单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()AOrder a POWER5 HMCBConnect to the existing HMCCInstall an 8-port asynchronous card in the managed server to connect to the existing HMCDInstall an additional network card to the existing HMC and connect to the POWER5 service processor

单选题
Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
A

Order a POWER5 HMC

B

Connect to the existing HMC

C

Install an 8-port asynchronous card in the managed server to connect to the existing HMC

D

Install an additional network card to the existing HMC and connect to the POWER5 service processor


参考解析

解析: 暂无解析

相关考题:

An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc  B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc  D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()A、Connect to the network,power on the server,Micro-Partition the serverB、Connect to the HMC,power on the server,Micro-Partition the server,connect to the networkC、Power on server,connect to the network,Micro-Partition the server,connect to the HMCD、Power on the server,connect to the HMC,Micro-Partition the server,connect to the network

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、Asynchronous adapters on the new HMCC、The two 570 servers are directly connected to the new HMCD、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()A、Contact the IBM FTSS to replace the driveB、Contact the IBM CSR or SSR to replace the driveC、Order a replacement driveD、Contact IBM Service

An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A、The technical support specialist has completed a UNIX course at college.B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.C、The technical support specialist’s company sells $3M of UNIX computer systems every year.D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers

The account executive is asking about post-sales support for a new p5 HMC.  They need the pSeries technical specialist to configure an HMC with software support for the customer.  Which of the following should the specialist include in the configuration?()A、SupportlineB、ServiceSuiteC、Software Maintenance Agreement (SWMA)D、Machine Control Program Remote Support Agreement (MCPRSA)

A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room

ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()A、Configure the IP address through the first client partition.B、Configure the IP address through the ASMI menus.C、Configure the POWER5 service processor for DHCP from the HMC DHCP server.D、Configure the HMC to use the default IP address on the service processor when acquiring the managed server.

The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed.  The specialist discovers that the customer has never updated their VPD.  Which of the following HMC applications is used to gather the current VPD information?()A、Service ProcessorB、Service DirectorC、Inventory Scout ServicesD、Service Focal Point

A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing.  This system does not require an HMC.

A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A、Explain to the customer that they need an additional HMC for the POWER5 system.B、Obtain a PO from the customer to purchase additional serial connections to the HMC.C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()AConnect to the network,power on the server,Micro-Partition the serverBConnect to the HMC,power on the server,Micro-Partition the server,connect to the networkCPower on server,connect to the network,Micro-Partition the server,connect to the HMCDPower on the server,connect to the HMC,Micro-Partition the server,connect to the network

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMCBAsynchronous adapters on the new HMCCThe two 570 servers are directly connected to the new HMCDOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

单选题The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed.  The specialist discovers that the customer has never updated their VPD.  Which of the following HMC applications is used to gather the current VPD information?()AService ProcessorBService DirectorCInventory Scout ServicesDService Focal Point

单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them.  Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()AThe technical support specialist has completed a UNIX course at college.BThe technical specialist has supported several similar projects and has earned an IBM AIX certification.CThe technical support specialist’s company sells $3M of UNIX computer systems every year.DThe technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.

单选题The account executive is asking about post-sales support for a new p5 HMC.  They need the pSeries technical specialist to configure an HMC with software support for the customer.  Which of the following should the specialist include in the configuration?()ASupportlineBServiceSuiteCSoftware Maintenance Agreement (SWMA)DMachine Control Program Remote Support Agreement (MCPRSA)

单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()AA DCE domainBA Kerberos domainCA PPP tunnel between the serversDAn IPSEC tunnel between the servers

单选题ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical specialist perform to set the service processor network address for a static IP?()AConfigure the IP address through the first client partition.BConfigure the IP address through the ASMI menus.CConfigure the POWER5 service processor for DHCP from the HMC DHCP server.DConfigure the HMC to use the default IP address on the service processor when acquiring the managed server.

单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()AOrder a POWER5 HMCBConnect to the existing HMCCInstall an 8-port asynchronous card in the managed server to connect to the existing HMCDInstall an additional network card to the existing HMC and connect to the POWER5 service processor

单选题Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()AConnect to the network,power on the server,Micro-Partition the serverBConnect to the HMC,power on the server,Micro-Partition the server,connect to the networkCPower on server,connect to the network,Micro-Partition the server,connect to the HMCDPower on the server,connect to the HMC,Micro-Partition the server,connect to the network

单选题A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()AOrder a new HMC to support the p5 system.BAttach the new p5 system to the existing HMC.CUpgrade the existing HMC to accommodate both the POWER4 and p5 systems.DDo nothing.  This system does not require an HMC.

单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()AThe EMC storage specialist has not participated in the TDA meetingBThe FC HBAs are 4 Gbps technologyCThe Technical and Delivery Assessment review actions were not executedDThe customer should have checked that the HBAs are supported according to the HP storage interoperability matrix

单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()AA solution sizing questionnaireBVerify the customer has the proper racksCA Technical Delivery AssessmentDVerify the customer has enough cooling in the computer room

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()AAn additional switch for the new HMc  BAsynchronous adapters on the new HMcCThe two 570 servers are directly connected to the new HMc  DOne 570 is directly connected to the new HMC and the other is directly connected to the existing HMc