● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
相关考题:
The financial closeout of a project dictates that:A.All project funds have been spent.B.No charge numbers have been overrun.C.No follow-on work from this client is possible.D.No further charges can be made against the project.E.All of the above.
For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:A . 1.4"B . 1.2".C . 1.0"D . 0.8"E . 0.2"
95 Which type of contract requires that the buyer keep the tightest labor/material cost control?A. Cost Plus Incentive FeeB. Cost Plus Percentage of CostsC. Cost Plus Fixed FeeD. Firm Fixed PriceE. Firm Fixed Price Plus Incentive
123 Which of the following constitute Juran's "quality trilogy":A. planning, inspection, control.B. planning, improvement, control.C. planning, organization, control.D. product, price, customer.E. design, build, deliver.
5 _____ is a narrative description of the work to be accomplished or resource to be supplied. A. Purchase orderB. Level of effort workC. Scope of workD. Contract stipulationE. None of the above
68 An acceptance control chart has limits that are based on the spec. limits for the product rather than limits which differentiate between random and assignable causes. Under which of the following circumstances should a QC manager consider this type chartA. When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing processB. When the number of samples outside the current control chart limits become too costly and cumbersome to investigate.C. When a process is subject to constant but stable tool wear.D. A and B.E. A and C
你正在为一家汽车公司管理一个开发新产品的项目。起初,这个产品被定义为“艺术型的个人交通工具”。后来,它又被描述为“不需要汽油的艺术型个人交通工具”。最后, 经过与设计工程师的详细讨论后,又将其描述为“不需要汽油,花费低于15,000美元而且 没有任何噪声的艺术型个人交通工具”。这表明了产品特征的逐步细化。但是,尽管产品的特征得到了不断的细化,它们还是必须按照下列哪项内容来进行仔细调整?A、适当的项目范围定义B、 项目干系人C、 范围变更控制系统D、 客户战略计划
为了法律上可行,以下所有的内容在合同中必须明确规定,除了:A、法定资格B、双方同意C、合适的合同形式D、定价