The hull is divided up into a number of watertight compartments by ______.A.inner bottom plating and longitudinalsB.decks and bulkheadsC.double bottom girdersD.topside and hopper tank sloping plating and longitudinals

The hull is divided up into a number of watertight compartments by ______.

A.inner bottom plating and longitudinals

B.decks and bulkheads

C.double bottom girders

D.topside and hopper tank sloping plating and longitudinals


相关考题:

Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A . Definitive, bottom up.B . Analogy, top down.C . Parametric, bottom up.D . Parametric, top down.E . Analogy, bottom up.

Risk event probability is defined as:A the total number of possible events divided into the expectations or frequency of the risk eventB the number of times the risk event may occurC the fraction of the total project tasks which may be affected by the risk eventD the total number of possible events divided into the consequences of the risk event.E A and B

144 Risk event probability is defined as:A. the total number of possible events divided into the expectations or frequency of the risk eventB. the number of times the risk event may occurC. the fraction of the total project tasks which may be affected by the risk eventD. the total number of possible events divided into the consequences of the risk event.E. A and B

50 Statistical cost estimating techniques (based upon history), are called _____ estimates and are a _____ approach.A. Definitive, bottom up.B. Analogy, top down.C. Parametric, bottom up.D. Parametric, top down.E. Analogy, bottom up.

Approaches towards reading and listening are __________. A.the bottom-up model and the top-down modelB.the bottom-up model and the interactive modelC.the bottom-up modelD.the top-down model and the interactive model

Watertight compartments are separated by ________A.engine roomsB.tweendecksC.dunnagesD.decks and bulkheads

The distance from the still water level (corrected for tides and storm surge) to the bottom of the hull of a ship is the ______.A.air gapB.freeboardC.penetrationD.water depth

Horizontal subdivision decks forming watertight compartments in the columns of a semisubmersible ship increase the unit's ______.A.tank capacitiesB.stability in the event of damageC.towing speedD.anchor holding ratio

For painting, the surface of a ship’s hull is divided into ()areas.A、twoB、threeC、fourD、five

The hull is divided by decks and ()(舱壁).A、holdsB、tanksC、bulkheadsD、hatches

()is applied to the area of the ship’s hull which is out of water when the ship is loaded.A、Boottopping paintB、Topside paintC、Bottom paintD、Primer

船体被甲板和舱壁分隔。()A、The hull is divided by decks and bulwarks.B、The hull is divided by decks and bulkheads.C、The hull is divided by engine room and bulkheads.D、The hull is divided by decks and holds.

船体被划分为一系列水密隔舱。()A、The hull is divided into a number of watertight compartments.B、The hull is divided into a number of gastight compartments.C、The hull is divided into a number of water compartments.D、The hull is divided into a number of tight compartments.

船舶由船体和上层建筑组成。()A、A vessel is made up of the hull and the superstructure.B、A vessel is made up of the hull and the bridge.C、A vessel is made up of the hull and the forecastle.

()(水密舱) are in the hull.A、Gastight compartmentsB、Watertight compartmentsC、Water compartmentsD、Tight compartments

单选题The hull is divided up into a number of watertight compartments by().Ainner bottom plating and longitudinalsBdecks and bulkheadsCdouble bottom girdersDtopside and hopper tank sloping plating and longitudinals

单选题The distance from the still water level (corrected for tides and storm surge) to the bottom of the hull of a ship is the().Aair gapBfreeboardCpenetrationDwater depth

单选题船体被甲板和舱壁分隔。()AThe hull is divided by decks and bulwarks.BThe hull is divided by decks and bulkheads.CThe hull is divided by engine room and bulkheads.DThe hull is divided by decks and holds.

单选题Insufficient space between the hull and bottom in shallow water will prevent normal screw currents resulting in ().Awaste of powerBsudden sheering to either sideCsluggish rudder responseDAll of the above

单选题()(水密舱) are in the hull.AGastight compartmentsBWatertight compartmentsCWater compartmentsDTight compartments

单选题船舶由船体和上层建筑组成。()AA vessel is made up of the hull and the superstructure.BA vessel is made up of the hull and the bridge.CA vessel is made up of the hull and the forecastle.

单选题Reserve buoyancy is().Aalso called GMBthe void portion of the ship below the waterline which is enclosed and watertightCaffected by the number of transverse watertight bulkheadsDthe watertight portion of a vessel above the waterline

单选题Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()APress up the slack NO.1 starboard double bottom tankBPump out the forepeak tankCEliminate the water in the 'tween decks aft

单选题Horizontal subdivision decks forming watertight compartments in the columns of a semisubmersible ship increase the unit’s().Atank capacitiesBstability in the event of damageCtowing speedDanchor holding ratio

单选题The distance between the bottom of the hull and the waterline is called ().AtonnageBreserve buoyancyCdraftDfreeboard

单选题船体被划分为一系列水密隔舱。()AThe hull is divided into a number of watertight compartments.BThe hull is divided into a number of gastight compartments.CThe hull is divided into a number of water compartments.DThe hull is divided into a number of tight compartments.

单选题Your vessel is listening 4°to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by th end with one foot of freeboard at the bow. Which action should you take first?()APress up the slack No.1 starboard double bottom tankBPump out the forepeak tankCEliminate the water in the tween decks aftDJettision stores out of the paint locker in the focsle