单选题When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ().Amaximum possible areaBminimum possible areaCnearest watertight doorDnearest longitudinal girder
单选题
When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ().
A
maximum possible area
B
minimum possible area
C
nearest watertight door
D
nearest longitudinal girder
参考解析
解析:
暂无解析
相关考题:
“You missed a golden opportunity.” “Yes, I ________ that job when it was offered.” A.shall takeB.shall have takenC.should takeD.should have taken
(b) (i) Discuss the main factors that should be taken into account when determining how to treat gains andlosses arising on tangible non-current assets in a single statement of financial performance. (8 marks)
When an azimuth of the Sun has been taken and the deviation of the standard magnetic compass computed,the watch officer should record the results ______.A.in the vessel's Official LogbookB.on the compass deviation cardC.in the compass deviation logD.on a Napier diagram
The objective of shoring the damaged area of a ship is to ______.A.force the warped,bulged,or deformed sections back into placeB.support and hold the area in the damaged positionC.withstand subsequent additional damageD.make a watertight seal at the damaged area
When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ______.A.maximum possible areaB.minimum possible areaC.nearest watertight doorD.nearest longitudinal girder
What is an important consideration that should be taken into account when configuring shaped round robin?()A、It enables policing.B、Strict priority is not supported.C、WRED must be previously enabled.D、It enables WRR
单选题When installing a hydraulic hose, which of the following precautions should be taken?()AThe hose should not be twistedBThe hose should be protected with a sleeve if it is subjected to rubbingCThere should be some slack in the hoseDAll of the above
单选题What is an important consideration that should be taken into account when configuring shaped round robin?()AIt enables policing.BStrict priority is not supported.CWRED must be previously enabled.DIt enables WRR
单选题What additional precautions should be taken when making temporary repairs to a ship that is operating when hydrogen sulfide is present?()ASeal off all tank and compartment ventilationBRemove all bulk materials from the P-tanksCProvide respiratory protection and monitoringDAll of the above
单选题Which of the following actions should be taken by the engine room watch when the general alarm is sounded continuously?()AThe fire pump should be startedBThe boiler rims should be securedCThe fixed CO2 system should be initiated into actionDThe engine room ventilation should be secured
单选题Damaged bulkheads often take a permanent set which is independent of the panting or bulge caused by water pressure. To control this,you should().Ainstall shoring so the shoring supports the damaged bulkheads without pushing on themBinstall shoring so that it pushes on the damaged bulkhead while supporting itCuse jacks or chain falls to remove the set before installing shoresDplace sandbags by the bulkhead without installing shores
单选题Following the failure of one turbocharger on a large, crosshead, main propulsion diesel engine, fitted with multiple turbochargers, which of the following actions should be taken prior to further operation of the engine? ()ABlank off the exhaust gas inlet to the damaged turbochargerBSecure cooling and lubrication to the damaged turbochargerCLock the rotor of the damaged turbochargerDAll of the above
单选题The load limitation of governor should be reduced when ship navigating at sea, the main reason is to()Aprevent the diesel engine surgingBprevent governor from being damaged because of swingCreduce the probability of the crank shaft being torsional vibrated and resonatedDprevent the main engine being overload or overspeed
单选题Damaged bulkheads often take a permanent set which is independent of the panting or bulge caused by water pressure. To control this, you should().Ainstall shoring so the the shoring supports the damaged bulkhead without pushing on themBinstall shoring so that it pushes on the damaged bulkhead while supporting itCuse jacks or chain falls to remove the set before installing shoresDplace sandbags by the bulkhead without installing shores
单选题Which of the following actions should normally be taken during each watch when the auxiliary boilers is in operation?()Aclean the flame scanner photocell windowBInspect and clean all solenoid valvesClift the safety valves by handDInspect for oil or water leaks
单选题()is just to put it()and notify me as to where and how the cargo was damaged.AWhat you ought to do with the damaged cargo/asideBWhat you should do with the damaged cargo/besideCWhat will you do with the damaged cargo/besideDWhat have you to do with the damaged cargo/side by side
单选题The objective of shoring the damaged area of a ship is to().Aforce the warped,bulged,or deformed sections back into placeBsupport and hold the area in the damaged positionCwithstand subsequent additional damageDmake a watertight seal at the damaged area
单选题The objective of shoring a damaged bulkhead is to().Aforce the warped, bulged, or deformed sections back into placeBsupport and hold the area in the damaged positionCwithstand subaequent additional damagedDmake a watertight seal at the damaged area
单选题Which of the actions listed should be taken by the engineer on watch when the general alarm is sounded continuously for 10 seconds?()AEngine room ventilation should be startedBMain engines should be securedCThe fire pump should be startedDThe fixed CO2 system should be activated
单选题Which precaution should be taken when testing a line throwing gun?()ANever remove the line from the rocketBFire it at an angle of approximately 90 degrees to the horizonCWear asbestos glovesDAll of the above
单选题Your ship has run aground and it is necessary to determine whether or not a compartment has floodedTherefore, you should ().Aopen the watertight door and take a quick lookBopen the hatch dogs on the side away from the hingesCtap the bulkhead with a hammer to check for a water levelDfeel the bulkhead to see if it is hot
单选题When fighting a fire with a portable dry chemical fire extinguisher,the stream should be directed().Aover the top of the flamesBoff a bulkhead into the fireCin front of the fireDat the base of the fire
单选题When using carbon dioxide to fight a fire on a bulkhead,the CO2 should be applied().Afirst to the bottom of the flaming area,sweeping from side to side,and following the flames upwardBin a circular motion from the middle of the bulkhead outwardCto the top of the flaming area,sweeping from side to side,and working toward the bottomDin an up-and-down motion from one side of the bulkhead to the other