单选题()using the derrick at once,the gooseneck is bent.AContinueBStartCCommenceDStop

单选题
()using the derrick at once,the gooseneck is bent.
A

Continue

B

Start

C

Commence

D

Stop


参考解析

解析: 暂无解析

相关考题:

The fighter would rather die with his head high than ____ with his knees bent. A.to liveB.livingC.liveD.lived

Stop________the derrick at once, the gooseneck is bent.A.to useB.to operateC.maneuveringD.using

The ()is fixed at the bottom of the derrick.A、gooseneckB、blockC、derrick stepD、crane

The gooseneck is (). Stop using it at once.A、bendB、bentC、bandD、bended

把吊杆甩向码头。()A、Please swing the derrick to wharf side.B、Just go down the derrick , please.C、Just a moment , please.D、Please swing the derrick to inboard.

请修理一下受损吊杆。()A、Please have the damaged derrick readjusted.B、Please have the damaged derrick repaired.C、Please have the damaged derrick painted.D、Please have the damaged derrick brushed.

gooseneck()A、鹅颈头B、滑车C、滑轮D、抓斗

请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?

The ()(吊杆托架) supports the derrick.A、derrick boom restB、derrick headC、derrick mastD、derrick guy

This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick

弯漆刷()A、gooseneck paint brushB、flat paint brushC、hacksawD、hand saw

重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.

()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire

The blocks and gooseneck of the jumbo need ().A、dismantling and inspectingB、dismantled and inspectedC、to dismantle and inspectD、dismantle and inspect

这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.

这个鹅颈头弯了。()A、This gooseneck is bent.B、This derrick is bent.C、This winch is in trouble.D、This block is worn out.

单选题这个吊杆的安全工作负荷是6吨。()AThe SWL of the derrick is five tons.BThe SWL of the heavy derrick is six tons.CThe SWL of the derrick is six tons.DThe SWL of the crane is six tons.

单选题这个鹅颈头弯了。()AThis gooseneck is bent.BThis derrick is bent.CThis winch is in trouble.DThis block is worn out.

单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().AdockBholdCpedestalDmachinery space

单选题The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。

单选题请调高一下吊杆。()ALower the derrick, please.BTop the derrick, please.CSwing the derrick, please.DAdjust the derrick, please.

单选题gooseneck()A鹅颈头B滑车C滑轮D抓斗

单选题A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().AlengthBslackCheightDrotation direction

单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).AA capstanBA holdCA warp endDA mooring drum

单选题()using the derrick at once, the gosseneck is bent.AContinueBStartCCommenceDStop

单选题Stop()the derrick at once,the gooseneck is bent.Ato useBto operateCmaneuveringDusing

单选题()has more than ten percent broken wires. Stop using it at once.AThe cargo runnerBThe cargo blockCThe derrick slingDThe lashing wire