Holes in the bulwark,which allow deck water to drain into the sea,are ______.A.DoggersB.FidleysC.Freeing portsD.Swash ports

Holes in the bulwark,which allow deck water to drain into the sea,are ______.

A.Doggers

B.Fidleys

C.Freeing ports

D.Swash ports


相关考题:

In the following statements about the principle of the low level controlling, which is WRONG? 0 A.Low level is monitored on the drain tank and header tank.B.If there is high differential the filters pressure across the circulatingpumps is alarmedC.The lubricating oil purifier cannot take oil from the drain tankD.If the sea water pressure falls, this also operates an alarm

Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?A.Baffle plates that have been bent during prior removalB.Leaks m the cooler tube nestC.Operating the engine while maintaining a high sea water outlet temperatureD.A punctured sea water strainer supplying cooling water to the heat exchanger

Which statement about damage control is TRUE ________.A.A hole in the hull at the waterline is more dangerous than a hole below the inner bottomB.The amount of water entering a ship through a hole varies inversely to the area of the holeC.Water flowing into a lower compartment on a ship is more dangerous than water on deck or flowing into an upper compartmentD.Water flowing over the forecastle bulwark is more dangerous than a hole in the hull at the waterline

What is the purpose of limber holes ________.A.To allow for air circulationB.To allow for stress and strain in rough watersC.To allow water in the boat to drain overboardD.To allow water in the bilge to get to the boat drain

Freeing ports on a vessel with solid bulwarks ______.A.prevent stress concentration in the bulwarkB.permit easy jettison of deck cargo in an emergencyC.provide openings through the bulwarks for mooring linesD.allow water shipped on deck to flow off rapidly

Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck

()(舷墙排水孔) permits the escape of water.A、A wash portB、A bulwark portC、A+BD、Bulkhead

The ()(排水孔) is a deck drain.A、jackstaffB、bilge bracketC、scupperD、ensign

Which of the following default ports must be opened to allow a technician to telnet into a machine?()A、21B、23C、24D、25

单选题If the piston groove drain holes for the oil control rings become clogged, which of the following is likely to occur?()AThe oil control rings will seal improperly and wear rapidlyBThe piston will overheat due to insufficient lubricationCExcessive oil will remain on the cylinder wallDLight brown smoke will emanate from the engine exhaust

单选题A (n) () is a chemical or electro-chemical attack on the metal surface which may be further increased if the sea-water is polluted.AerosionBcorrosionCcavityDscouring

单选题The object of plugging holes below the waterline on a ship should be to().Aeliminate all water entering the holeBonly plug holes in machinery or other vital spacesCreduce the entry of water as much as possibleDplug the largest holes first

单选题In a central cooling system, used in some modem ships, sea water is supplied to cool ()which will circulate to other individual cooler, greatly reducing the corrosion problems.Amain bearingsBsea waterCcooling oilDlower temperature fresh water

单选题Which of the following factors tends to increase scale formation on the saltwater side of a heat exchanger used in a diesel engine cooling water system?()ABaffle plates that have been bent during prior removalBLeaks in the cooler tube nestCOperating the engine while maintaining a high sea water outlet temperatureDA punctured sea water strainer supplying cooling water to the heat exchanger

单选题The height of a light is measured from which reference plane?()AMean low waterBMean high waterCAverage water levelDGeographical sea level

单选题Holes in the bulwark,which allow deck water to drain into the sea,are().AdoggersBfidleysCfreeing portsDswash ports

单选题A chock().Ais a deck fitting used to shackle gear to the deckBpermits easy jettisoning of deck cargo in an emergencyCprevents stress concentration in the bulwarkDprovides openings through the bulwark for mooring lines

单选题During which condition should the operator of a pedestal crane shutdown operations?()ABunkeringBHigh windsCPotable water spill on deck

单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()Aigniting boilerBreleasing air in sea water systemCstarting generatorDcut off shore power

单选题In the two stage flash distilling plant, which of the pumps listed is vented to the shell of the second stage in order to remove vapor from the pump suction?()ACondenser circulating water pumpBFeed-water heater drain pumpCDistillate pumpDAir ejector condenser drain pump

单选题Topside icing that blocks freeing ports and scuppers().Ais usually below the center of gravity and has little effecton stabilityBwill cause water on deck to pocket and increase stabilityCmay decrease stability by increasing free surface effect due to water on deckDincreases the effective freeboard and increases thewind-heel affect

单选题Freeing ports on a vessel with soild bulwards().Aprevent stress concentration in the bulwarkBpermit easy jettison of deck cargo in an emergencyCprovide opening through the bulwarks for mooring linesDallow water shipped on deck to flow off rapidly

单选题Which of the following descriptions best identifies the operating principal of a flash-type evaporator?()ASea water is heated to boiling temperature while under a vacuumBSea water is passed over heated plates in a thin filmCHeated sea water is injected into a vacuum chamberDSea water is forced through a heated eductor

多选题What are three methods that may be use d to allow a switch to determine which ports to forward IP multicast messages to?()AIGMPBIGMP snoopingCPIMDCGMPEstatic assignmentFCDP

单选题Most drill ships and barges have a walled opening below the derrick,open to the water’s surface and through which various drilling tools can pass down to the sea floor called a ().Amoon poolBspider deck openingCpontoonDkeyway

单选题In a closed cooling water system, which of the problems can cause the water pressure to fluctuate?()AAn open vent in the cooling systemBA fouled sea chestCA restricted water passage in the engineDAir entrained in the cooling water

单选题The fresh water generator produces fresh water ().Aby cooling sea waterBby heating sea waterCby evaporation of sea waterDby purifying sea water