单选题()is the draft of your ship at full load?AHow manyBHow muchCHow highDWhat

单选题
()is the draft of your ship at full load?
A

How many

B

How much

C

How high

D

What


参考解析

解析: 暂无解析

相关考题:

The stevedores are going to load your ship in ________ daysA.fewB.a fewC.littleD.a little

Our bank will accept your 60 days’draft ()them for the amount of your invoice value. A、forB、toC、onD、with

You are on a 165-foot (50.3 meters) long vessel with a draft of 9 feet (2.7 meters) and twin screws. Which statement about rescuing a survivor in the water with ship pickup is TRUE?A.You should stop to windward of the man and drift down on himB.You should stop with the man on your weather beam and twist the ship up to himC.A pickup off the weather bow gives maximum maneuverability with the least possibility of injury to the manD.Ship pick up should never be used with a shallow draft vessel

As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record ______.A.all information contained on the barge's Certificate of InspectionB.the condition of all towing gear to be usedC.all navigational aids to be usedD.the barges load line and draft readings

You are on a 50.3 meters long vessel with a draft of 2.7 meters and twin screws.Which statement about rescuing a survivor in the water with ship pickup is TRUE ________.A.You should stop to windward of the man and drift down on himB.You should stop with the man on your weather beam and twist the ship up to himC.A pickup off the weather bow gives maximum maneuverability with the least possibility of injury to the manD.Ship pick up should never be used with a shallow draft vessel

______is the number of millimeters by which the mean draft changes when a ship passes from salt water to fresh water,or vice versa,whilst floating at the loaded draft.A.TPCB.The Fresh Water AllowanceC.Parallel sinking of the shipD.UKC

We are awaiting your revised draft()keen interest.

The ()from waterline to the bottom of the ship is called draft.A、breadthB、depthC、widthD、height

从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.

英译中:Full container load(FCL)

单选题You are on a 165-foot (50.3 meters) long vessel with a draft of 9 feet (2.7 meters) and twin screws. Which statement about rescuing a survivor in the water with ship pickup is TRUE? ()AYou should stop to windward of the man and drift down on himBYou should stop with the man on your weather beam and twist the ship up to himCA pickup off the weather bow gives maximum maneuverability with the least possibility of injury to the manDShip pick up should never be used with a shallow draft vessel

单选题Keeping the draft at or below the load line mark will insure that the vessel has adequate().AballastBreserve buoyancyCdisplacementDrolling periods

单选题The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.AisBmakesChasDtakes

单选题The ship has()of more than 10 meters at full load.Aan engineBan overall lengthCa displacementDa draft

单选题()is your draft?AWhatBHowCWhichDWhen

单选题The mean draft of a ship is the draft().Amidway between the forward and aft draft marksBat the center of flotationCat the load lineDat the center of buoyancy

单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ALCGBtransverse momentCrighting momentDinclining moment

单选题The ship should have a slightly deeper draft().Aon port sideBon starboard sideCat the port quarterDat the stern

单选题The stevedores()load your ship in a few days.Ais going toBare going toCwas going toDare go to

单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题()is not a static load.AActual weight of the ship's structure,outfitting,equipment and machineryBBallast load(weight)CCargo loadDSlamming and sloshing load

单选题From the waterline to the ship’s()(底部) is called draft.AtopBbridgeCbottomDmiddle

单选题Which of the following statements is correct regarding a turbocharged four-stroke/cycle diesel generator?()AAt zero load the intake manifold pressure is greater than the exhaust manifold pressureBAt full load the intake manifold pressure and exhaust manifold pressure are equalCAt full load the intake manifold pressure is less than the exhaust manifold pressureDAt full load the intake manifold pressure is greater than the exhaust manifold pressure

单选题Keeping the draft at or below the load line mark will insure that the vesselhas adequate().AballastBreserve buoyancyCdisplacementDrolling periods

单选题从水线到船底是“吃水”。()A“From the centerline to the ship’s bottom” is “draft”.B“From the keel to the ship’s bottom” is “draft”.CThe maximum distance from the waterline to the ship’s bottom is “draft”.D“From the centerline to the ship’s main deck” is “draft”.

单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().Aboom angleBboom strengthCload radiusDcable strength

单选题As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record().Aall information contained on the barge's Certificate of InspectionBthe condition of all towing gear to be usedCall navigational aids to be usedDthe barges load line and draft readings