The Quality Risk _____ .A is minimized through continuous monitoring.B is considered a long term risk.C will be reflected in the in-service life of the project result.D B and CE All of the above.

The Quality Risk _____ .

A is minimized through continuous monitoring.

B is considered a long term risk.

C will be reflected in the in-service life of the project result.

D B and C

E All of the above.


相关考题:

Project trade-offs vary betweenA . risk, cost and schedule.B . direct cost, indirect cost, and resource availabilityC . quality, schedule and timeD . cost, quality and scheduleE . contract terms, scope and budget

Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qualityBTime, risk, and qualityCRisk, quality, and manpower availabilityDCost, quality, and technical performanceECost, quality, and risk

3 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk

72 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget

85 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk

154 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget

● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk

Tom _________ himself ________ to have got the medal. A. considered⋯luckilyB. proved⋯luckilyC. considered⋯luckyD. questioned⋯luckily

48______A. introducedB. recognizedC. identifiedD. considered

assuming the default switch configuration which vlan range can be added modified and removed on a cisco switch?() A.2 through 1001B.1 through 1001C.1 through 1002D.2 through 1005