All cargo wires need to be ().A、greasedB、oiledC、washedD、repaired
All cargo wires need to be ().
- A、greased
- B、oiled
- C、washed
- D、repaired
相关考题:
All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo
Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.A.PreventersB.Side ropesC.StaysD.Guide lines
Many buildings in the city need repairing, but the one ______first is the library.A.repaired B.being repairedC.repairing D.to be repaired
Many buildings in the city need repairing, but the one_______ first is the library.A.repairedB. being repairedC. repairingD.to be repaired
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the ______.A.date of the testB.load at which a test sample brokeC.name of the vesselD.number of strands and of wires in each strand
All the cargo wires must be adjusted well.()A、所有的货物钢丝绳必须调整好。B、所有的货物钢丝绳必须修理好。C、所有的货物钢丝绳必须上油。D、所有的货物钢丝绳必须清洁好。
我们需要大量的绑扎钢丝。()A、We need plenty of clamps.B、We need plenty of lashing wires.C、We need plenty of cargo wires.D、We need plenty of lashing bars.
Before opening and closing the hatches, the spaces around the covers, all the parts and the gears should be ().A、clearedB、checkedC、removedD、repaired
这些绑扎工具必须要再次上紧。()A、These lashing tools must be tightened again.B、These lashing wires must be tightened again.C、These lashing bars must be secured again.D、These cargo wires must be loosened again.
The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires
()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire
Several sand boxes need ().A、to repair and renewB、repairing and renewingC、repair and renewD、repaired and renewed
单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().APut all the remaining cargo on starboard sideBPut light cargo on starboardside and heavy cargo on port sideCPut light cargo on port side and heavy cargo on starboard sideDA,B,C are all correct
单选题All the cargo wires must be adjusted well.()A所有的货物钢丝绳必须调整好。B所有的货物钢丝绳必须修理好。C所有的货物钢丝绳必须上油。D所有的货物钢丝绳必须清洁好。
单选题()cargo means to check all cargo loaded into or discharged from a vessel.ATallyingBExaminingCWeighingDHandling
单选题The damaged cargo is not allowed to export without().Arepairing or replacingBto repair or to replaceCbeing repaired or replacedDto be repaired or replaced
单选题()has more than ten percent broken wires. Stop using it at once.AThe cargo runnerBThe cargo blockCThe derrick slingDThe lashing wire
单选题All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().Adate of the testBload at which a test sample brokeCname of the vesselDnumber of strands and of wires in each strand
单选题opes or wires attached to derricks to prevent them from swinging during cargo handling operations are().APreventersBSide ropesCStaysDGuide lines
单选题这些绑扎工具必须要再次上紧。()AThese lashing tools must be tightened again.BThese lashing wires must be tightened again.CThese lashing bars must be secured again.DThese cargo wires must be loosened again.
单选题This cargo wires has more than ten percent () wires.AdamagedBbrokenCmissingDrepaired