单选题The duty of a deck winch is to lift and lower a load by means of a fixed rope on ().Aa warp endBa mooring winchCa worm gearDa barrel

单选题
The duty of a deck winch is to lift and lower a load by means of a fixed rope on ().
A

a warp end

B

a mooring winch

C

a worm gear

D

a barrel


参考解析

解析: 暂无解析

相关考题:

The soundings on the chart are based on the depth of water available at ______.A.mean low waterB.mean lower low waterC.mean high waterD.mean high water springs

If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.A.when the line pull reaches the rated winch capacityB.after the line pull exceeds the rated winch capacityC.after a short build-up of torqueD.immediately

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the loadB.An electromagnetic brake will hold the load where it is suspendedC.The load will fall rapidly to the deck unless the foot brake is engagedD.The load will slowly lower to the deck under control of the drag of the winch motor

材料:An aircraft lift on board RFA Argus was loaded beyond its safe working load of 18.4 tonnes.There were no injuries to any personnel,or material damage to the ship or its equipment.During a planned stay in port,500 compressed CO2 cylinders were required to be landed.These were normally stowed on a lower deck and needed to be transferred to the weather deck before being taken ashore.Before the vessels arrival in port,the planned operation was discussed between various officers and senior ratings,one of whom was to supervise final discharge of the cylinders from the ship.Once in port,a senior rating gave instructions to three juniors to transfer a number of cylinders to the weather deck.He then left them alone to load the cylinders onto the platform. of an aircraft lift.The cylinders weighed 19.95 tonnes,which was greater than they had been instructed to load.In addition to this excess weight they added a fork lift truck weighing 5.5 tonnes.The lift was then raised.When it reached the weather deck,the lift was unable to stow at the correct level.When investigated it was discovered that the load of both CO2 bottles and the fork lift truck was greater than its safe working load(SWL)and this had prevented the locking cleats at the flight deck(weather deck)engaging.问题:The lift was taken out of service for testing and inspection. The safe working load of the aircraft lift is ________ tonnes.A.18.4B.19.95C.5.5D.500The aircraft lift was overloaded by a weight which is ________ more than its SWLA.1.55B.3.95C.5.5D.7.05It is implied in the passage that ________.A.the lift should be raised slowly to avoid the accidentB.the aircraft lift on board RFA Argus should be driven by super powerC.the senior rating should give instructions in more detail to the three juniors to transfer a number of cylinders to the weather deckD.if the unloading operation was supervised by an officer who has sufficient experience of the loads,lifting equipment and the overall operation,the accident would had been avoidedIt was the ________ that had prevented the locking cleats at the flight deck(weather deck)engaging.A.fork liftB.CO2 bottlesC.overloaded weightD.the three juniors请帮忙给出每个问题的正确答案和分析,谢谢!

The jumbo boom can ().A、lift heavy cargoB、load and unloadC、join ropes togetherD、lift light cargo

主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.

凝汽器热负荷(condenser duty condenser loAd)

The deck from bow to stern is called the ()(主甲板).A、main deckB、tweendeckC、upper deckD、lower deck

艇甲板()A、lower deckB、main deckC、boat deckD、‘tween deck

The pilot ask () to throw a heaving line to lift his bag.A、chief officerB、captainC、the duty sailorD、the second officer

()is in charge of the common tools of the deck department.A、The chief officerB、The duty sailorC、The bosunD、Captain

从船艏贯穿至船艉的甲板叫主甲板。()A、The deck from bow to stern is called the main deck.B、The deck from stern to bow is called the tweendeck.C、The deck from bow to stern is called the upper deck.D、The deck from stern to bow is called the lower deck.

A ()can give power to hoist or lower cargo.A、cargo winchB、lift winchC、derrickD、crane

甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.

单选题A flounder plate,on a topping lift,is().Aa fairlead blockBa swivel pin for the topping lift blockCa triangular steel plate with a hole at each cornerDthe lower block of a multiple part topping lift

单选题()is in charge of the common tools of the deck department.AThe chief officerBThe duty sailorCThe bosunDCaptain

单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.

单选题A ()can give power to hoist or lower the cargo.AcraneBlife winchCderrickDcargo winch

单选题救生艇置放在于艇甲板。()ALifeboat is located on the boat deck.BLifeboat is located on the main deck.CLife craft is located on the boat deck.DLifeboat is located on the lower deck.

单选题The pilot ask () to throw a heaving line to lift his bag.Achief officerBcaptainCthe duty sailorDthe second officer

单选题Please tell the duty AB to lower the ().AwinchBradarCgangwayDwindlass

单选题Please tell the duty AB to lower the ().AwinchBradarCgangwayDpilot ladder

单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().Awhen the line pull reaches the rated winch capacityBafter the line pull exceeds the rated winch capacityCafter a short build-up of torqueDimmediately

单选题Cribbing is().Awooden blocks or dunnage placed between a deck load and the deckBthe chains and shackles used to secure a deck cargoCa crate in which a deck cargo is packagedDcardboard separation pieces placed between deck loads to prevent chafing

单选题主甲板以下是二层甲板。()AThe deck below the lower deck is known as ‘tween deck.BThe deck below the main deck is known as ‘tween deck.CThe deck above the main deck is known as ‘tween deck.DThe deck below the lower deck is known as main deck.

单选题What does MBDD mean on the load waterline mark?().ATimber tropical load waterlineBTimber summer load waterlineCTimber winter load waterlineDTimber winter north Atlantic load waterline