Faking a line means to______.A.arrange it on deck in long bightsB.stow it belowC.coil it down on deckD.put a whipping on it

Faking a line means to______.

A.arrange it on deck in long bights

B.stow it below

C.coil it down on deck

D.put a whipping on it


相关考题:

To “EASE” A LINE means to ___ .A.cast offB.double up so that one line does not take all the strainC.pay out line to remove most of the tensionD.slack it off quickly

A by means ofB in terms ofC with regard toD in line with

A fiber towing hawser is readied for service by ______.A.spooling it on a winch catheadB.coiling it in a counterclockwise direction on the fantailC.faking it on deck in a fore and aft directionD.spooling it on a reel lying on its side to prevent rolling

To "shore up" the main deck for the stowage of deck cargo means to ______.A.weld pad eyes on deck in proper position to secure the cargoB.strengthen the main deck by placing pillars underneath it in the tween-decksC.distribute the weight of the cargo by placing fore-and-aft planks on the main deckD.package the cargo in wooden crates so it will not damage the deck

A deck fitting,used to secure line or wire rope,consisting of a single body with two protruding horns is called a ______.A.BittB.BollardC.CapstanD.Cleat

Which statement about the deck line is TRUE ________.A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships pointB.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shellC.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trimD.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line

Laying out a line in successive circles flat on deck with the bitter end in the center is known as ______.A.coilingB.fakingC.flemishingD.Lining

Nobody knew_______there.( )A.how long time I had beenB.how long had I beenC.how long time had I beenD.how long I had been

“Ease the strain on the stern line” means “()”!A、Heave away the stern line.B、Take in the stern line.C、Slack the stern line.D、Heave in the stern line.

“In no time” means ().A、have no timeB、in a minuteC、a long timeD、a short time

Take to the forecastle deck an ()(油壶)and a hammer.A、oil canB、ropeC、heavy lineD、head line

“In no time” means().A、have no timeB、in a minuteC、a long timeD、on time

单选题The lifeline of a life float or buoyant apparatusshall().Abe at least 3/8 inch diameter and properly secured around the sides and ends of the deviceBbe festooned in bights not longer than three feet longChave a seine float in each bight unless the line is an inherently buoyant materialDAll of the above

单选题A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().AExemption spaceBTonnage deckCCofferdamDTonnage opening

单选题The phrase ‘in lieu of’ (line 2, paragraph 4) most probably means ______.Aon behalf ofBin line withCwith regard toDinstead of

单选题Faking a line means to().Aarrange it on deck in long bightsBcoil it down on deckCput a whipping on itDstow it below

单选题Instead of whipping an end of a line,a temporary means of preventing the line from unraveling is to tie a().Abecket bendBblackwall hitchCfigure-eight knotDsquare knot

单选题The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().Acoiling the lineBfaking down the lineCflemishing the lineDracking the line

单选题The duty of a deck winch is to lift and lower a load by means of a fixed rope on ().Aa warp endBa mooring winchCa worm gearDa barrel

单选题SINGLE UP FORWARD TO HEAD LINE AND SPRING means().Alet go all the lines forward including head line and springBlet go the head line and spring onlyClet go all the lines except a head line and a springDlet go the head line and spring including all the lines

单选题To “shore up” the main deck for the stowage of deck cargo means to().Aweld pad eyes on deck in proper position to secure the cargoBstrengthen the main deck by placing pillars underneath it in the tween-decksCdistribute the weight of the cargo by placing fore-and-aft planks on the main deckDpackage the cargo in wooden crates so it will not damage the deck

单选题To belay a line means to().Acoil it downBheave it tautCstow it belowDsecure it to a cleat

单选题Laying out a line in successive circles flat on deck with the bitter end in the center is known as().AcoilingBfakingCflemishingDlining

单选题A deck fitting,used to secure line or wire rope,consisting of a single body with two protruding horns is called a().AbittBbollardCcapstanDcleat

单选题How are lifelines attached to a life float?()ABy servingBBy splicing one end of the line around the apparatusCSecurely attached around the outside in bights no longer than three feetDWith an approved safety hook or shackle

单选题A horizontal the 450mm long and 25 mm wide cuts through the loadline disc.It is called the().Athe deck likeBplimssoll diseCplimssoll lineDsummer load line

单选题Right at the top is()It is 300 mm long and 25 mm wide with its upper edgs in line with the uppermost continuous watertight deck.Athe deck lineBPlimsoll discCPlimsoll lineDsunmmer load line