你们团队设计了一个材料清单来定义项目的工作构成,而没有采用你推荐的工作分析结构(WBS)。一个客户注意到这个清单中没有涵盖项目范围变更的需求,后来这一变更需求被补充了进去。这是一个由下列哪项引起的变更要求的具体事例?( )A.一个外部事件B.产品范围定义中的错误或遗漏C.一项增值变更D.项目范围定义中的错误或遗漏
你们团队设计了一个材料清单来定义项目的工作构成,而没有采用你推荐的工作分析结构(WBS)。一个客户注意到这个清单中没有涵盖项目范围变更的需求,后来这一变更需求被补充了进去。这是一个由下列哪项引起的变更要求的具体事例?( )
A.一个外部事件
B.产品范围定义中的错误或遗漏
C.一项增值变更
D.项目范围定义中的错误或遗漏
相关考题:
The purpose of a dummy activity in an activity-on-arrow diagram is to:A.Identify a task that could be replaced by another.B.Take the slack time into account.C.Show a task that is not necessarily needed.D.Denote a milestone.E.Show a dependency relationship.
Which is not part of the purchasing cycle?A Defined needB Transmit needC InspectionD Prepare and issue purchase orderE A and D
1 A computer tape which contains historical project information is called ____ tape.A. DatabaseB. Baseline.C. Archive.D. Lessons learned.E. Life cycle summary
158 The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?A. In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.B. the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.C. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.E. A and D
200 A program is characterized as:A. a grouping or related tasks lasting one year or less.B. a unique undertaking having a definite time period.C. a grouping of similar projects having no definite end that supports the product(s) from cradle to grave. D. a project with a cost over $1 million.E. None of the above
29 When working in an environment that uses learning curves, the most effective plan for creating the perception that pay is related to performance is to provide the team members with an individual salary plus bonus based uponA. Individual productivityB. Cost effectivenessC. Group or team productivityD. Rating system developed by the project managerE. All of the above
153 A completion of a local government study resides on your critical path. This would most likely be referred to as:A. Soft logicB. Hard logicC. An external dependencyD. A mandatory dependencyE. A lost cause
91 The Project Manager has the responsibility of knowing what kind of message to send because his _____ may avoid communications barriers.A. business interfacesB. outputC. technical experienceD. prioritiesE. training methods
● Using the figure in the Special window, The critical path is:A A-B-GB C-GC C-DD E-FE A-B-G and C-D
以下关于项目环境中的沟通的陈述哪一项是正确的A、项目经理必须承担保证信息得到正确理解的主要责任B、有效率的会议,“作战室”和紧密的矩阵可以提高沟通效率C、如果项目包括12名成员,则存在4/8中可能的沟通渠道D、大多数项目经理花费他们工作时间的30%在沟通上