Stop________the derrick at once, the gooseneck is bent.A.to useB.to operateC.maneuveringD.using
Stop________the derrick at once, the gooseneck is bent.
A.to use
B.to operate
C.maneuvering
D.using
相关考题:
把吊杆甩向码头。()A、Please swing the derrick to wharf side.B、Just go down the derrick , please.C、Just a moment , please.D、Please swing the derrick to inboard.
请修理一下受损吊杆。()A、Please have the damaged derrick readjusted.B、Please have the damaged derrick repaired.C、Please have the damaged derrick painted.D、Please have the damaged derrick brushed.
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick
重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.
()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire
The blocks and gooseneck of the jumbo need ().A、dismantling and inspectingB、dismantled and inspectedC、to dismantle and inspectD、dismantle and inspect
这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.
这个鹅颈头弯了。()A、This gooseneck is bent.B、This derrick is bent.C、This winch is in trouble.D、This block is worn out.
单选题这个吊杆的安全工作负荷是6吨。()AThe SWL of the derrick is five tons.BThe SWL of the heavy derrick is six tons.CThe SWL of the derrick is six tons.DThe SWL of the crane is six tons.
单选题The net productivity per gang-hour can be improved through a decrease of().ACranes/derricksBCrane/derrick cyclesCCrane/derrick cycle timeDWeight per package
单选题这个鹅颈头弯了。()AThis gooseneck is bent.BThis derrick is bent.CThis winch is in trouble.DThis block is worn out.
单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space
单选题The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。
单选题请调高一下吊杆。()ALower the derrick, please.BTop the derrick, please.CSwing the derrick, please.DAdjust the derrick, please.
单选题A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().AlengthBslackCheightDrotation direction
单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).AA capstanBA holdCA warp endDA mooring drum
单选题()has more than ten percent broken wires. Stop using it at once.AThe cargo runnerBThe cargo blockCThe derrick slingDThe lashing wire