单选题A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().AExemption spaceBTonnage deckCCofferdamDTonnage opening

单选题
A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().
A

Exemption space

B

Tonnage deck

C

Cofferdam

D

Tonnage opening


参考解析

解析: 暂无解析

相关考题:

Deck beams on a vessel are generally spaced at equal intervals and run ______.A.longitudinallyB.verticallyC.transverselyD.intermittently

Deck beams perform ______ of the following functions in the hull structure of a vessel.① They transfer deck loads to the frames;② They help to maintain the shape of the hull.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

It is possible,and sometimes necessary,to strengthen the deck of a vessel for carriage of deck cargo by ______.A.placing bunker on the deckB.building a stage on which to place the cargoC.welding steel feet to the deck,on which the cargo is placedD.erecting vertical pillars under the deck to support the cargo

Regulations define the bulkhead deck as ______.(subdivision and stability regulations)A.any deck extending from stem to sternB.the uppermost deck to which transverse watertight bulkheads extendC.the lowermost deck to which transverse watertight bulkheads extendD.the uppermost complete deck

Which statement about the deck line is TRUE ________.A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships pointB.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shellC.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trimD.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line

A partial deck in a hold is called a(n) ______.A.weather deckB.orlop deckC.shelter deckD.main deck

A vessel’s maximum stability is closely associated with which of the following?______. ① The angle of deck-edge immersion. ② The amount of freeboard.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

Between the side frames on a vessel, suppot for the deck beam is provided by ______.A.bracketsB.web framesC.deck stringersD.stanchions

Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing

In vessel construction, beam brackets are triangular plates that join the deck beam to a ____.A.bulkheadB.frameC.stanchionD.deck longitudinal

主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.

甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.

单选题The()is the intermediate deck between upper deck and the inside bottom of the vessel.AforcastleBtweendeckChatchesDpeak tanks

单选题If you are fighting a fire below the main deck of your vessel,which action is most important concerning the stability of the vessel?().AShutting off electricity to damaged cablesBPumping fire-fighting water overboardCManeuvering the vessel so the fire is on the lee sideDRemoving burned debris from the cargo hold

单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()AThe deck is divided into forecastle deck, main deck and poop deck.BThe deck is divided into forecastle deck, lower deck and main deck.CThe deck is divided into forecastle deck, main deck and lower deck.DThe deck is divided into main deck, lower deck and poop deck.

单选题If you are fighting a fire below the main deck of your vessel,which action is most importantconcerning the stability of the vessel? ()AShutting off electricity to damaged cablesBPumping fire-fighting water overboardCManeuvering the vessel so the fire is on the lee sideDRemoving burned debris from the cargo hold

单选题Deck beams on a vessel are generally spaced at equal intervals and run().AlongitudinallyBverticallyCtransverselyDintermittently

单选题It is possible,and sometimes necessary,to strengthen the deck of a vessel for carriage of deck cargo by().Aplacing bunker on the deckBbuilding a stage on which to place the cargoCwelding steel feet to the deck,on which the cargo is placedDerecting vertical pillars under the deck to support the cargo

单选题Assuming an even transverse distribution of weight in a vessel,which condition could cause a list?().AEmpty double-bottoms and lower holds,and a heavy deck cargoBFlooding the forepeak to correct the vessel's trimCHaving KG smaller than KMDHaving a small positive righting arm

单选题Which of the following electric motors would be the safest and most reliable to use on the main deck of a vessel in foul weather conditions?()ASealed motorsBDrip proof motorsCEnclosed motorsDWatertight motors

单选题You are loading a cargo that includes cylinders of acetylene aboard your break bulk vessel. Which statement is true? ()AThe cylinders must be stowed at least 10 horizontal feet from corrosive materials in the same spaceBStowage in the upper deck-deck is considered to be the equivalent of on deck stowage for this cargoCThe cylinders must have a red label for flammability and a green label for compressed gasDThe cylinders may be protected from the radiant heat of the Sun by laying a tarp on them

单选题Freeing ports on a vessel with soild bulwards().Aprevent stress concentration in the bulwarkBpermit easy jettison of deck cargo in an emergencyCprovide opening through the bulwarks for mooring linesDallow water shipped on deck to flow off rapidly

单选题If an air compressor is used to supply compressed air to outlets throughout the engine room and on deck of a vessel, the system is known as the ().Acombustion control air systemBsupply air systemCships service air systemDlow pressure deck air system

单选题The purpose of cant frames in steel vessel is().ATo support the overhang of the sternBTo strength the plating against the pounding of the seaCTo add srength to the deck beams which support the weather deckDTo support the plating of a cylindrical tank

单选题Cribbing is().Awooden blocks or dunnage placed between a deck load and the deckBthe chains and shackles used to secure a deck cargoCa crate in which a deck cargo is packagedDcardboard separation pieces placed between deck loads to prevent chafing

单选题The floors in a vessel’s hull structure are kept from tripping,or folding over,by().Aface platesBbottom longitudinalsClongitudinal deck beamsDtransverse deck beams

单选题Right at the top is()It is 300 mm long and 25 mm wide with its upper edgs in line with the uppermost continuous watertight deck.Athe deck lineBPlimsoll discCPlimsoll lineDsunmmer load line