单选题A continuous watertight bulkhead on a ship is normally also a(n)().Astructural bulkheadBexterior bulkheadCcenterline bulkheadDjoiner bulkhead
单选题
A continuous watertight bulkhead on a ship is normally also a(n)().
A
structural bulkhead
B
exterior bulkhead
C
centerline bulkhead
D
joiner bulkhead
参考解析
解析:
暂无解析
相关考题:
The emergency signal for fires is sounded on the ship’s whistle and general alarm as _____.A.a continuous ringing for 10 secondsB.one short ring followed by one long ringC.two long rings of at least 20 secondsD.a continuous ringing until the fire is extinguished
A ship having continuous closely spaced transverse strength members is ______.A.longitudinally framedB.transversely framedC.cellular framedD.web framed
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead ______.A.penetrationsB.platingC.framingD.brackets
When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ______.A.maximum possible areaB.minimum possible areaC.nearest watertight doorD.nearest longitudinal girder
A continuous watertight bulkhead is normally also a(n)______.A.Structural bulkheadB.Exterior bulkheadC.Centerline bulkheadD.Joiner bulkhead
Regulations define the bulkhead deck as ______.(subdivision and stability regulations)A.any deck extending from stem to sternB.the uppermost deck to which transverse watertight bulkheads extendC.the lowermost deck to which transverse watertight bulkheads extendD.the uppermost complete deck
单选题On a ship,watertight doors should be operated().Aduring abandon drillBduring fire drillCweeklyDwhen the rig is being moved
单选题The downflooding angle for a ship is the minimum angle at which().Athe load line becomes submergedBa non-watertight opening is at still water levelCoffset becomes excessiveDreserve buoyancy is a maximum
单选题A ship having continuous closely spaced transverse strength members is().Alongitudinally framedBtransversely framedCcellular framedDweb framed
单选题In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().ApenetrationsBplatingCframingDbrackets
单选题Progressive flooding is controlled by securing watertight boundaries and().Atransferring water ballastBjettisoning cargoCpumping out flooded compartmentsDabandoning ship
单选题Progressive flooding on a ship is controlled by securing watertight boundaries and().Atransferring drill waterBdumping bulk materialsCpumping out flooded compartmentsDevacuating the unit
单选题Reserve buoyancy is().Aalso called GMBthe void portion of the ship below the waterline which is enclosed and watertightCaffected by the number of transverse watertight bulkheadsDthe watertight portion of a vessel above the waterline
单选题Fibers of hair and wool are not continuous and must normally be spun into thread when woven into textile fabrics.Aas are theyBwhen to beCthat they areDif they are to be
单选题Horizontal subdivision decks forming watertight compartments in the columns of a semisubmersible ship increase the unit’s().Atank capacitiesBstability in the event of damageCtowing speedDanchor holding ratio
单选题Structural bulkheads on a ship are usually().AcontinuousBwatertightCtransverseDnon-watertight
单选题In case a ship is in emergency or distress in any of 4 areas, it is required to use the continuous()alert.AMF/HFBSARTCEPIRBDany of A, B, C
单选题The emergency signal for fires is sounded on the ship’s whistle and general alarm as().Aa continuous ringing for 10 secondsBone short ring followed by one long ringCtwo long rings of at least 20 secondsDa continuous ringing until the fire is extinguished
单选题When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ().Amaximum possible areaBminimum possible areaCnearest watertight doorDnearest longitudinal girder
单选题The objective of shoring a damaged bulkhead is to().Aforce the warped, bulged, or deformed sections back into placeBsupport and hold the area in the damaged positionCwithstand subaequent additional damagedDmake a watertight seal at the damaged area
单选题A continuous watertight bulkhead is normally also a (n)().Astructural bulkheadBexterior bulkheadCcerterline bulkheadDjoiner bulkhead
单选题Your ship has run aground and it is necessary to determine whether or not a compartment has floodedTherefore, you should ().Aopen the watertight door and take a quick lookBopen the hatch dogs on the side away from the hingesCtap the bulkhead with a hammer to check for a water levelDfeel the bulkhead to see if it is hot
单选题Container-ship capacity is normally expressed in().Adeadweight tonsBmeasurement tonsCdisplacement tonsDTEU
单选题Right at the top is()It is 300 mm long and 25 mm wide with its upper edgs in line with the uppermost continuous watertight deck.Athe deck lineBPlimsoll discCPlimsoll lineDsunmmer load line