Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years
Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.
A.Year
B.Two years
C.Four years
D.Five years
相关考题:
All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo
If your passenger vessel is fitted with a loudspeaker system,it must be tested at least once ______.A.every weekB.a dayC.every tripD.a watch or once a trip,whichever is shorter
The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
单选题If the moisture content of the cargo sample is()the Transportable Moisture Limit,then the cargo should be safe to load.AaboveBbelowCequal toDuncertain
单选题On offshore drilling units,each EPIRB or SART must be tested once every().AdayBweekCmonthDyear
单选题In relation to cargo gear,what does SWL mean?().ASafe working loadBShips working liftCStarboard wing liftDStress , weight , load
单选题In relation to cargo gear,what does SWL mean?().ASafe working loadBShip's working liftCStarboard wing liftDStress,weight,load
单选题A lifeboat is weight tested by lowering to near the waterand loading to capacity with weight evenly distributed. Itis then lowered into the water and released. This test mustbe done at least once every().A6 monthsB12 monthsC18 monthsD24 months
单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().Aone-half the SWL of the main towing hawserBthree-fourths the SWL of the main towing hawserCthat of the main towing hawserDtwice that of the main towing hawser
单选题Please()that my ship is ready in every respect to load her cargo.AadvisedBto be advisedCbe advisedDare advised
单选题Vessels transiting the canal must have their accommodation ladders and cargo booms().AremovedBrigged inCreadjustedDtested
单选题Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().Aafter torque causes line pull to exceed the rated capacity of the winchBbefore the line pull reaches the rated capacity of the winchCwhen the line pull reaches the breaking strength of the fallDbefore the safe working load of the fall is reached
单选题It is not the Charterer’s duty that().Ahe must procure a cargo and bring it alongside the vesselBhe must load a full and complete cargoChe must load in the time stipulatedDhe must have the vessel tightly secured to the quay where the loading is to take place
单选题What does the abbreviation SWL stand for?().ASignal wave lettersBShip without lightCSafe water lineDSafe working load
单选题Hoses used for cargo transfer operations must be tested and inspected at specified intervals by().Aa representative of the Captain of the PortBthe operator of the vessel or facilityCa representative of the National Cargo BureauDlow inert gas temperature
单选题Hoses used for cargo transfer operations must be tested abdinspected at specified intervals by ().Aa representative of the Captain of the PortBthe operator of the vessel or facilityCa representative of the National Cargo BureauDa representative of the American Bureau of Shipping
单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A5 times the maximum working pressure on the hose during cargo transferBone half the designed working pressureC4 times the pressure of the cargo pump used for transferringD5 times the minimum working pressure on the hose during cargo transfer
单选题The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().AdeckBhead of the boomCheel of the boomDmast or king post
单选题Cargo vessels being navigated,and fitted with emergency lighting and power systems,shall have their emergency systems tested at least once().Aa monthBin each weekCin every 6 monthsDin every 12 months
单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().AyearBtwo yearsCfour yearsDfive years