单选题Keeping the draft at or below the load line mark will insure that the vesselhas adequate().AballastBreserve buoyancyCdisplacementDrolling periods

单选题
Keeping the draft at or below the load line mark will insure that the vesselhas adequate().
A

ballast

B

reserve buoyancy

C

displacement

D

rolling periods


参考解析

解析: 暂无解析

相关考题:

The maximum draft to which a vessel can legally be submerged is indicated by the ______.A.Loadline markB.Certificate of InspectionC.Station BillD.Tonnage mark

As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record ______.A.all information contained on the barge's Certificate of InspectionB.the condition of all towing gear to be usedC.all navigational aids to be usedD.the barges load line and draft readings

You are loading in the winter in Albany,N.Y.,for a voyage to a port governed by the tropical load line mark. Which of the following statements is TRUE? (Hydrometer reading in Albany is 1.000)A.You may not exceed the winter load line mark when you finish loading except for the burnout to seaB.You may calculate the burnout necessary to reach the tropical zone and load extra cargo to compensateC.The freshwater allowance and burnout to sea may be subtracted from the required freeboard in AlbanyD.You may load to the winter mark less the fresh water allowance if you will be at the tropical mark upon arrival in the tropical zone

The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

Keeping the draft at or below the load line mark will insure that the vessel has adequate ___.A.ballastB.reserve buoyancyC.displacementD.rolling periods

Which of the following can be used to insert a new line below the current line inside a vi session?()A、oB、aC、pD、A

What is true regarding direct-load insert?()A、A direct-load insert can be invoked by suing the APPEND hint.B、Inserting using the NOLOGGING option is the default for direct-load inserts.C、All data loaded using direct-load insert is loaded below the high-water mark.D、An object that is modifies using parallel direct-load can be queried within the same Transaction.

单选题Keeping the draft at or below the load line mark will insure that the vessel has adequate().AballastBreserve buoyancyCdisplacementDrolling periods

单选题A vessel displaying three red lights in a vertical line is().Anot under commandBagroundCdredgingDconstrained by her draft

单选题The ship has()of more than 10 meters at full load.Aan engineBan overall lengthCa displacementDa draft

单选题Which of the following can be used to insert a new line below the current line inside a vi session?()AoBaCpDA

单选题A disk with a horizontal line through its center, equivalent to the summer load line, is called the().Adeadrise markBmaximum alloable draft markCpilmsoll markDtonnage mark

单选题When ship is fouled, increasing the fuel injection for keeping the normal speed will cause the main engine ()Ato work as overload characteristicBoverspeedCover mechanical load onlyDover thermal load only

单选题The mean draft of a ship is the draft().Amidway between the forward and aft draft marksBat the center of flotationCat the load lineDat the center of buoyancy

单选题()is the draft of your ship at full load?AHow manyBHow muchCHow highDWhat

单选题In line 38, the word mark most nearly means ______.AblemishBetchingCindicationDsymbolEportent

单选题A load line is assigned to a ship to insure adequate stability and().Amooring tensionBriser tensionClifesaving equipmentDstructural strength

单选题Which is the summer load waterline on the load waterline mark?().AThe first line at the bottomBThe second line from the bottomCThe third line from the bottomDThe fourth line from the bottom

单选题The International Load Line Certificate is a document indicating () of the various load lines of the vessel.AdecksBcabinsCholdsDpositions

单选题The holding power of an anchor is the().Amaximum sustained vertical load an anchor will resist before draggingBmaximum sustained horizontal load an anchor will resist before draggingCmaximum sustained vertical load an anchor will resist before the mooring line breaksDmaximum sustained horizontal load an anchor will resist before the mooring line breaks

单选题Vertically below the deckline is a circle whose outside diameter is 300mm.It is called the().Athe deck lineBPlimsoll discCPlimsoll lineDsummer load line

单选题Load line regulations are designed to insure that a vessel has adequate structural strength and sufficient().Alifesaving equipmentBstabilityCmooring tensionDriser tension

单选题The maximum draft to which a vessel can legally be submerged is indicated by the ().ALoadline markBCertificate of InspectionCStation BillDTonnage mark

单选题Which is the winter load waterline on the load waterline mark?().AThe line over the summer load waterlineBThe line above the tropical load waterlineCThe line below the tropical load waterlineDThe line between the summer and the winter north Atlantic load waterline

单选题What is true regarding direct-load insert?()AA direct-load insert can be invoked by suing the APPEND hint.BInserting using the NOLOGGING option is the default for direct-load inserts.CAll data loaded using direct-load insert is loaded below the high-water mark.DAn object that is modifies using parallel direct-load can be queried within the same Transaction.

单选题As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record().Aall information contained on the barge's Certificate of InspectionBthe condition of all towing gear to be usedCall navigational aids to be usedDthe barges load line and draft readings

单选题What does MBDD mean on the load waterline mark?().ATimber tropical load waterlineBTimber summer load waterlineCTimber winter load waterlineDTimber winter north Atlantic load waterline