is the output of the quality planning.A.Scope baselineB. Cost of qualityC.Scope checklistD.Quality checklist

is the output of the quality planning.

A.Scope baseline

B. Cost of quality

C.Scope checklist

D.Quality checklist


相关考题:

Project trade-offs vary betweenA . risk, cost and schedule.B . direct cost, indirect cost, and resource availabilityC . quality, schedule and timeD . cost, quality and scheduleE . contract terms, scope and budget

Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qualityBTime, risk, and qualityCRisk, quality, and manpower availabilityDCost, quality, and technical performanceECost, quality, and risk

A proven effective means to insure quality conformance is to:A . delegate accountability to subordinatesB . revise quality specifications to match quality measurementsC . train workers in proper quality methodsD . inspect quality into the productE . make quality a higher priority than cost or schedule

What is the relative priority of project Cost, Schedule and Quality?A . 1)Cost - 2)Schedule - 3)QualityB . 1)Quality - 2)Schedule - 3)CostC . 1)Quality - 2)Cost - 3)ScheduleD . 1)Schedule - 2)Quality - 3)CostE . All are of equal priority

Which of the following statements about the cost of quality are true?A . the cost of quality is the expense of nonconformance to requirements and specifications.B . the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.C . quality control programs should be implemented when the cost of quality are deemed affordable by management.D . A and B.E . A and C

The auditing function that provides feedback about the quality of output is referred to as:A . quality control.B . quality planning.C . quality assurance.D . quality improvementE . All of the above.

100 The auditing function that provides feedback about the quality of output is referred to as:A. quality control.B. quality planning.C. quality assurance.D. quality improvementE. All of the above

16 Which of the following statements about the cost of quality are true?A. the cost of quality is the expense of nonconformance to requirements and specifications.B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product. C. quality control programs should be implemented when the cost of quality are deemed affordable by management.D. A and B.E. A and C

130 What is the relative priority of project Cost, Schedule and Quality?A. 1)Cost - 2)Schedule - 3)QualityB. 1)Quality - 2)Schedule - 3)CostC. 1)Quality - 2)Cost - 3)ScheduleD. 1)Schedule - 2)Quality - 3)CostE. All are of equal priority

132 A proven effective means to insure quality conformance is to:A. delegate accountability to subordinatesB. revise quality specifications to match quality measurementsC. train workers in proper quality methodsD. inspect quality into the productE. make quality a higher priority than cost or schedule

98 Which of the following statements about the cost of quality are true?A. the cost of quality is the expense of nonconformance to requirements and specifications.B. the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.C. quality control programs should be implemented when the cost of quality are deemed affordable by management.D. A and B.E. A and C

3 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk

72 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget

● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk

is one of the quality planning outputs.A.Scope base lineB.Cost of qualityC.Product specificationD.Quality checklist

is one of the quality planning outputs. A.Scope base line B.Cost ofquality C.Product specification D.Quality checklist

● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.(75)A.Cost-Benefit analysisB.Control chartsC.Quality function deploymentD.Cost of quality analysis

“Cost of quality”is a project management concept that includes cost of( 73)A.exceedings requirementsB.Changes to the requirementsC.Ensuring conformance to requirementsD.The quality control requirements

()seeks to build confidence that a future output or an unfinished output, will be completed in a manner that meets the specified requirements and expectations.A.Quality assuranceB.Quality planC.Quality controlD.Quality metrics

Plan Quality is the process of identifying quality requirements and standards for the project and product and documenting how the project will demonstrate compliance ______ is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement and failing to meet requirements.A.Cost-Benefit analysisB.Control chartsC.Quality function deploymentD.Cost of quality analysis

The auditing function that provides feedback about the quality of output is referred to as( ).A.quality control B.quality planningC.quality assuranceD.quality improvement

( ) is the output of the quality planning.A.Scope baselineB.Cost of qualityC.Scope checklistD.Quality checklist

()seeks to build confidence that a future output or an unfinished output, will be completed in a manner that meets the specified requirements and expectations. A.Quality assurance B.Quality plan C.Quality control D.Quality metrics

()is the application of planned,systematic.quality activities to ensure that the project will employ all processes to meet requirements.A.Quality assuranceB.Quality planningC.Quality controlD.Quality cost

( )seeks to buildconfidence that a future output or an unfinished output, will be completed in amanner that meets the specified requirements and expectations. A.Quality assurance B.Quality plan C.Quality control D.Quality metrics

()is one of the quality planning outputs. A.Scope base line B.Cost of quality C.Product specification D.Quality checklist

() is one of the quality planning outputs.A、Scope base lineB、Cost of qualityC、Product specificationD、Quality checklist