargo spill with foamBPrevent the spread of fire with a foam damCApply CO2 on burning fuel at its sourceDShut off the transfer of cargo

单选题If a spill occurs,where would you log it().AOil Record BookBBell bookCSmooth logbookDOfficial Logbook

单选题After making the required notification that a large oil spill into the water has occurred,the FIRST action should be to().Aapply straw or sawdust on the oilBcontain the spread of the oilCthrow grains of sand into the oilDhave the vessel move out of the spill area