单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().AgirdersBstanchionsCframesDbeams
单选题
The deck plating on a ship is supported primarily by deck longitudinals and deck().
A
girders
B
stanchions
C
frames
D
beams
参考解析
解析:
暂无解析
相关考题:
甲板部由大副负责。A.The captain is the head of a ship.B.The master is the head of a ship.C.The deck department is under the command of the chief officer.D.The pilot is the head of a ship.
Which statement concerning the carriage of containers is TRUE? ______.A.The Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in portB.When stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughoutC.With tiered containers,a 40-foot container may be stowed on top of two 20-foot containersD.Deck load calculations must take into account the square footage of the entire container bottom
A deck beam does NOT ______.A.act as a beam to support vertical deck loadsB.lessen the longitudinal stiffness of the vesselC.act as a tie to keep the sides of the ship in placeD.act as a web to prevent plate wrinkling due to twisting action on the vessel
甲板部由大副负责。()A、The captain is the head of a ship.B、The master is the head of a ship.C、The deck department is under the command of the chief officer.D、The pilot is the head of a ship.
主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.
艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.
Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck
The station lists are posted ()on board a ship.A、in the engine roomB、on the gangwayC、in public placesD、on the deck
甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.
单选题A deck beam does NOT().Aact as a beam to support vertical deck loadsBlessen the longitudinal stiffness of the vesselCact as a tie to keep the sides of the ship in placeDact as a web to prevent plate wrinkling due to twisting action on the vessel
单选题Support of ship side plating is provided primarily by transverse().AbeamsBgirdersCframesDbulkheads
单选题船上的船员属于三个部门:甲板部、轮机部和事务部。()ASeamen on board the ship are in two departments: Deck Department, Engine Department.BSeaman on board the ship are in two department: Deck Department, Engine Department and Service Department.CThe Deck Department and the Engine Department are the two departments.DSeamen on board the ship are in three departments: the Deck Department, the Engine Department and the Service Department.
单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.
单选题Stanchions prevent the entire deck load on a ship from being carried by the().AbulkheadsBstringersCframes and beam bracketsDdeck longitudinals
单选题The deck loads on a ship are distributed through the deck beams to the().AframesBhullCstringersDplates
单选题The garboard strake is the().Araised flange at the main deck edgeBriveted crack arrester strap on all-welded shipsCriveting pattern most commonly used in ship constructionDrow of plating nearest the keel
单选题The heavier outboard strake of deck plating on a ship is called the deck().AstiffenerBbeamCstringerDdoubler
单选题The purpose of cant frames in steel vessel is().ATo support the overhang of the sternBTo strength the plating against the pounding of the seaCTo add srength to the deck beams which support the weather deckDTo support the plating of a cylindrical tank
单选题What is the purpose of cant frames in steel vessels? ()ATo support the overhang of the sternBTo provide strength to shell plating at the sternCTo add strength to the deck beams which support the weather decksDTo support the plating of a cylindrical tank
单选题The fore and aft run of deck plating which strengthens the connection between the beams and the frames and keeps the beams square to the shell is called the().Agarboard strakeBlimber strakeCsheer strakeDstringer strake
单选题The margin plate is the().Aoutboard strake of plating on each side of an innerbottomBouter strake of plating on each side of the main deck of a vesselCplate which sits atop the center vertical keelDuppermost continuous strake of plating on the shell of a vessel
单选题The purpose of sheer in ship construction is to().Aallow the ship to ride waves with drier decksBeliminate the need for butt strapsCeliminate the need for margin platesDgive greater strength at the deck edge
单选题主甲板以下是二层甲板。()AThe deck below the lower deck is known as ‘tween deck.BThe deck below the main deck is known as ‘tween deck.CThe deck above the main deck is known as ‘tween deck.DThe deck below the lower deck is known as main deck.